Loading…
Loading…
Tender Value
₹4.9 L
EMD Value
₹5,000
Closing Date
18 May 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer (R & B) Division, Bharuch
S.R. to New Seva Sadan-1 (PWD) Office, Dist. Bharuch (Repairs to Outer Plaster Work, Colour Work, Plumbing Work, Flooring Work) (2nd Attempt).
304078
01 of 2026-27
Open
Civil Works - Buildings
Bharuch
1 document required · 1 mandatory
₹600
Executive Engineer, Bharuch (R&B) Division, Bharuch
₹5,000
10 May 2026
10 May 2026
10 May 2026
18 May 2026
10 May 2026
Name of Work : S.R. to New Seva Sadan-1 (PWD) Office, Dist. Bharuch (Repairs to
Outer Plaster Work, Colour Work, Plumbing Work, Flooring Work).
BILL OF QUANTITIES
Memorandum showing item of works to be carried out.
It. Item of Work Qty. Unit Rate in Total
No. Figures Amount
1 Removing and scraping of old deteriorated plaster of 722.00 Sqm 18.94
any thickness from wall / R.C.C member including
stacking of serviceable material and disposal of
unserviceable from site of work with all lead and lift.
2 Dismentaling tiled of stone floors laid in mortar 317.00 Sqm 46.77
including stacking of serviceable materials and
disposal of unserviceable materials with all lead and
3 20mm thick sand faced cement plaster on walls upto 722.00 Sqm 331.79
height 10 metre above ground level consisting of
12mm thick backing coat of CM. 1:3 (1-cement : 3-
sand) and 8mm thick finishing coat of CM. 1:1 (1
cement: 1-sand) etc. complete extra for scaffolding.
4 Applying two coats of (white cement based) or 722.00 Sqm 40.59
(acrylic lappy (putty) or equivalent and two coats
of primer of approved brand and manufacture on
new wall surface to give an even shade including
thoroughly brushing the surface free from mortar
dropping and other foreign matter and sand papered
smooth for All floor.
5 Finishing wall with Weather proof exterior acrylic 722.00 Sqm 114.53
emulsion paint With one coat of primer on wall
surface to give an required shape even shade after
thoroughly brushing the surface to remove all dirt,
and remains of loose powdered materials etc
complete for All floor.
6 P & L 24" x 24" vitrified 8 mm thick tile flooring over 10.08 Sqm 916.27
20 mm average) base of cement mortar 1:6 (
cement: 6 coarse sand) on new surface or fixing on
existing flooring by adhesive material including
dismentaling of existing flooring and jointed with
color cement slurry including finished with flush
pointing & cleaning the surface etc.
It. Item of Work Qty. Unit Rate in Total
No. Figures Amount
7 Providing and laying BITUMAT SYNROOF 292.00 Sqm 333.30
HI-BUILD, an elastomeric , premium quality acrylic
coating on terrace in two layers total of avg. 1 mm th.
waterproofing membrane finished which consist coat
of SYNROOF primer and middle layer of 80 GSM
geotextile with ultra violet resistance and working up
to any height with the 5 ears of guaranty against
New Construction and 3 years for Old buildings for
any leakage etc. complete as per detail specification
and as directed by Engineer In Charge.
i.e.Rs. Four lakh eighty six thousand six hundred nine and paise thirty nine only.
I/We am/are willing to carry out the work @ ______________ % above/below percent
(Should be written in figures and words) of the estimated rate mentioned above. Amount of
my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
1. The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills.
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C, Date:11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Above all items of "Schedule-B" with Item Description, Unit, Rate & Amount have
verified by me and found order.
Deputy Executive Engineer Sr. Divisional Account Officer Executive Engineer
City (R & B) Sub Division Bharuch (R & B) Division Bharuch (R & B) Division,
Bharuch Bharuch Bharuch
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E Tender Notice.pdf
STD BIDDING DOCUMENT.pdf
SCHEDULE-B.pdf
NOTES.pdf
SPECIFICATION INDEX.pdf
SPECIFICATION.pdf
SPECIFICATIONS OF MATERIALS.pdf
INDEX-GRs.pdf
GRs - Circulars - 1.pdf
GRs - Circulars - 2.pdf
Download all tender documents and submit your bid