Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.5 LAccepted-AOC | ₹15.5 L | L1 | Accepted-AOC Lowest Rate Offered |
| 2 | L2₹16.2 L+₹67,090 (4.33%)Rejected-Finance OPP INDUSTRIAL AREA BEHIND POST OFFICE JAGADHRI ROAD OPP INDUSTRIAL AREA AMBALA HARYANA 133006 | AMBALA | HARYANA | 133006 | ₹16.2 L+₹67,090 (4.33%) | L2 | Rejected-Finance As per Financial Bid Opening Summary |
| 3 | L3₹21.7 L+₹6.2 L (39.7%)Rejected-Finance | ₹21.7 L+₹6.2 L (39.7%) | L3 | Rejected-Finance As per Financial Bid Opening Summary |
Tender Value
₹23.1 L
EMD Value
₹23,140
Closing Date
1 Jun 2020, 3:00 pmClosed
EE(M)
O/o the EE (MECH) DUTTA TILLA MATRIPALLY
Supply, Installation, Trial Run, Commissioning and Operational Training complete of 0.5 (Half) Ton Per Hour capacity Seed Processing Plant Based on Paddy on TURN KEY basis .
2020_AGRI_10070_1
e-04/Agri/EE/MECH/2020-21
Open Tender
Composite Works
Lump-sum
180 days
Bamutia Tripura west
Eligible bidder to fulfil technical evaluation criteria of DNIEOI
9 documents required · 9 mandatory
₹1,000
E E (MECH), DEPT OF AGRI.
₹23,140
Agartala
27 Dec 2021
18 May 2020
2 Jun 2020
18 May 2020
1 Jun 2020
18 May 2020
18 May 2020 - 26 May 2020
26 May 2020
Supply, Installation, Trial Run and Commissioning of Seed Processing Plant having capacity not less than 0.50 (Half) Ton per Hour (Based on final processed Paddy seed & when processing activity is taken up with upto 25% impurities in paddy seed also) complete on “Turn Key Basis” with “Plant & Machineries” for following facilities. i). Pre-cleaner (Capable to clean seed with up to 25% impurities), ii). Grading by size (Based on width of seed), iii).Grading by density (Specific Gravity Separator), iv). Semi automatic bagging facility (without any electronics device but with support of Mechanical Device only ) as well as manual one. v).Holding bin over “Grading by density" & "Facility for semi automatic as well as Manual bagging " having capacity not less than 0.50 (Half) Ton per hour. vi) Mechanical handling equipment of seed to each activity when seed is feed in pre-cleaner and until stored in holding bin over semi automatic as well as manual bagging facility. vii)All equipments like "Cyclone" "Dust Canopy" etc. to make plant room dust free as per standard practice. viii).Operational training with demonstration of preventive maintenance procedure for 2(two) days not less than fourteen hours in total.
G.D. Agro Industries
OSAW AGRO INDUSTRIES PVT. LTD.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .