Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.4 L+₹52,520 (57.2%)Rejected-Finance 97 INDIRA COMPLEX T P NAGAR KORBA CHHATTISGARH 495677 | KORBA | KORBA | CHHATTISGARH | 495677 | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.5 L+₹55,981 (61.0%)Rejected-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | coalfields engineering works L3 | Pioneer Enterprises L2 | POOJA ELECTRICALS L1 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading : Partial rewinding of 01 No. Transformer M&B make oil cooled, 33K/3.3KV, 1.6 MVA, Sl. No. 12800 at Katkona 1&2 Incline of Katkona Sub Area | ||||||
| 1.01 | Electrolytic Grade Triple Paper insulated Copper Strip for Replacement of Primary Winding 01 Limb contains 08 Coils | 160 | Kg | 1,240 ₹1,98,400 | 1,300 ₹2,08,000 | 1,000 ₹1,60,000 Lowest |
| 1.02 | Re-Insulation of Triple Paper conductor of existing Secondary Winding | 316 | Job | 65 ₹20,540 | 20 ₹6,320 Lowest | 50 ₹15,800 |
| 1.03 | Repairing, Testing and Supervision Charge | 1 | Job | 32,841 ₹32,841 | 10,000 ₹10,000 Lowest | 12,000 ₹12,000 |
| 1.04 | Less Scrap Material Cost Note : Burnt Strip to be retained by Repairer | 160 | Kg | 650 ₹1,04,000 | 500 ₹80,000 Lowest | 600 ₹96,000 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Job | - | - | - |
Tender Value
₹1.8 L
EMD Value
₹2,200
Closing Date
24 Aug 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer ENM
Office of the General Manager SECL Baikunthpur Area
Partial rewinding of 01 No. Transformer M AND B make oil cooled, 33K/3.3KV, 1.6 MVA, Sl. No. 12800 at Katkona 1N2 Incline of Katkona Sub Area
2026_SECL_363398_1
SECL/GM/BKP/ENM/eTender/26-27/ 08
Open Tender
Civil Works - Others
Item Rate
30 days
Katkona
As per NIT
7 documents required · 7 mandatory
₹2,200
5 Nov 2026
10 Aug 2026
25 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
11 Aug 2026 - 17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading : Partial rewinding of 01 No. Transformer M&B make oil cooled, 33K/3.3KV, 1.6 MVA, Sl. No. 12800 at Katkona 1&2 Incline of Katkona Sub Area | |||||
| 1.01 | Electrolytic Grade Triple Paper insulated Copper Strip for Replacement of Primary Winding 01 Limb contains 08 Coils | 160 | Kg | 1,200 | ₹1,92,000 |
| 1.02 | Re-Insulation of Triple Paper conductor of existing Secondary Winding | 316 | Job | 65 | ₹20,540 |
| 1.03 | Repairing, Testing and Supervision Charge | 1 | Job | 31,881 | ₹31,881 |
| 1.04 | Less Scrap Material Cost Note : Burnt Strip to be retained by Repairer | 160 | Kg | - | - |
| 2Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.43 MB
Tendernotice_2.pdf
PDF • 0.11 MB
Tendernotice_3.pdf
PDF • 0.80 MB
Tendernotice_4.pdf
PDF • 0.14 MB
BOQ_376319.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .