| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.5 CrAccepted-AOC B 203 2ND FLOOR SHAPATH HEXA NR GUJARAT HIGH COURT OPP KARGIL PETROL PUMP S G HIGHWAY | ₹13.5 Cr Quoted ₹13.7 Cr | 1 | Accepted-AOC L1 Bidder |
| 2 | 2₹18.8 Cr+₹5.1 Cr (37.1%)Rejected-Finance | ₹18.8 Cr+₹5.1 Cr (37.1%) | 2 | Rejected-Finance L2 Bidder |
| 3 | 3₹22.0 Cr+₹8.3 Cr (60.7%)Rejected-Finance 714 RAHEJA CHAMBERS 213 NARIMAN POINT MUMBAI MAHARASHTRA 400021 | MUMBAI | MAHARASHTRA | 400021 | ₹22.0 Cr+₹8.3 Cr (60.7%) | 3 | Rejected-Finance L3 Bidder |
| 4 | 4₹80.7 Cr+₹67.0 Cr (488.6%)Rejected-Finance | ₹80.7 Cr+₹67.0 Cr (488.6%) | 4 | Rejected-Finance L4 Bidder |
Tender Value
₹7.2 Cr
EMD Value
₹10 L
Closing Date
4 May 2022, 4:00 pmClosed
Managing Director
Cochin International Airport Ltd., Kochi Airport PO, Kerala 683111, INDIA
Design, Supply, Installation, Testing and Commissioning of E-Boarding System (Digi-Yatra) at CIAL
2022_CIAL_476794_1
CIAL/COMMN/EGATE/2022/01
Open Tender
Miscellaneous Works
Item Rate
480 days
CIAL
Please refer NIT 6. in Tender documents.
5 documents required · 5 mandatory
₹0
₹10 L
30 Mar 2023
23 Feb 2022
5 May 2022
23 Feb 2022
4 May 2022
9 Mar 2022
23 Feb 2022 - 9 Mar 2022
Amount
PHASE 1
E-Gate (Narrow Lane) at Boarding gate: (E-Gate with integrated Bar-Code Reader and Facial Biometric Capture Device)
Supply
Installation, Testing & Commissioning
E-gate (Narrow Lane) at PESC area: (E-Gate with integrated Bar-Code Reader and Facial Biometric Capture Device)
Supply
Installation, Testing & Commissioning
E-gate (Wide Lane) at Entrance Gate : (E-Gate with integrated Bar-Code Reader and Facial Biometric Capture Device)
Supply
Installation, Testing & Commissioning
E-Gate (Narrow Lane) at Boarding gate: (E-Gate with integrated Bar-Code Reader and Facial Biometric Capture Device): SPARE
Supply
Installation, Testing & Commissioning
E-gate (Wide Lane) at Entrance Gate : (E-Gate with integrated Bar-Code Reader and Facial Biometric Capture Device) : SPARE
Supply
Installation, Testing & Commissioning
Access switches (24 port) including SFP
Supply
Installation, Testing & Commissioning
Monitoring PCs
Supply
Installation, Testing & Commissioning
Core Room Infrastructure: Hardware required for the entire system except CIAL's E-Boarding Software (Servers, storage, switches, Firewall, Patch cords and any other hardware components required in the core room)
Supply
Installation, Testing & Commissioning
Core Room infrastructure: Software required for the entire system except CIAL's E-Boarding Software (OS License, Database license & any other software licenses required)
Supply
Installation, Testing & Commissioning
Integration Cost of E-Gate system with CIAL’s E-Boarding software
25 mm PVC Conduit including accessories like bend, coupling, elbo, round box etc required for proper cabling, routing and termination/ 25 mm Casing Cap
Supply : 25 mm PVC Conduit (will be done as per actuals)
Laying & Commissioning : 25 mm PVC Conduit (will be done as per actuals)
CAT 6 UTP cabling
Supply: (will be done as per actuals)
Laying including Termination : (will be done as per actuals)
CAT 6 I/O (single port) with face plate, IO and back box:
Supply : CAT 6 I/O (will be done as per actuals)
Installation : CAT 6 I/O (will be done as per actuals)
CAT 6 Patch cords – 1 meter
Supply : (will be done as per actuals)
Installation : (will be done as per actuals)
CAT 6 Patch cords – 2 meter
Supply : (will be done as per actuals)
Installation : (will be done as per actuals)
CAT 6 24 Port Patch Panel with I/O modules
Supply :(will be done as per actuals)
Installation with accessories : CAT 6 24 Port Patch Panel (will be done as per actuals)
SC-LC SM OF Patch cord 3 metre
Supply : (will be done as per actuals)
Installation : (will be done as per actuals)
LC-LC SM OF Patch cord 5 metre
Supply : (will be done as per actuals)
Installation : (will be done as per actuals)
SFP Module (Single Mode)
Supply : (will be done as per actuals)
Installation : (will be done as per actuals)
Any other Hardware Cost for this Phase
Any other Software Cost for this Phase
Implementation Cost for Phase-1
PHASE 2
Hardware Cost (including servers, storage) for Integration of E-Boarding System (CIAL’s E-Boarding software & ABIS) with Digi-Yatra Ecosystem (consisting of Central Platform, Digi-Yatra App); including Operating system and Database licenses.
Supply
Installation, Testing & Commissioning
ABIS (Automatic Biometric Identification System) Software
Supply
Installation, Testing & Commissioning
Integration Cost of ABIS with CIAL’s E-Boarding software
Any other Hardware Cost for Phase 2
Any other Software Cost for Phase 2
Implementation Cost for Phase-2
Description of Work / Item(s)
Amount
COMPREHENSIVE OPERATIONS AND MAINTENANCE (O&M) CONTRACT (including all spares and consumables)
O & M Cost (Year 1) for Phase 1: including all spares and consumables (excluding manpower)
Manpower cost for 1 Onsite engineer per shift (Year 1)
Manpower cost for 1 Onsite Senior engineer on General duty (Year 1)
Remote Support (Year 1)
O & M Cost (Year 2) for Phase 1: including all spares and consumables (excluding manpower)
Manpower cost for 1 Onsite engineer per shift (Year 2)
Manpower cost for 1 Onsite Senior engineer on General duty (Year 2)
Remote Support (Year 2)
O & M Cost (Year 3) for Phase 1: including all spares and consumables (excluding manpower)
Manpower cost for 1 Onsite engineer per shift (Year 3)
Manpower cost for 1 Onsite Senior engineer on General duty (Year 3)
Remote Support (Year 3)
O & M Cost (Year 4) for Phase 1: including all spares and consumables (excluding manpower)
Manpower cost for 1 Onsite engineers per shift (Year 4)
Manpower cost for 1 Onsite Senior engineer on General duty (Year 4)
Remote Support (Year 4)
O & M Cost (Year 5) for Phase 1: including all spares and consumables (excluding manpower)
Manpower cost for 1 Onsite engineer per shift (Year 5)
Manpower cost for 1 Onsite Senior engineer on General duty (Year 5)
Remote Support (Year 5)
O & M Cost (Year 6) for Phase 1: including all spares and consumables (excluding manpower)
Manpower cost for 1 Onsite engineer per shift (Year 6)
Manpower cost for 1 Onsite Senior engineer on General duty (Year 6)
Remote Support (Year 6)
O & M Cost (Year 7) for Phase 1: including all spares and consumables (excluding manpower)
Manpower cost for 1 Onsite engineer per shift (Year 7)
Manpower cost for 1 Onsite Senior engineer on General duty (Year 7)
Remote Support (Year 7)
O & M Cost (Year 8) for Phase 1: including all spares and consumables (excluding manpower)
Manpower cost for 1 Onsite engineer per shift (Year 8)
Manpower cost for 1 Onsite Senior engineer on General duty (Year 8)
Remote Support (Year 8)
Additional O & M charges for Phase 2
Smart Chip Pvt Ltd
EMBROSS SYSTEMS PVT LTD
WAISL LIMITED
WAISL LIMITED
Smart Chip Pvt Ltd
EMBROSS SYSTEMS PVT LTD
US Dollar
European Euro
Portion of Quoted Rate in Currency
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
US Dollar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .