| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC | L1 | Accepted-AOC Agreement executed | |
| 2 | L2₹14.5 L+₹5,664.47 (0.39%)Rejected-Finance | L2 | Rejected-Finance Higher rate |
Tender Value
₹13.2 L
EMD Value
₹33,065
Closing Date
27 Dec 2019, 4:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, PWD Roads Sub Division,vatakara
Construction of drain
2019_PWD_324886_2
D2/TN/11/2019-20(11)
Open Tender
Civil Works - Roads
Item Rate
90 days
Vataka
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
online
₹33,065
Yes
17 Jun 2020
18 Dec 2019
31 Dec 2019
18 Dec 2019
27 Dec 2019
18 Dec 2019
Amount
appendix -A -Constrution of drain
2.4.2.A : Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres <br> Cement Concrete Grade M-15 & M-20 - By Mechanical Means <br>Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
3.13.1.B : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
od48773/2018_2019 : Earth work excavation in all classes of soil including removal of garbage, old plastic bags and other debris from the chalked culvert and from the berms of road conveying the deposit of soil and garbage anywhere with in 5km from the site including all labour charge, hire charge of lorry, loading and unloading etc.. complete.
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork) <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork)
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.D.1.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> PCC Grade M25 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M25 - Using Concrete Mixer
od48848/2018_2019 : Lifting, conveying and Re fixing the existing RCC covering slabs ( good condition) of any thickness on top of drain in position including all labour charges of lifting from the possession , conveying to suitable place and conveying to the new possession were ever required including miscellaneous expenses etc complete.
13.6 : Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical SpecificationsSupplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
C.Anilkumar
Bidder Name
C.Anilkumar
N.K PURUSHOTHAMAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_459283.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .