Loading…
Loading…
Tender Value
₹4.6 L
EMD Value
₹11,442
Closing Date
6 Jun 2026, 1:30 pmDue tomorrow
AEE pwd roads sub division ponnan
AEE pwd roads sub division ponnan
DEPOSIT AIRTEL DEPOSIT WORK RESTORATION WORK FOR EDAPPAL TAVANUR ROAD CH 0/000 to3/450 and5/500 to 6/150
2026_PWD_853290_1
PWD/RB/TR/4412/2026_5_1_1/2
Open Tender
Civil Works - Roads
90 days
PONNANI
DEPOSIT AIRTEL DEPOSIT WORK RESTORATION WORK FOR EDAPPAL TAVANUR ROAD CH 0/000 to3/450 and5/500 to 6/150
11 documents required · 11 mandatory
₹1,010
Yes
₹11,442
Yes
29 May 2026
29 May 2026
8 Jun 2026
29 May 2026
6 Jun 2026
29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1RESTORATION WORK | ||||||
| 1.001 | 3.13.1.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Manual Means - (Depth upto 3 M) | 1 | cum | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | OD346179/2025-2026:Supplying and filling with granular material in the slushy area to achieve adequate bearing strength and for drainage layer laid in the line and level, and compacted | 1 | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | - | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 1 | cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | OD346234/2025-2026:Filling up potholes with bituminous ready mix compound (25kg) and compacting by ramming to get a compact surface including of cost of material, laying charges, transportation to site etc complete Rate is arrived for a bag of 25kg | - | each | - | - | BI01010001010000000000000515BI0100001118 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
Tendernotice_2.pdf
PDF • 0.05 MB
BOQ_1441998.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid