Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹48.4 L+₹7.2 L (17.4%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹37.5 L
EMD Value
₹50,000
Closing Date
26 Sept 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Executive Engineer
The Executive Engineer Roads Division Kollam
GENERAL RM 2022-23 cluster 2 one year RC Karunagappally KLM-RM 2022-23 Zone 6 One year Running Contract for Various PWD Roads Under Roads Section Karunagappally in Kollam District 6 road stretches for a length of 19.70 Km
2023_PWD_562650_9
136/ET/EE/2022-23
Open Tender
Civil Works - Roads
Item Rate
360 days
Kollam
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
16 Oct 2023
19 Sept 2023
28 Sept 2023
19 Sept 2023
26 Sept 2023
19 Sept 2023
Amount
Appendix A Reactive Maintenance/Initial rectification
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD98821/2023-2024:Providing,laying and rolling of close graded pre mix carpet of 20mm thickness composed of 11.2mm to 0.09mm(MORTH-M-041) aggregates premixed using viscosity grade Bitumen usingVG30 to the required line gradeand level to serve as wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a smooth wheeled roller 8-10 tonne capacity and finishing to required level and grade
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
Appendix B Premonsoon works
OD98822/2023-2024:Engaging Hydraulic excavator of 1 cum bucket capacity asper the direction of officers in charge
OD98823/2023-2024:Engaging tipper for conveying waste and debris from places as directed by the departmental officers in charge
OD98824/2023-2024:Fillling up pot holes with bituminous ready mix compound(25kgbag) and compacting by rammming to get a compact surface including cost of material,laying charges,transportation to site etc complete.(rate is arrived for a bag of 25 kg)Assuming that an average of 30 bag of 25kg ready mix compound will be laid in pot holes in a day. Assuming that an average of 30 bag of 25 kg ready mix compound will be laid in pot holes in a day
OD98825/2023-2024:Engaging mazdoor for lowering side berms ,clearing side berms, clearing side drains ,removing silt and clay from culverts and BT surface,cutting earthen drains,diverting blocked water,removing the branches of fallen trees or trees leaned towards the road clearing traffic blockage ,stack the wood at suitable place and various works as directed by engineer in charge
Appendix C Proactive/Preventive Maintenance
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
55.25:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD98817/2023-2024:Providing,laying and rolling of close graded pre mix carpet of 20mm thickness composed of 11.2mm to 0.09mm(MORTH-M-041) aggregates premixed using viscosity grade Bitumen usingVG30 to the required line gradeand level to serve as wearing course on a previously prepared base including mixing in a suitable plant laying and rolling with a smooth wheeled roller 8-10 tonne capacity and finishing to required level and grade
10.5.1a:Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - For grading I Material
Appendix D-Road Emergency works
OD98818/2023-2024:Engaging Hydraulic excavator 1cum bucket for various works as directed by the departmental officer in charge
OD98819/2023-2024:Engaging Man mazdoor for lowering side berms,clearing side berms,clearing side drains,removing silt from culverts,cutting earthen drains,diverting blocked water,removing the branches of trees leaned towards the road threatening pedestrains and traffic and removal of fallen trees or branches on the road clearing traffic blockage,stack the wood at suitable place, clearing silt and clay deposited in the BT surfaceand various works as directed by engineer in charge etc
OD98820/2023-2024:Engaging tipper for conveying materials and debris as per the direction of departmental officers in charge
Appendix E-Routine Inspection Charges
OD98816/2023-2024:Conducting and Reporting Routine Inspections for the entire length of the Project Road frequency of 7 days throughout the agreement period of the Running Contract as directed by the departmental officers at site. Additional RI may be required in response to reports of complaints from the police, other authorities and the public as a result of major incidents, typhoon or flooding damages etc and are not measurable/ payable. A proportion of the RI should be carried out either during or immediately following a period of we weather.
SHIBI VALIYATH
Bidder Name
SHIBI VALIYATH
MUHAMMED AFSAL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_900686.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .