Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹8.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹9.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹9.3 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | C G BAHULEYAN L2 | Prasannakumar L G L1 |
|---|---|---|---|---|---|
| 1.00Working charges | |||||
| 1.00 | 18.12.8:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work80 mm dia nominal bore | 800 | metre | 1,095 ₹8,76,000 | 1,035 ₹8,28,000 Lowest |
| 1.00 | 18.17.6:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :80 mm nominal bore | 2 | each | 6,500 ₹13,000 | 2,508.5 ₹5,017 Lowest |
| 1.00 | OD83588/2026-2027:Providing and fixing air valve on the prprosed line to prevent any kind of air locking due to undulated terrain on swami ayyappan road. | 3 | no | 2,000 ₹6,000 | 1,649.6 ₹4,948.8 Lowest |
| 1.00 | 18.46.8:Providing and fixing G.I. Union in G.I pipe including cutting and threading the pipe and making long screws etc. complete ( New work):80 mm nominal bore | 2 | each | 1,300 ₹2,600 | 1,195 ₹2,390 Lowest |
| 1.00 | OD83586/2026-2027:Cutting, grinding and welding three runs for GI pipe and specials by gas or electric plant three run welding including cost of welding rod/gas, all labor ,hire charges for tools etc complete : 80 mm Dia | 550 | cm | 17.5 ₹9,625 | 16.9 ₹9,295 Lowest |
| 1.01 | OD83585/2026-2027:Interconnecting the newly laid 80 mm GI pipe with existing line at suitable portions including cutting, welding, grinding if neccessary with all incidental works as per the direction of departmental officers. | 2 | no | 1,500 ₹3,000 | 1,076.5 ₹2,153 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 10.8 | sqm | 500 ₹5,400 | 346.7 ₹3,744.36 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.96 | cum | 10,000 ₹9,600 | 8,293.9 ₹7,962.14 Lowest |
Tender Value
₹9.6 L
EMD Value
₹24,040
Closing Date
14 Aug 2026, 6:00 pmClosed
Assistant Executive engineer
P.H Sub Division, Ranni
Others ME 1202 CWSS to Sabarimala and Pampa Providing distribution line from Charalmedu to 5th curve through Swami Ayyappan road General Civil Work
2026_KWA_864047_1
13/2026-27/AEE/PH/RANNI
Open Tender
Civil Works - Water Works
Item Rate
90 days
Pampa
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,120
₹24,040
19 Aug 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Working charges | |||||
| 1.001 | 18.12.8:Providing and fixing G.I. pipes complete with G.I fittings including trenching and refilling etc. External work80 mm dia nominal bore | - | metre | - | - |
| 1.002 | 18.17.6:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :80 mm nominal bore | - | each | - | - |
| 1.003 | OD83588/2026-2027:Providing and fixing air valve on the prprosed line to prevent any kind of air locking due to undulated terrain on swami ayyappan road. | - | no | - | - |
| 1.004 | 18.46.8:Providing and fixing G.I. Union in G.I pipe including cutting and threading the pipe and making long screws etc. complete ( New work):80 mm nominal bore | - | each | - | - |
| 1.005 | OD83586/2026-2027:Cutting, grinding and welding three runs for GI pipe and specials by gas or electric plant three run welding including cost of welding rod/gas, all labor ,hire charges for tools etc complete : 80 mm Dia | - | cm | - | - |
| 1.006 | OD83585/2026-2027:Interconnecting the newly laid 80 mm GI pipe with existing line at suitable portions including cutting, welding, grinding if neccessary with all incidental works as per the direction of departmental officers. | - | no | - | - |
| 1.007 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.008 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
stage.html
html • 0.02 MB
finance_1461887.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.66 MB
Tendernotice_3.pdf
PDF • 0.08 MB
Tendernotice_4.pdf
PDF • 0.15 MB
Tendernotice_5.pdf
PDF • 0.08 MB
Tendernotice_6.pdf
PDF • 0.03 MB
BOQ_1461887.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].