Tender Value
₹21.5 L
EMD Value
₹44,000
Closing Date
23 Aug 2021, 11:30 amClosed
Executive Engineer
Executive Engineer NH Division HPPWD Nahan
Restoration of rain damages to NH 907 Nahan Do Sarka Sarahan Kumarhatti road Km 0/00 to 78/00 (SH P/L GSB Wet Mix Dence grade bituminous and Bituminous concrete in various RD between Km 0/00 to 5/00)
2021_MoRTH_641777_1
NIT No. 2192-2300 dated 26.07.2021
Open Tender
Civil Works - Highways
Item Rate
90 days
Nahan
Refer tender document
8 documents required · 8 mandatory
₹500
RPAO MoRTH Chandigarh
₹44,000
24 Dec 2021
4 Aug 2021
24 Aug 2021
4 Aug 2021
23 Aug 2021
4 Aug 2021
Amount
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.including all leads, lifts and carriage of materials as per the direction and entire satisfaction of the Engineer-in-charge.
Granular Sub-Base with Coarse Graded Material (Table:- 400- 2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. including all leads, lifts and carriage of materials as per the direction and entire satisfaction of the Engineer-in-charge.
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. including all leads, lifts and carriage of materials as per the direction and entire satisfaction of the Engineer-in-charge.
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.including all leads, lifts and carriage of materials as per the direction and entire satisfaction of the Engineer-in-charge.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.for DBM and BC Layer including all leads, lifts and carriage of materials as per the direction and entire satisfaction of the Engineer-in-charge.
Providing and laying 125mm thick (One hundred twenty five millimeters) dense grade bituminous macadam on prepared surface with 60-90 (Sixty- Ninety) Tonne per hour ( TPH) capacity batch type computerized Hot Mix Plant production average out put 75 tonne ( Seventy five ) TPH using crushed stone aggregate Grading –II(two) of item 504 of MORT&H specification ( latest revision revision) premixed with VG-40 grade Bitumen as per approved Job Mix formula with minimum bitumen content of 4.25 percent transporting the mixed materials with tipper and laying with hydrostatic paver finisher with sensor to the required grade and rolling with smooth wheels vibratory and tandom rollers to achieve desired density as per item 507 of MORT&H specification ( latest Revision ) in all leads and lifts and including all corrective measures wherever required such as profile correction patching of pot holes sealing of cracks for all depths as per direction of the Engineer-in-Charge. Nothing extra will be paid for increasing bituminous contents as per job mix formula.
Providing and laying 40mm(forty milimeters) thick bituminous concrete with 60-90( Sixty to ninety) TPH capacity batch type computerized HMP using crushed aggregates of specified grading-II premixed with VG-40 bituminous binder as per job mix formula with minimum binder content of 5.5% of total weight of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 509 (Latest revision) complete in all respects including all leads and lifts and as per the entire satisfication of the Engineer-in-Charge. Nothing extra will be paid for increasing bituminous contents as per job mix formula.
nitinconstruction
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .