Loading…
Loading…
Tender ID
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
20 Apr 2026, 4:00 pmClosed
EXECUTIVE ENGINEER WSMP DIVISION SGR
OFFICE OF THE EXECUTIVE ENGINEER WSMP DIVISION SGR
RECTIFICATION ARRESTING OF LEAKAGES IN 1200MM DIA PSC, 750 700 300MM DIA CI DI TRUNK MAINS BY WAY OF PROVIDING AND FIXING OF STEP COLLARS AND REPLACING OF DAMAGED PSC PIPE INCLUDING REPAIRS TO MS SLUICE CHAMBERS AND LIDS ALONG TRUNK MAINS FROM RANG
2026_PHE_307468_6
E-NIT No.01/WSMP of 04-2026 Date-07/04/2026
Open Tender
Civil Works - Water Works
Percentage
365 days
SRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER WSMP DIVISION SGR
₹7,000
Yes
7 Apr 2026
7 Apr 2026
21 Apr 2026
7 Apr 2026
20 Apr 2026
7 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 meters:
i. All kinds of soil : | - | Cum | - | - |
| - | ii. Ordinary Rock | - | Cum | - | - |
| - | Extra for additional lift of 1.5 mtr or part thereof in excavation/banking excavated or stacked material.
i. In all kinds of soils. | - | Cum | - | - |
| - | ii. Ordinary or hard rock. | - | Cum | - | - |
| - | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge.
i. All kinds of soil : | - | Cum | - | - |
| - | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. | - | Kl | - | - |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | - | Cum | - | - |
| - | Disposal of surplus excavated material by mechanical transport including loading, unloading & stacking. (Deductions on account of use of departmental men and machinary shall be as per actual).
i. For an avg lead of 1km. | - | Cum | - | - |
| - | ii. For an avg lead of 2km. | - | Cum | - | - |
| - | iii. For an avg lead of 3km. | - | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tendernotice_2.pdf
PDF • 0.45 MB
BOQ_997514.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .