Tender Value
₹21.5 L
EMD Value
₹43,040
Closing Date
12 Oct 2026, 6:00 pm
GE(P) (AF) Halwara
GE(P) (AF) Halwara-141106
PROVISION OF O-LEVEL LAB AT AF STATION HALWARA
2026_MES_790157_1
GE (P)/Hal-02/2026-27
Open Tender
Civil Works
Item Rate
120 days
Halwara
As per cover 1
8 documents required · 8 mandatory
₹500
Yes
GE (P) (AF) Halwara
₹43,040
Yes
19 Sept 2026
19 Sept 2026
14 Oct 2026
19 Sept 2026
12 Oct 2026
5 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (A) Supply ,fix & install of 6 mm thick electrostatic dissipative flooring system complete all as specified and directed by Engineer-in-Charge with following specification:-
(i) Surface Preparation of concrete substratewith grinding equipment to remove dust, laitance, other contaminants etc., and to form the required anchor profile on the floor substrate. Repairing of damaged portion of concrete with epoxy based mortar and washing the floor with water to a SSD condition.
(ii) Suitably prime the prepared surface with 1-2 coats of water based epoxy primer ensure proper bonding with substrate.
(iii) Providing and Applying 4 mm thick layer of epoxy modified cementitous screed provide a strong underlay having compressive strength >50 MPA for subsequent layers. Allow the screed to cure for min 24 hours.
(iv) Check the moisture content of the screed layer. Once the same is < 4% please proceed with min one coat of epoxy based primer coating ensure complete sealing of pin holes of screed
(v) Providing and Installing self-adhesive copper tape grid of minimum 20 mm x 0.1mm thick size as per manufacturers guideline and layout of the floor area of each grid 3 mtr X 3 mtr.
(vi) Providing and applying 1 coat of epoxy based conductive primer Florprime ESD having electrical resistance of 5 x 10^4 – 10^8 ohms.
(vii) Providing and Applying 2mm thick layer of PU based electrostatic dissipative flooring which meets the requirements laid in BS 2050/ASTM 150 F and electrical resistance of 5 x 10^4 – 10^9 ohms.
Make- Sika/Fosroc/Bostik complete all as specified and directed. | 340 | Sqm | - | - |
| 2 | Supply & Installation of chemical earthing system consising of Tripod ( 3 No earthing of Copper vonded earth rod of 12 feet length) 17.2mm dia made of high tensile low carbon steel circular rods, molecularly bonded with 99.9% electoly c grade copper on outer surface (min copper bonding thickness 250 microns length 3000mm with exothermically jointed copper bus bar of 25x6x200mm. The copper bonded rod and the exothermic joint together should be tested by CRPI on 25KA foult current the eath rod should be certified by underwriters laboratories coforming to UL467 an international standard for grounding and bonding equipment.With ROHS tested 50 kg earth enhancing compound with each rod having passed leaching, sulphur, corrossion , tesisitivity test as per IEC-625617 an international standard for earth enhancement compound by NABL accredit Lab. with 12 mtr inter connect on copper strip size 25x 3mm.The test result should be not less than 01 ohm and EN(Earth -Neutral) voltage less than 01 volt..Complete all as specified and directed | 5 | Each | - | - |
| 3 | Supply and fix earth continuty of copper strip 25x3 mm burried in ground or any other indicated situation for loop earthing etc all as specified and directed with wall mounting bracket complete all as specified and directed by Engineer-in-Charge | 100 | RM | - | - |
| 4 | M&L test point terminal block made of gun metal of phosphorus bronze 75mmx75mmx25mm, drilled and screw complete all as specified and directed by Engineer-in-Charge. | 2 | Each | - | - |
| 5 | S&F emergency push button electrically connected with electric panels to isolate the Lab electric panels NO/NC contactor,relay fixed in suitable size of sheet metal enclouser and control wiring power supply for 240/440V, 50Hz and fixed to wall near entrance of Lab complete all as specified and directed by Engineer-in-Charge. | 2 | Each | - | - |
| 6 | S&F electrical switch board, indoor type, made out of mild steel CRCA sheet 2mm thick sheet, front coverwith 3mm halem sheet, wall mounted to accommodate complete all as specified and directed by Engineer-in-Charge and comprising of the following accessories:-
a) Emergency push button to disconnect all three power supply excluding lighting - 01 Nos
b) 115V/400 Hz/3P (25 kVA) switch & socket outlets, to CEE connector 3P, 208V, 5x16A, 2H, generated by USI - 01 Nos
c) 220V (10 kVA), switch & socket outlets 16A, backed up by the UPS - 01Nos
d) 220V, 50 Hz, switch & socket outlets 16A, backed up by the main power supply - 04 Nos
e) Indepent indicators, LED type for all three type supply
f) Electro static discharge measuring point - 02 Nos
g) MCB TPN 40Amp-01 No.
h) MCB SPN 50 Amp - 02 Nos
j) 28V DC 10A socket-01 Nos.complete all as specified and directed | 1 | Each | - | - |
| 7 | S&F online UPS for 30 min backup single phase AC input 160 to 260V and output 230 ±1% of minimum capacity 5 KVA complete all as specified and directed by Engineer-in-Charge with following specification :-
(a) Frequency : 50 hz
(b) Transfer time AC to inverter mode : <5 msec
(c) Efficiency : More than 90%
(d) Battery charging current : 8 Amp
(e) Battery specification : 12V/ 65 AH
(f) No of batteries : 16
(g) Battery type : Tubular, including rack made of MS angle
(h) Indication on LCD display : Load level, battery level, AC mode, Battery
(i) Alarms : Battery made, Low battery, Overload, Fault
Make for UPS : Microtek/ Luminous/ Su-Kam complete all as specified and directed | 1 | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
td02.pdf
Tender Documents • 0.71 MB
BOQ_885776.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .