Loading…
Loading…
Tender Value
₹1 Cr
EMD Value
₹2 L
Closing Date
24 Jun 2026, 6:00 pm7d left
xen
kalakote
Macadamization of Teryath Sarooti road
2026_PWDJK_312513_4
eNIT No 19 of 2026/27 Dated 15/06/2026
Open Tender
Civil Works
60 days
kalakote
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
xen
₹2 L
15 Jun 2026
15 Jun 2026
25 Jun 2026
15 Jun 2026
24 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and stacking at site Graded crushed stone aggregate of size 63 to 45mm | 247 | Cum | 1,204.15 | ₹2,97,425.05 |
| 2 | Laying, spreading and compacting stone aggregate of specified sizes to
WBM specifications in uniform thickness, hand picking, rolling with 3
wheeled road / vibratory roller 8-10 tonne capacity in stages to proper
grade and camber, applying and brooming requisite type of screening
/binding material to fill up interstices of coarse aggregate, watering and
compacting to the required density. | 247 | Cum | 768.15 | ₹1,89,733.05 |
| 3 | Supplying and stacking at site Graded crushed stone aggregate of size 13.2 mm | 37 | Cum | 1,204.15 | ₹44,553.55 |
| 4 | Good Earth | 20 | Cum | 281.3 | ₹5,626 |
| 5 | Providing, laying, spreading and compacting graded stone aggregate (size
range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification
including premixing the material with water at OMC in mechanical mix
plant, carriage of mixed material by tipper to site, for all leads & lifts,
laying in uniform layers with mechanical paver finisher in sub- base / base
course on well prepared surface and compacting with vibratory roller of 8
to 10 tonne capacity to achieve the desired density, complete as per
specifications and directions of Engineer-in-Charge | 371 | Cum | 1,885.95 | ₹6,99,687.45 |
| 6 | Providing and applying tack coat using hot straight run bitumen of grade –
VG-10, including heating the bitumen, spraying the bitumen with
mechanically operated spray unit fitted on bitumen boiler, cleaning and
preparing the existing road surface as per specifications.
On W.B.M. @ 0.75 Kg/sqm | 4,950 | sqm | 74.35 | ₹3,68,032.5 |
| 7 | Providing and applying tack coat using hot straight run bitumen of grade –
VG-10, including heating the bitumen, spraying the bitumen with
mechanically operated spray unit fitted on bitumen boiler, cleaning and
preparing the existing road surface as per specifications.On bitumen surface @ 0.50 Kg/sqm. | 13,860 | sqm | 55.2 | ₹7,65,072 |
| 8 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stone chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG-30 with no solvent | 18,810 | sqm | 268.15 | ₹50,43,901.5 |
| 9 | Providing and laying seal coat of premixed fine aggregate (passing 2.36
mm and retained on 180 micron sieve) with bitumen using 128 kg of
bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum
of fine aggregate per 100 sqm of road surface including rolling and
finishing with road all complete. | 18,810 | sqm | 101.4 | ₹19,07,334 |
| 10 | Surface dressing of the ground including removing vegetation and in-equalities
not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto
1.5 m in -All kinds of soil. | 2,580 | sqm | 24.12 | ₹62,229.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_1011654.xls
BOQ • 1.71 MB
Download all tender documents and submit your bid