| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.8 LAccepted-AOC | ₹3.8 L | L-1 | Accepted-AOC Found Lowest One |
| 2 | L-2₹3.9 LRejected-Finance 346 2 RAMBIR COLONY RAILWAY ROAD JIND JIND JIND JIND HARYANA 126102 | JIND | HARYANA | 126102 | ₹3.9 L | L-2 | Rejected-Finance High rate qouted |
| 3 | L-3₹4.0 LRejected-Finance NOT AVAILABLE | ₹4.0 L | L-3 | Rejected-Finance High rate qouted |
| 4 | L-4₹4.6 LRejected-Finance V P O SEHAL TEHSIL BAIJNATH DISTT KANGRA H P | MANDI | HIMACHAL PRADESH | 175013 | ₹4.6 L | L-4 | Rejected-Finance High rate qouted |
| 5 | L-5₹4.8 LRejected-Finance VILLAGE VILLAGE TEHSIL BAIJNATH DISTRICT KANGRA | MANDI | HIMACHAL PRADESH | 175013 | ₹4.8 L | L-5 | Rejected-Finance High rate qouted |
| Sl No | Description | Qty | Unit | AMIT CHOUDHARY L5 | Ankit L3 | GALAXY ASSOCIATE L1 | Raj Kumar L2 | SUNNY KAPOOR L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick work,jumper work,blasting in soft and hard rock and chiselling work including saturated soil slushy soil and under floor upto all depth and stacking the excavated soil not more than 3 metre clear from the edge of excavation and then returning the stacked soil in 15 centimetre (Fifteen centimetre) layer when required into plinth sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge. | 20.98 | Cubic metre | 525 ₹11,014.50 | 250 ₹5,245 | 450 ₹9,441 | 290 ₹6,084.20 | 500 ₹10,490 |
| 2.00 | Providing and laying cement concrete 1:3:6 (One cement is to three sand is to six graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-charge. | 3.42 | Cubic metre | 8,000 ₹27,360 | 6,800 ₹23,256 | 7,200 ₹24,624 | 6,750 ₹23,085 | 7,800 ₹26,676 |
| 3.00Providing and laying cement concrete 1:11/2:3(One cement is to One and half sand is to three graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | ||||||||
| 4.00 | a) Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge. | 7.88 | Cubic metre | 9,500 ₹74,860 | 8,200 ₹64,616 | 9,100 ₹71,708 | 8,350 ₹65,798 | 9,400 ₹74,072 |
| 5.00 | b) Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level with in all leads and lifts as per the direction of Engineer-in-charge. | 10.64 | Cubic metre | 9,500 ₹1.0 L | 8,300 ₹88,312 | 9,100 ₹96,824 | 8,450 ₹89,908 | 9,450 ₹1.0 L |
| 6.00Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens ballies,height of propping and centring below supporting floor two ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | ||||||||
| 7.00 | a) Vertical surfaces such as walls (any thickness) partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge. | 95.36 | Square metre | 400 ₹38,144 | 150 ₹14,304 | 280 ₹26,700.80 | 100 ₹9,536 | 305 ₹29,084.80 |
| 8.00 | b) Flat surfaces such as soffits of suspended floors,roofs,landings and the like floors etc.upto 200 milimetre in thickness within all leads and lifts as per the direction of Engineer-in-charge. | 2.7 | Square metre | 30 ₹81 | 150 ₹405 | 10 ₹27 | 120 ₹324 | 15 ₹40.50 |
| 9.00 | Providing in reinforcement cement concrete work smooth finishing of the exposed surface with cement mortar 1:3 (1 cement 3 sand) within all leads and lifts as per the direction of Engineer-in-charge. | 98.06 | Square metre | 12 ₹1,176.72 | 80 ₹7,844.80 | 1 ₹98.06 | 50 ₹4,903 | 5 ₹490.30 |
| 10.00 | Providing and laying mild steel/tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-charge. | 1,509.16 | Killo gramme | 95 ₹1.4 L | 87 ₹1.3 L | 92 ₹1.4 L | 83 ₹1.3 L | 94 ₹1.4 L |
Tender Value
₹4.8 L
EMD Value
₹9,510
Closing Date
2 Jan 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION PALAMPUR
Construction of 2 number desilting tank
2025_HPIPH_124269_1
HP IPH 9303-9353 DATED 23.12.2025
Open Tender
Civil Works
90 days
PALAMPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
EXECUTIVE ENGINEER
₹9,510
8 May 2026
23 Dec 2025
3 Jan 2026
23 Dec 2025
2 Jan 2026
23 Dec 2025
Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick work,jumper work,blasting in soft and hard rock and chiselling work including saturated soil slushy soil and under floor upto all depth and stacking the excavated soil not more than 3 metre clear from the edge of excavation and then returning the stacked soil in 15 centimetre (Fifteen centimetre) layer when required into plinth sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge.
Providing and laying cement concrete 1:3:6 (One cement is to three sand is to six graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-charge.
a) Foundation,footings bases of column and the like mass concrete within all leads and lifts as per the direction of Engineer-in-charge.
b) Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level with in all leads and lifts as per the direction of Engineer-in-charge.
a) Vertical surfaces such as walls (any thickness) partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge.
b) Flat surfaces such as soffits of suspended floors,roofs,landings and the like floors etc.upto 200 milimetre in thickness within all leads and lifts as per the direction of Engineer-in-charge.
Providing in reinforcement cement concrete work smooth finishing of the exposed surface with cement mortar 1:3 (1 cement 3 sand) within all leads and lifts as per the direction of Engineer-in-charge.
Providing and laying mild steel/tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-charge.
Steel work welded in built up sections,trusses and framed work including cutting,hoisting and fixing in position and applying a priming coat of red lead paint in gratings,framed guard bars,ladders,railing,brackets and similar type of work within all leads and lifts as per the direction of Engineer-in-charge.
a) 100 milimetre dia.
a) 100 milimetre dia.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Form6.pdf
Tender Documents • 0.28 MB
Form8.pdf
Tender Documents • 0.99 MB
Termsandconditions.pdf
Tender Documents • 0.08 MB
BOQ_182589.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid