| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹10.0 L+₹16,202.89 (1.64%)Rejected-Finance | L2 | Rejected-Finance . | |
| 3 | L3₹10.1 L+₹21,142.79 (2.14%)Rejected-Finance | L3 | Rejected-Finance . | |
| 4 | Rejected-Technical VILL P O PUINAN DIST HOOGHLY PIN 712305 | PUINAN | HOOGHLY | WEST BENGAL | 712305 | - | Rejected-Technical All Document submitted i.e. credential etc. are of different agency. | |
| 5 | Rejected-Technical | - | Rejected-Technical Insufficient Document |
Tender Value
₹9.9 L
EMD Value
₹19,760
Closing Date
19 Mar 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
76 Dr. Deodar Rahaman Road (3rd floor) Lake Gardens KOLKATA_700033
Emergent restoration of Thakurpukur-Bibirhat-Bakrahat-Raipur Road from 3.50 km to 4.50 km in different stretches under South 24 Parganas Division, PWD in the district of south 24 parganas during the year 2025-2026.
2026_WBPWD_1019045_3
WBPWD/EE/S24PGSD/e-NIT 24/2025-2026
Open Tender
CIVIL WORKS
Percentage
10 days
SOUTH 24 PARGANAS
Please refer Tender documents.
5 documents required · 5 mandatory
₹19,760
Yes
17 Jul 2026
7 Mar 2026
23 Mar 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairing pot-holes and making up small
depressions with ramming or power rolling including
screening, cleaning chips or metals and washing,
drying as necessary and heating the chips or metal
where necessary, cutting pot holes to regular shapes
with vertical edges, cleaning the disintegrated
materials, heating matrix and applying tack coat
(including sides), finishing the top of repaired
surface levelled with adjoining area, including cost
and carriage of stone aggregates and matrix,
excluding cost of applying tack coat. [Tack coat is
to be considered separately] i) With premixed Chips or Bajrees with 54 kg of bitumen per m3 of loose net volume of stone chips using concrete mixer machine. (The payment is to be made on the basis of loose net volume of stone materials consumed in the work) (b) Using Mobile HMP (Light duty) | - | Cu.M | 4,114.56 | - |
| 2 | Water Bound Macadam Sub Base by consolidating
Jhama metal / Laterite chelly or stone metal /
shingles of specific size in hard crust to requisite
thickness (measured after compaction) in layers
including screening of metals etc. as necessary,
hand packing, sweeping, watering and rolling in
stages with power roller to proper line, grade and
camber, lighting, guarding & barricading and
making necessary earthen bundh of one metre
width on each side where necessary to protect
edges and preparing the bed by necessary cutting
or filling and rolling all complete including the cost of
all materials and hire and labour charges of all men
and machineries and compacting to the required
density, as per Clause 404 of Specifications for Road
& Bridge Works of MoRT&H (5th Revision). (iii) For Construction of Sub Base by consolidating
broken shingles (53 mm to 22.4 mm) with Type-
A screening : | - | Cu.M | 2,727.22 | - |
| 3 | Providing, laying and rolling of Open - graded premix
surfacing of 20 mm thickness composed of 13.2 mm
(@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²)
size stone aggregates, including thoroughly cleaning
of the surface, screening, cleaning and pre-heating
stone chips and fully pre-coating the same either
using viscosity grade paving bitumen or cut-back or
emulsion, carrying the mixture by any suitable
arrangements, laying the mixture uniformly over the
surface, including line, grade and level to serve as
wearing course on a previously prepared base,
including mixing in Mobile Hot Mix Plant (Light Duty)
and thoroughly rolling with a smooth wheeled roller
8-10 tonne capacity, finished to required level and
grades including the cost and carriage of stone
chips and matrix, heating the matrix, preheating the
aggregates to required temperature and including
the hire charges of Mobile Hot Mix Plant (Light Duty)
and other machinery, pay of operators, cost of fuel
and lubricants etc. complete to be followed by seal
coat of either Type A or Type B as per Technical
Specification Clause 508 for Rural Roads of MORD. | - | Sq.M | 115.53 | - |
| 4 | Providing and laying Premixed Seal Coat (Type B)
with approved quality sand/grit @ 0.6 m3/ 100 m2
and bitumen binder on thoroughly cleaned black
top surface coated with tack coat, including heating
and mixing cleaned sand/grit (100 % passing through
2.36 mm sieve and retained on 180 micron sieve)
uniformly with bitumen binder, laying and spreading
the mix at an uniform rate using suitable means,
brushing the surface, if necessary, to ensure
uniformity, followed by rolling with power roller
including the cost and carriage of binder and
aggregates, cost of heating the binder and
aggregates and all other incidental charges, cost of
fuel and lubricants, including hire charges of
machineries, tools & plants required for construction
and quality control complete as per Clause 511 of
Specifications for Road & Bridge Works of MoRT&H
(5th Revision).I By Mechanical Means
(i) With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.) | - | Sq.M | 39.86 | - |
| 5 | Providing and applying primer coat with Cationic
Bitumen Emulsion of approved grade conforming to
IS: 8887-1978 and requisite quantity on prepared
surface of granular base including cleaning of road
surface and spraying primer using Mechanical
means including cost and carriage of bitumen
emulsion and all other incidental costs of work
complete as per Clause 502 of Specifications for
Road & Bridge Works of MoRT&H (5th Revision).
(i) For WBM / WMM Surface:
(with primer @ 0.70-1.0 kg/sqm) | - | Sq.M | 28.93 | - |
| 6 | Providing and applying tack coat with Cationic
Bitumen Emulsion of approved grade conforming to
IS: 8887-1978 on the prepared surface cleaned with
Hydraulic broom, moistening the surface including
cost and carriage of emulsion, hire charges of
machinery and labour, cost of fuel and lubricants all
complete as per Clause 503 of Specifications for
Road & Bridge Works of MoRT&H (5th Revision).
(i) On Bituminous Surface
(Using Bitumen Emulsion at the rate of 0.20 to
0.30 kg per sqm.) | - | Sq.M | 10.17 | - |
| 7 | Add GST @18% | 8,28,982 | Not Applicable | 0.18 | ₹1,49,216.76 |
| 8 | Add Labour welfare Cess @1% | 9,78,199 | Not Applicable | 0.01 | ₹9,781.99 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
2911.pdf
Tender Documents • 1.86 MB
BOQ_2504042.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .