Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC VALLIKATTIL HOUSE MANGATTOOR KOLENCHERY | ERNAKULAM | KERALA | 680667 | ₹5.0 L | L1 | Accepted-AOC l1 |
| 2 | L2₹5.1 LRejected-AOC MYALILI PUTHENPURA MAZHUVANNOOR | WAYANAD | KERALA | 670644 | ₹5.1 L | L2 | Rejected-AOC l2 |
| Sl No | Description | Qty | Unit | WILSON V VARKEY L1 | M K CHACKO L2 |
|---|---|---|---|---|---|
| 1.00Rectification | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 240 | sqm | 15.83 ₹3,799.20 | 16.17 ₹3,880.80 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 109.2 | cum | 224.14 ₹24,476.09 | 229.03 ₹25,010.08 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 79.86 | sqm | 335.96 ₹26,829.77 | 343.3 ₹27,415.94 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.52 | cum | 6,901.61 ₹17,392.06 | 7,052.34 ₹17,771.90 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 33.72 | cum | 8,668.62 ₹2.9 L | 8,857.93 ₹3.0 L |
| 1.01 | 5.22.2:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire | 1,323.6 | kilogram | 95.47 ₹1.3 L | 97.56 ₹1.3 L |
| 1.01 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 1.22 | cum | 634.57 ₹776.71 | 648.43 ₹793.68 |
| 1.01 | 60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | 41.6 | metre | 98.38 ₹4,092.61 | 100.53 ₹4,182.05 |
Tender Value
₹5.7 L
EMD Value
₹14,254
Closing Date
9 Oct 2025, 3:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
PVIP SUBDIVISION NO 7 KOLENCHERY
The items of the estimate are Clearing jungle, Earthwork for side lowering,foundation and desilting, Concrete CC 148 for foundation levelling course, Concrete CC 124 for foundation and superstructure of side wall, filling with contractor own ea
2025_Irrig_803468_1
IRR/PII/3107/2025-2026
Open Tender
Civil Works - Canal
180 days
vadavucode
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,260
Yes
₹14,254
Yes
23 Dec 2025
29 Sept 2025
10 Oct 2025
29 Sept 2025
9 Oct 2025
29 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1335714.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid