Loading…
Loading…
Tender Value
₹12.0 L
EMD Value
₹11,992
Closing Date
7 Apr 2026, 6:00 pmClosed
Assistant Manager (South West Zone)
Supplying and Laying DI water pipeline labour work from MP MLA Councellors and other budget in Vejalpur ward South West Zone. (ARC)(RE INVITE)
290670
21/2025-2026
Open
Miscellaneous Works
Ahmedabad
3 documents required · 3 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹11,992
27 Mar 2026
27 Mar 2026
27 Mar 2026
7 Apr 2026
27 Mar 2026
5 Estimated Cost put to Rs.11,99,200.00
6 Tender fees Rs.900/- Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
7 Earnest Money Deposit Rs.11992/- (Demand Draft in favour of Municipal Commissioner,
Ahmedabad /). As per latest AMC finance dept. circular
8 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Assistant Manager(North west zone) , NWZ zonal office, Rajmata
vijyaraje Sindhiya bhavan, Bodakdev, Ahmedabad
9 Security Deposit 5 % of the Tender Amount in form of Bank Guarantee / Demand
Draft / Local MICR Cheque.
10 Mode of sending the Price bid should be submitted by e-tender only and Technical bid
Tender should be submitted physically also in sealed envelope systems By
Documents RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate
( One Original & One Duplicate) duly sign & seal by contractor .
11 Mode of sending the Document shall be submitted in sealed envelope systems By
Tender RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate
Documents ( One Original & One Duplicate) duly sign & seal by contractor .
12 Terms, Condition, & All general condition of contract of Form B1 condition of contract
Specification shall be applicable.Except clause no.2 liquidated damages for delay
shall be overruled by A.M.C.’s M.C. Circular No.9 Dt.18/05/2012
13 Defect &Liability Period Shall be 6 months from the certified date of completion
14 Compansation for Delay As per City Engineer circular no.03 dt. 03.09.2016.for Liquidated
Damages and Milestone recovery.
15 E.P.F. Act. ykdu As Per Account Department Circular No-37 Dt. 09.08.2018
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all
the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Addl City Engineer (SWZ)
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl - W•th vrùbÍtul Ítulj ytuVem
œrûtK vrùb Ítul Ítulj ytuVem,
NuÕce ntuMvexjle lSf, stu^vwh, ybœtJtœ.
œrûtK vrùb Ítul xuLzh ltuxem lk- 21 / 2025-26 btk ytJhe juJtguj ftbtule ÂJd<tu / Nh<tu:-
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk
btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf
mtbuj fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh
lkch, ftblwk ltb <&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkc< yJ~g œNtoJJtlt hnuNu. su ftuLx[tfxh©eytuyu hSMx[uNl heLgw
fhtJuj l ntug <u ftuLx[tfxh©eyu xuLzh ChJt lnek.
4. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu mhltb wMvÐ yûthtubtk jFJw.
5. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
6. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
7. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s
MJefthJtbtk ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu
htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu
R.yub.ze.le hfb btºt rzbtLz z[tVx, vu ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
8. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
9. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu
10. Nh<e xuLzhtu hœ ct<j dKtNu.
11. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble
BþÆ<btk bshu ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ xuLzhhu juJe.
12. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
13. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh
14. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu htufzt, jtufj btRfh auf, rzbtLz z[tVx, vu
ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt
rzbtLz z[tVx, vu ytuzoh fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
15. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne mefft
fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
16. mœh xuLzhle ytRxbtult CtJtu ltKt Ft<t lt mhfgwjh lk.38, <t.21/11/22 <&t mûtb m•ttle b¤uj bkswhe bwsc GST rmJtg
dKºtebtk juJtbt ytJuj <&t «Jo<btl rlgb bwsc GST awfJJt vtºt &Nu su&e <btb cezomu <u bwsc dK<he fhe xuLzhtu ChJtlt
17. mœh xuLzh yk<od<lt ftb mkjøl y.Bgw.ftu.btk vJo<btl <btb rlgbtu/mhfgwjhtu jtdw vzNu <ubs JF<tu JF< <h mw^thtytu vK
jtdw vzNu. sule ltuk^ jR xuLzhtu ChJtlt hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h, ybœtJtœ” lt ltbltu fZtJJtu.
Contractor's Signature Addl. City Engineer
& Stamp (south west zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at different sites
simultaneously. Contractor's having labour force available during festivals shall only apply. Contractor cannot
stop the work due to non availability of labour force.
In case progress is delayed, contractor shall be penalized 0.10% of Tender amount per day for work
done after time limit, maximum up to 10% for remaining value of work.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes.
9. If the work is not completed within time limit the penalty will be recovered from immediate bills of Contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then contractor shall not
claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved" by the
Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to mean as a
reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of specific mention
of a particular point or aspect, the provisions on these particular points, or aspects in the relevant Indian
Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to the following
(i) Length, width and depth (height)------- 0.01 Meter. (RMT)
(ii) Areas -----0.01 Sq. Mt. (SMT)
(iii) Cubic Contents ------0.01 Cu.Mt. (CMT)
18. The distance, which constitutes lead, shall be determined along the shortest practical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be taken as
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it, specifications
shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of work is in the
form of a designation containing the number of the specification of the material and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the contractor
from the responsibility of replacing defective material brought on site or materials used in the work found
defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials shall be stone
at site of work in a systematic manner. Materials shall be stored in such a manner as to prevent damage,
deterioration or intrusion of foreign matter and to-ensure the preservation of their quality and fitness for the
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the site of work
within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient numbers and in good
working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the particular item.
27. All tools, templates, machinery and equipment for correct execution of the work as well as for checking lines,
levels, alignment of the works during execution shall be kept in sufficient numbers and in good working
condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or over loading of
the various components of the structure during execution or after completion of the structure.
29. All necessary safety measures and precaution (including those laid down in the various relevant Indian
Standards) shall be taken to ensure the safety of men, materials and machinery on the works as also of the
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one percent towards
testing charges is separately made.
31. The tenderer is required to check the web site for Addendum if any, before 48 hours of tender submission
date and time. The tenderer who quotes the tender without attaching the addendum will be rejected.
32. As per City Engineer’s circular no.-6/2011-12 Dt.24.6.2011 all terms & conditions will be applied.
33. Contractor has to follow Planning Department Circular No 10 Dt. 07/09/2018 strictly.
34. As per AMC’s Finance department circular no.38/ Dt.21/11/022 and approval of competent authority, rate of
all the items are taken without GST and prevailing GST will be payable.
35. All the relevant prevailing AMC circulars/ its time to time revisions are applicable for this work and all the
bidders are bound to follow the same, so the bidder must check before applying for the tender.
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar days (120) from
opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall furnish to the
Corporation Security Deposit of 5% (Five percent) of the contract price Cheque or Bank Guarantee, pay order,
or demand draft of Nationalized Banks and Schedule Banks only.
Contractor's Signature Addl. City Engineer
& Stamp (south west zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 Month after the order to start the works. Progress of work should be in
proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The contractor shall
arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He shall be responsible for
any damage to public, If any incident happen, during the execution of work. In case of dispute for unseen or
overlooked items the decision of the Dy.City Engineer shall be final. The contractor shall have to give site clean of
all rubbish during the work and at the time of completion of work and hand over the site with final finishing of the
work as directed. All the rejected materials shall be removed from site within 24 hours by contractor at this risk
and cost. Debris shall have to cart daily from site.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he shall
be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not available in
SOR than based on current market rates. In case of extra item decision of Add. City Engg. shall remain final
regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work the
contractor shall carry out the same at his quoted rates without charges any extra and the contractor will have to
carry out the works and he will be paid at the rate quoted by him. No claim for extra rate for subsequent changes
in site and design is entertained.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for this
work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during the period. If
any tenderer withdraw or makes any modifications or addition in the terms and conditions of his tender not
acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to any right or remedy
be at liberty to forfeit in full the said earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the penalty of
Rs.- ( As per Form - B1) per day of delay shall be recovered from the immediate bills payable to the contractor.
Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand draft
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1 can
be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets of Building
Works & and Road Works Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
Contractor's Signature Addl. City Engineer
& Stamp (south west zone)
As per Government of Gujarat G.R.No.- EMD/10/2021/7729/DMO Dt.28/06/2021 & Circular of Finance
Department, AMC No.41, Date: 08/02/2022, approved Banks are...
A. Guarantees issued by following banks will be accepted as SD/EMD on permanent
All nationalized Banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the period up to March-
2023. The validity cut-off date in the GR is with respect to the date of issue of Bank Guarantee irrespective
of the date of termination of Bank Guarantee.
1 Commercial Banks :-
1. A U Small Finance Bank
3. City Union Bank
4. DBS Bank India Limited
6. Equitas Small Finance Bank
7. Federal Bank
10. IndusInd Bank
11. Kotak Mahindra Bank
13. Standard Chartered Bank
14. Tamilnadu Mercantile Bank
15. Ujjivan Small Finance Bank
2 Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Kalupur Commerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. Saurashtra Gramin Bank
7. The Gujarat State Co-Operative Bank
8. The Mehsana Urban Co-operative Bank Limited
9. The Surat District Co-operative Bank
10. The Surat Peoples Co-operative Bank
bu.Bgwrl.frb§h©e, ybœtJtœ Bgwrl. ftuvtuhuNllt mhfgwjh lk.-81, <t.26.02.2015 bwsc <btb «fthle
fLmx[fNlle yufxeJexebtk bwÏg ftuLx[tfxh,mc ftuLx[tfxhlt su bswhtu ftbdehe fh<t ntug <u <btb bswhtulwk dwsht<
rcÕzekd yuLz y^h fLmx[fNl Jfombtk hSMx[uNl fhtJJwk VhSgt< Au.
Tender Fee -Rs.900.00 Date of Online submission: 07/04/2026 Time: 18:00 PM
Earnest Money-Rs.11992 Date of Doccuments submission: 08/04/2026 Time: 16:00 PM.
Contractor’s Name & Address Date of Opening: 08/04/2026 Time: 17:00 PM.
AHMEDABAD MUNICIPAL CORPORATION
Engineering Department -South West Zone
Name of Work :- Supplying and Laying D.I. water pipeline labour work under from M.P.,
MLA, Councellor's and other budget in vejalpur ward, south West Zone. (ARC)
Qty. Item Name Rate Unit Amt.
Providing FoR Cost of Materials & supplying at
Providing TMT Bar FE 500D reinforcement for R.C.C.
work including bending, binding and placing in
A 10.00 Position complete upto floor two level (R & B 75.46 K.G
Building SOR 21-22 Item no. 5.4.11 I.code 05014C)
Lead (AMC central Stroe i.code 18910001 rate as
Jute (Spun Yarn) (AMC central Store i.code
Nut Bolt (AMC central Store i.code 10550138 rate
F 5.00 MS Plate (as per building SOR) 63.35 K.G
G 5.00 MS pipe /piece 75.00 K.G
H 5.00 MS Ring flange 125.00 K.G
I 5.00 MS Blank flange 98.21 K.G
J 5.00 Rubber Gasket 71.43 K.G
2 Providing & supplying For Welding Joints
Hiring and operating the 20 KV 3 Phase Electric
Generator for operating desilting machinery and
A 3.00 lighting and other requirements with Arranging 2500.00 SHIFT
diesel to run the D.G. Set Do As Directed. 8 Hrs
B 1.00 Rent of Welding machine per shift 893.00 SHIFT
C 1.00 Rent for Grinder machine per shift 304.00 SHIFT
D 1.00 Gas Cutting set per shift 513.00 SHIFT
E 1.00 LPG bottle 1205.00 NO
F 1.00 Oxygen bottle 246.00 NO
G 1.00 Rent of Tools & Other Charges 446.00 SHIFT
H 1.00 Rent of Chain pulley block & Tripod 446.00 SHIFT
3 1.00 Providing For Masonry & RCC Work
C 1.00 M-Seal 100 gm pack 26.79 NO
D 3.00 Cement bag (As per building SOR I.code M143) 323.00 BAG
E 1.00 Grit- Aggregates (As per building SOR I.code M176) 330.00 CMT
Kapachi Aggregates (As per building SOR I.code
G 4.00 Sand (As per building SOR I.code M209) 179.00 CMT
H Brick (As per building SOR I.code M166)
Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced
4 3.00 concrete work in (A)Foundations, footings, Base of 3874.20 Cmt
columns and Mass concrete (Building SOR 21-22
I.No.5.8.2 I.Code 05024AA)
Labour charges for repairing of lekage CI/DI pipe
line of following diameter at different places
incluyding necessary excavation manually or by
machinery, removing of mud, dewatering,
cleaning of pipe, cutting of pipe, Jointing &
5 repairing using CID joints including CID joints,
rubber rings, nut bolts, hiring excavator, Hydra/
Crane, dewatering machine, fuel, operator etc
complete ( including cost of jointing material
but excluding cost of pipe) (GWSSB SOR 22-23
SECTION 1 G I.NO.3)
Labour charges for repairing of lekage CI/Di
pipe line for following dia different places
including necessary excavation manually or by
machinery removing mud dewatering cleaning of
pipe and leakafe portion and repairing by inserting
6 lead wool jute tools required for inserting lead
wool hiring charges of excavators Hydra/crane
j.c.b dewatering set fuel operator cost of lead wool
etc complete(including all material but excluding
cost of pipel) (GWSSB SOR 22-23 SECTION 1 G I.NO
Providing, supplying and fixing check nut for sluice
7 valve. C.I./M.S./G.M. or Brass. Instruction of engg.
Labour charges for repiaing of Sluice valve /
Reflux valve inlcuding materials, labours and
8 testing etc. Complete. (i) Replacing of S.S.
Spindle only (GWSSB SOR 22-23 I.no.12.A.3)
Providing and fixing to wall, ceiling and floor
galvanised Mild steel tubes (Medium grade) of the
9 following nominal bore, tube fitting and clamps
including making good the wall ceiling and floor.
(Building SOR 21-22 I.no. 23.2)
a 20.00 40 mm dia (I.code no. 23001EA) 436.80 RMT
b 18.00 25 mm dia (I.code no.23001CA) 283.50 RMT
c 15.00 20 mm dia (I.code no. 23001BA) 205.80 RMT
d 15.00 15 mm dia (I.code 23001AA) 162.75 RMT
e 15.00 50 mm dia (I.code no. 23001FA) 569.10 RMT
Providing, laying and jointing in true line and level
U.P.V.C pipe (SCH - 40) of following dia. including
fittings of standard make as approved by Engineer
- in - charge. Pipe shall be fixed on the wall with
the help of clamp at every shall be concealed
as directed including necessary Tee ,bend, any joint
& any fittings etc. including testing of pipe and
joints and fixing the same with adhesive solvent,
including cost of all materials (Building SOR 21-
A 20.00 15 mm (I.code no. 23061) 84.87 RMT
B 20.00 25 mm (I.code no. 23062) 107.29 RMT
C 20.00 32 mm (I.code no.23063) 139.20 RMT
D 50.00 40 mm (I.code no. 23064) 173.03 RMT
E 50.00 50 mm (I.code no. 23065) 228.61 RMT
F 80.00 110mm (I.code no. 23067) 551.25 RMT
Extra rate over item of excavation of earth for
excavation of asphalt pavement of thickness
upto 0.20 meter including demolishing the
11 asphalt carpet, metal, soiling etc. comp. with
stacking the material as directed. (As per Road ARC
a 500.00 up to 0.20 meter thickness (By Manual) 71.10 SMT
0.20 to 0.30 meter (By any type of Breaker
Machine or R.C.C.Cutter machine including
b 400.00 cost of operator, fuel & transportation etc 177.76 SMT
0.30 meter & above (By any type of Breaker
c 150.00 Machine or R.C.C.Cutter machine including cost of 311.08 SMT
operator, fuel & transportation etc complete.
Providing and Making hole for House connection on
C.I./D.I. or M.S. with labour cost. Instruction of
12 engg. In charge (As per previous tender Rates)
F 5.00 2.0" dia on CI/DI Pipe up to300mm dia. 2679.00 NO
Transporting from AMC store and laying spigot and
socket New DI pipe line DI-k-9 pipes of various
classes with CI/DI/MS specials of following
diameters. Rate includes excavation up to minimum
1.0 mt. depth from top of pipe / as per requirement
in any soil, refilling after laying pipe, covering
13 and temptation of carting surplus earth up to
30 mt. lead and watering and compaction.
Clearing the site. All Joints shall be made tight
& leak free etc. comp. (As per previous tender
Removing & relaying of existing CI/DI pipe line
& Specials, Cleaning of pipe & Specials from
Inside, including excavation, refilling etc. comp. in
14 line & level with any type of joints as per
instruction of engg. in charge (As per previous
Labours charges for collecting specials from
Municipals store loading , transportation,
unloading to the site, laying and fixing CI
specials inclusive of all jointing materials like
15 986.5 lead, spun etc.and labour, exacavation re-filling 21.00 K.G
and nece. dewatering as per instrucation of
engg. incharge (As per previous tender
Labour charges for installing and jointing Sluice
Valves including loading, transporting from
owner's store, lowering in location to the required
with excavation refilling alignment by crane/
tripod and chain block including cost of total
nos. of nuts, bolts, Necessary gaskets and
excluding fixing of tail pieces with lead & jute etc
complete as directed by Engg. in charge. (As
per previous tender Rates)
Cutting of existing pipelines of following
diameters including carting of nece. specials from
AMC store to site and from site to AMC store
(recovered materials) nace. labours for
excavation, jodan & backfilling fitter, supervisor,
etc. complete. Rate also includes electric cutter,
17 dewatering pump fuel and transportation of
machineries, chain pulley block if requires
working at an instructed specific time of day or
night etc. complete. (As per previous tender
Supplying, labour for excavation of all types of soil
at any depth including excavation of asphalt
pavement of any thickness, demolition of brick
18 work in CM of any proportion including stacking
of serviceable materials and disposal of
unserviceable material etc. comp. as directed.
Mazdoor at day /night (As per min.wages circular of
Fitter at day / Night (As per min.wages circular of
C 40.00 Makadam/ supervision/Fitter at day / Night 379.46 NO
Dewatering by pumping set of required
capacity including temporary platform carting
pumping at site and fixing the same in position
including all accessories, and fuel and labour
etc. Complete (A) Pump set of Capacity
(GWSSB SOR 22-23 Section 2E-miscellaneous
Providing & Supplying JCB Machine on rental
basis in case of emergency situation and break
down type work & also during unavoidable
condition as per instruction of Engg. In Charge, rate
20 20.00 includes all nece. Shifting, fuel and operating 600.00 Hour
charges and stacking of useful & non-useful
materials separately up to store. (As per previous
Supplying Pneumatic Breaker Machine for RCC Slab
or Asphalt Demolishing Work on site by using
21 40.00 Operator, fuel, power Supply etc. Complete as 600.00 Hour
Directed. (As per previous tender Rates)
Excavation for trial pit for location of existing
line including excavation of any depth including
22 120.00 refilling, watering etc. Comp (As per previous 290.00 NO
Labour charges for doing washout of water pipe
line at end including necessary excavation of pit,
allowing the water to flow for 15 minutes twice or
thrice as per site condition during supply hour,
23 55.00 dewatering the pit and plugging with existing 670.00 NO
wooden butch and refilling the pit .etc. comp .as
per instruction (As per previous tender Rates)
P/S OF good quality of rubber rings for following dia
24 meter. (As per previous tender Rates)
Supplying wooden taper butches from jungle wood
25 (Like limda, ambo) Etc. comp. (As per previous
A 20.00 15 Mm dia. to 20 MM dia. 13.00 NO
B 15.00 25 Mm dia. to 37 MM dia. 18.00 NO
D 15.00 80 mm dia to 100 mm dia line 313.00 NO
Labour charges for repairing of sluice valve
/ reflux valve including materials, labours and
26 testing etc.,complete (B)Replacing of Glan
packing only (GWSSB SOR-22-23)
Providing and laying (to level or slopes) and jointing
with stiff mixture of Cement Mortar in proportion
27 1:1 Salt glazed stoneware pipes including testing of
pipes and joints complete.(R &B building SOR -21-
22 Item no. 24.1)
A 5.00 100 mm (I.code 24001AA) 140.70 RMT
B 2.00 150 mm (I.Code 24001BA) 192.15 RMT
Fixing of valve Road box incl .locating valve, nece.
excavation, tem also inclues cartring form AMC
28 1.00 store to site. Etc.Comp. as directed (As per previous 446.00 NO
ARC tender rates)
Providing, laying, spreading and compacting
graded stone aggregate to wet mix
macadam specification including premixing the
Material with water at OMC in mechanical mix
plant carriage of mixed Material by tipper to
29 site, laying in uniform layers in sub- base / base
course on well prepared surface and compacting
with vibratory roller to achieve the desired
density as per Codal Provision. (RA Approved
St.Com.Res No.189, Dt.19/05/2022)
A 10.00 PRODUCTION & SUPPLY OF WMM 1708.13 CMT
B 10.00 LAYING OF WMM 31.25 CMT
Hiring of Tractor with trolley considering 8 Hrs. As
30 55.00 working Day hours inclu. Driver (GWSSB SOR 2104.09 DAY
-22-23 Section 2E-Miscellenous Item no. 7)
Barricading the entire break down or excavated
area on rental basis using wooden ballies / M.S.
angles at max. 2.00 meter centre to centre, C.G.I.
Sheet, reflective paint / Board outside to avoid
accident & for smooth traffic diversion &
movement including cautionary board etc. Item
31 20.00 also includes for making temporary sufficient nos 80.00 RMT
of lighting arrangement throughout the work with
necessary required arrangement. ..The same shall
be removed after completion of work. (Only for
break down work from start to complete) (As per
previous ARC tender rates)
Reinstatement of Asphalt road/any kind of
32 200.00 paving/flooring using the same material. (As per 103.57 Smt
previous ARC tender rates)
Dismantling the following including loading,
unloading and disposal of unserviceable
material for all lead or as directed by Engineer-
33 In-Charge and stacking the serviceable
material and backfilling the resulting trenches
and pits complete.
Dismantling tiled or stone floors laid in mortar
including stacking of serviceable material and
b 200.00 disposal of uservicalble material with all lead and 27.44 Smt
(in words also)
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (south west Zone)
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION, (Hereinafter called “the Employer”) invites sealed
Tender document from reputed and qualified bidders for the construction of Works detailed in the
Sr. Name of Works Approximate Bid Security Completion
No. value of works (Rs.) Period
1 Supplying and Laying D.I. water Rs. 1199200.00 Rs 11992.00 12 Months
pipeline labour work from M.P., MLA,
Councellor's and other budget in
Vejalpur ward, South West Zone.
(ARC)(RE-INVITE)
2. Tender (a complete set of bidding document) fee shall be Rs. 900/- in the form of Demand Draft /
Pay Order from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER, Ahmedabad,
payable at Ahmedabad, which shall be non refundable. The fees shall be paid at the time of
submitting the tender.
3. Interested bidders shall download the tender documents from website http://amc.nprocure.com
and http://nprocure.com. up to Dt. 07/04/2026 at 18:00 hrs tender fee as mentioned in clause
above shall be paid by the bidder at the time of bid submission.
4. All bids must be accompanied by Bid Security of the amount specified for the Works in the above
Table payable at Ahmedabad and drawn in favor of AHMEDABAD MUNICIPAL CORPORATION,
Ahmedabad. Bid Security will have to be in any one of the forms as specified in Clause of ITB
(Instructions to Bidders).
5. All Bids must be delivered to Assistant Manager "South West Zone, Zonal Office", Nr. selbi hospital,
jodhpur Ahmedabad. Not later than 16.00 hrs on Dt.08/04/2026.
Seal and Signature of the Bidder Addl. City Engineer
(south West Zone)
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
SOUTH WEST ZONE
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no.
4 Permanent account no. (PAN
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's
signature and stamp
AHMEDABAD MUNICIPAL CORPORATION
Section I – INSTRUCTIONS TO BIDDERS (ITB)
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document for the
construction of works (as defined in these documents, hereinafter referred to as "the Works")
Detailed in the table given in the ITB.
1.2 The Works consist of:
Name of Work :- Supplying and Laying D.I. And UPVC water pipeline labour work under 70:20:10
scheme from M.P., MLA, Councellor and other budget in Vejalpur ward, South West Zone. (ARC)
1.3 The works under this Contract shall be carried out in accordance with the bidding documents constituting
the contract and shall consist of various salient items as generally described below:
1.3.1 Road Works
A) Site clearance, removal of tree stumps and dismantling of obstructions etc.before commencement of the
B) True and proper setting out and layout of the Works, setting of bench marks, provisions of all
necessary labor with instruments and appliances;
C) Widening and strengthening/reconstruction of the existing carriageway including raising;
D) Any other item of work as may be required to be carried out for completing the road works in all
respects in accordance with the provisions of the Contract.
2. Eligible Bidders
2.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD or AMC or equivalent. If contractor is
not registered with AMC in the relevant class, on award of contract he shall be required to register himself with
AMC within 3 month's time Bidders shall provide such evidence of their continued eligibility satisfactory to the
Employer, as the Employer shall reasonably request.
3. Eligible Material, Equipment and Services
3.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be required to
provide evidence of the origin of materials, equipment, and services to the satisfaction of the Employer.
4. Qualification of the Bidder
4.1 To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the bidder.
General information
All individual firms must complete the information in this form. Nationality information shall be provided for
all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone / Mobile no:
5 E-mail addresses:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
additional information regarding litigation, debarment, arbitration, etc.
4.2 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of the
following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and included in
b) Record of poor performance such as abandoning the work, rescinding of contract for which the
reasons are attributable to the non-performance of the contractor, consistent history of litigation awarded
against the applicant or financial failure due to bankruptcy.
c) Has been identified by the AMC as poor performer in implementation of ongoing AMC works e.g.
Works completed after notices issued by AMC or poor quality of work or completed after time limit or
not responsive to Engg.incharge instruction.
d) In case of one contractor remains lowest in most of the such New west Zone grouting work
tenders, then in such case, AMC can award such tender to other contractors.
5 Debarment/Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by the
6. Cost of Bidding
6.1 The bidder shall bear all costs associated with the preparation and submission of his bid and he
Employer will in no case be responsible or liable for those costs.
7.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain for
itself on its own responsibility all information that may be necessary for preparing the bid and entering
into a contract for construction of the Works. The costs of visiting the Site shall be at the bidder's own
7.2 The bidder and any of its personnel or agents will be granted permission by the Employer to enter its
premises and lands for the purpose of such inspection, but only upon the express condition that the
bidder, its personnel and agents, will release and indemnify the Employer and its personnel and agents
from and against all liability in respect thereof and will be responsible for death or personal injury, loss
of or damage to property and any other loss, damage, costs and expenses incurred as a result of the
B. Preparation of Bids
8. Language of Bid
8.1 The bid, and all correspondence and documents related to the bid exchanged between the bidder and the
Employer shall be written in the English language. Supporting documents and printed literature
furnished by the bidder may be in another language provided they are accompanied by an accurate
translation of the relevant passages in the English language, in which case, for purposes of interpretation
of the bid, the English translation shall prevail.
9 Documents comprising the Bid
The bids shall be submitted in hard copy and two copies, one marked as “original” and other marked as
“Duplicate”, both of which comprise the following documents:-
Tender Document:
i) Bid Security for an amount as specified in the Invitation for Bids (IFB).
ii) Power of Attorney
iii) Information as specified.
iv) Any other material / information required to be submitted in accordance with these Instructions to
The Tender Document shall be hard bound. Bid security shall be furnished in “Original” set of
In case of any ambiguity the “Original” set of document shall prevail.
The bidder shall prepare and submit two copies of the bid in original and duplicate.
10.1 Unless stated otherwise in the bidding documents, the Contract shall be for the whole Works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities submitted
10.2 The bidder shall fill in percentage rate above or below and total amount (both in figures and words) for
10.2 The bidder shall fill in percentage rate above or below and total amount (both in figures and words) for
overall items of the Works provided in the Bill of Quantities along with total bid price derived after
application of percentage above or below (both in figures and words). Items (for which rate has been
provided) against which no quantity is entered will be paid for by the Employer on actual measurement
onsite when executed.
Any corrections should be initialed.
All pages of the Bill of Quantities shall be initialed and stamped.
11. Bid Validity
11.1 Bids shall remain valid for a period of 120 days (one hundred twenty days) after the deadline date for
bid submission specified in Clause. The Employer as non-responsive shall reject a bid valid for a shorter
11.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer may
request the bidders to extend the period of validity for a specified additional period. The request and the
responses there to shall be made in writing or by fax. A bidder may refuse the request without forfeiting
his bid security. A bidder agreeing to the request will not be required or permitted to modify his bid but
will be required to extend the validity of his Bid Security for the period of the extension, and in
compliance with Clause 14 in all respects.
12. Bid Security
12.1 The bidder shall furnish as part of its Bid, a Bid Security in the amount in the Invitation for Bid (IFB)
for particular work(s). The Bid Security shall be drawn in favor of MUNICIPAL COMMISSIONER,
Ahmedabad, and may be in one of the following forms:
a) Deposit-at-call Receipt from any Nationalized / Scheduled Bank approved by the Reserve Bank of
b) Bank Guarantee from any Nationalized or RBI approved foreign bank having net worth of more than
Rs.500 crore of Indian operation and acceptable to Employer.
The format of Bank Guarantee shall be in accordance with the AMC requirement.
12.2 The Bid Security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be returned as
promptly as possible.
12.3 The Bid Security of the successful bidder, along with second and third lowest tenders, will be
returned when the bidder has furnished the required performance security and signed the agreement.
12.4 The Bid Security may be forfeited
a) If the bidder withdraws his bid during the period of bid validity;
b) If the bidder does not accept the correction of his bid price.
c) In the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security ii) sign the Agreement.
13. Format and Signing of Bid
13.1 The bidder shall prepare two copies of the documents comprising the bid as described in Instructions to
13.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons duly
authorized to sign on behalf of the bidder.
13.3 The bid shall contain no alterations, omissions or additions, except those to comply with instructions
issued by the Employer, or as necessary to correct errors made by the bidder, in which case the person
or persons signing the bid shall initial all such corrections.
C. Submission of Bids
14.1 The inner and outer envelopes shall
a) Be addressed to the Employer at the following address:
Assistant Manager(New West zone) , "New West Zone Office", Old Memnagar Nagar Palika
Building, Near Manav Mandir, Memnagar, Ahmedabad - 380
b) Bear the following identification:
(c) Indicate the name and address of the bidder.
TENDER FOR “Labour charges for hot mix patchwork in gamtal area road and other different
place's in Vejalpur Ward, in new west zone.
14.2 If the envelope is not sealed and marked as above, the Employer will assume no responsibility for the
misplacement or premature opening of the bid.
15. Deadline for Submission of Bids
15.1 Bids must be received by the Employer at the address specified above not later than the time and date
15.2 The Employer may, at his discretion, extend the deadline for submission of bids by issuing an
amendment, in which case all rights and obligations of the Employer and the bidders previously subject
to the original deadline will thereafter be subject to the deadline as extended.
Any bid received by the Employer after the deadline for submission of bids shall not be opened.
17. Modification and Withdrawal of Bids
17.1 The bidder may modify or withdraw his bid after bid submission, provided that written notice of the
modification to the Employer prior to the deadline for submission of bids receives withdrawal. Any
MODIFICATIONS in respect of tender document shall be submitted in separate sealed envelope duly
17.2 The bidder's modification or withdrawal notice shall be prepared, sealed, marked and delivered with the
outer and inner envelopes additionally marked "MODIFICATIONS" or "WITHDRAWAL" as
17.3 No bid shall be allowed to modify by the bidder after the deadline for submission of bids.
17.4 Withdrawal of a bid during the interval between the deadline for submission of bids and the expiration
of the period of bid validity may result in the forfeiture of the Bid deposit.
D. Bid Opening and Evaluation
18 Opening of Tender (Bid)
18.1 The Employer will open the outer envelope of all the bids received for the package (except those
received late) containing the sealed Tender volume and announce the names of (i) bidders, (ii) bidders
who have submitted modification of Tender bids, and (iii) bidders who have given notice for withdrawal
of their bids in the presence of bidders or their representatives who choose to attend on the date and time
mentioned in the ITB. In the event of specified date of bid opening being declared as a holiday for the
Employer, the Tender will be opened at the appointed time and location on the next working day.
18.2 Bids for which acceptable notice of withdrawal has been submitted pursuant to Clause mentioned
previously shall not be opened.
18.3 Bidders detail and Tender fee, E.M.D. shall be opened first. The Employer at the opening will announce
bidder’s names, ‘Modification of Tender’, the presence/or absence of Bid Security, the amount and
validity of Bid Security furnished with each bid, is valid registration and such other details, as the
Employer may consider appropriate.
18.4 The bidders or their representatives who are present shall sign attendance sheet evidencing their
18.5 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening, including the
information disclosed to those present in accordance with Clause mentioned previously.
19. Examination of Tender and Determination of Responsiveness of Tender
19.1 If the Bid Security furnished does not conform to the amount and validity period as specified in the
Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the Employer as
non-responsive.
19.2 Subject to confirmation of the Bid Security by the issuing bank, the Tender volume accompanied with
valid Bid Security will be taken up for further evaluation. In case, the Bank does not confirm the Bid
Security, the bid shall be rejected as non-responsive and no further evaluation carried out.
19.3 The tender volume will further be examined to determine whether the bid has been properly signed,
meets the eligibility and qualification criteria, has the required available bid capacity, is accompanied by
the requisite certificates, undertaking and other relevant information specified in the bid documents and
is substantially responsive to the requirement of the bidding documents and provides any clarification
for ascertaining the correctness of the information/details that the Employer may require.
19.4 If the Tender volume is not substantially responsive, it will be rejected by the Employer and will not
subsequently be made responsive by correction or modification or withdrawal of the non-conforming
deviation or reservation.
20. Opening of Tender
20.1 The Employer will open the Tender volume of those bidders whose document has been determined to be
substantially responsive in accordance and who have the required available bid capacity, in presence of
the bidders or their representatives who choose to attend on the date intimated to such bidders. In the
event of specified date of Tender volume opening being declared a holiday for Employer, the ‘Tender
volume’ shall be opened at the appointed time and location on the next working day.
20.2 The names of the bidders whose Tender volume is found to be substantially responsive, the bid prices,
the total amount of each bid, any discount, ‘modifications of B.O.Q and such other details, as the
the total amount of each bid, any discount, ‘modifications of B.O.Q and such other details, as the
Employer may consider appropriate will be announced by the Employer at the opening of the Tender
volume. Any bid price, which is not read out and recorded at the bid opening, will not be taken into
account in Bid Evaluation.
20.3 The bidders or their representatives who are present shall sign attendance sheet evidencing their
20.4 The Employer shall prepare besides the record of bid opening, minutes of the Tender volume opening
including the information disclosed.
21. Examination of Bids and Determination of Responsiveness of Bid
21.1 The Employer will determine responsiveness of each Tender volume with respect to filled percentage
above or below of total amount of Priced Bill of Quantities, Technical Specifications, Drawings and
above or below of total amount of Priced Bill of Quantities, Technical Specifications, Drawings and
other relevant requirement of bidding documents.
21.2 A substantially responsive Tender volume is one which conforms to all the terms, conditions and
specifications of the bidding documents, without material deviation or reservation. A material deviation
or reservation is one (i) which affects in any substantial way the scope, quality or performance of the
Works; (ii) which limits in any substantial way, inconsistent with the bidding documents, the Employer's
rights or the bidder's obligations under the Contract; or (iii) whose rectification would affect unfairly the
competitive position of other bidders presenting substantially responsive Tender volume.
21.3 If the Tender volume is not substantially responsive, it will be rejected by the Employer and may not
subsequently be made responsive by correction or withdrawal of the non-conforming deviation or
22. Correction of Errors
22.1 Tender volume determined to be substantially responsive will be checked by the Employer for any
arithmetic errors. Arithmetic errors will be rectified on the following basis:-
i) Where there is a discrepancy between the figures and words, for % and amount, the figure in words
will govern and
ii) Where there is discrepancy in total amount arrived by addition of percentage (above or below), the
ii) Where there is discrepancy in total amount arrived by addition of percentage (above or below), the
amount arrived by addition percentage (above or below) as written in word shall govern.
22.2 The amount stated in the Form of Bid will be adjusted by the Employer in accordance with the above
procedure for the correction of errors and shall be considered as binding upon the bidder. If the bidder
does not accept the corrected amount of bid, his bid will be rejected, and his Bid Security may be
23. Evaluation and Comparison of Tender volume
23.1 The Employer will evaluate and compare only those Tender volumes which are determined to be
substantially responsive in accordance with Clause 23 and qualified for award of Contract.
23.2 In evaluating the Tender volume, the Employer will determine for each Tender volume the valuated Bid
Price by adjusting the Bid Price as follows:-
a) Making any correction for errors;
b) Making appropriate adjustments to reflect any price modifications offered.
23.3 If the Bid of the successful Bidder is seriously unbalanced or extremely higher / lower in relation to the
Employer’s estimate of the cost of the items of the Works to be performed under the Contract, the
Employer may require the bidder to produce detailed price rate analysis for any or all items of the Bill of
Quantities, to demonstrate the internal consistency of those prices with the construction methods and
schedule proposed. In case, AMC finds rates extremely below estimated SOR rate or Market Rate than
Tender shall be rejected and second lowest tenderer may be awarded the work.
23.4 A bid, which is unrealistically lower then estimate and which the bidder, could not substantiate
satisfactorily, may be rejected as non-responsive.
24 Clarification of Bids
24.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his discretion,
ask any bidder for authentication the correctness of the information/details furnished by him in his bid.
Such request by the AMC and the response by bidder shall be in writing or by cable/fax, but no change
in the price or substance of the bid shall be sought, offered or permitted except as required to confirm
the correction of arithmetical errors discovered by the Employer in the evaluation of the bids.
24.2 No bidders shall contact the AMC staff on any matter relating to his bid from the time of bid opening to
the time contract is awarded.
24.3 Any effort by the bidder to influence the the AMC staff in the bid evaluation, bid comparison or contract
award decisions may result in the rejection of his bid.
25.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other persons not
officially concerned with such process until the award to the successful bidder has been announced. Any
effort by a bidder to influence the Employer's processing of bids or award decisions may result in the
rejection of his bid.
F. Award of Contract
26.1 The Employer will award the Contract to the bidder whose bid has been determined to be substantially
responsive to the bidding documents and who has offered the lowest Evaluated Bid Price provided that
such bidder has been determined to be (i) eligible in accordance with the provisions of previous Clauses
and (ii) qualified in accordance with the provisions of previous Clauses.
27. Employer's Right to accept any Bid and Reject any or all Bids
27.1 The Employer reserves the right to accept or reject any bid and to annul the bidding process and reject
all bids, at any time prior to award of Contract, without thereby incurring any liability to the affected
bidder or bidders or any obligation to inform the affected bidder or bidders of the grounds for the
Employer's action.
28. Notification of Award
28.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will notify the
successful bidder by cable/fax and confirmed by registered letter that his bid has been accepted. This
letter (hereinafter and in the Conditions of Contract called "the Letter of Acceptance") shall name the
sum which the AMC will pay the Contractor in consideration of the execution, completion and
maintenance of the Works by the Contractor as prescribed by the Contract (hereinafter and in the
Conditions of Contract termed "the Contract Price").
28.2 The notification of award will constitute the formation of the Contract.
29. Signing of Agreement
29.1 At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a date
determined by the Employer for signing the Form of Agreement.
30. Performance Security
30.1 Within 10 (Ten) days of the date of receipt of the Letter of Acceptance, the successful bidder shall
deliver to the Employer, a Initial Performance Security in the form of a Bank Guarantee for an amount
equivalent to 5% (five percent) of the Contract Price plus additional security for unbalanced bids in
accordance with relevant Conditions of Contract.
30.2 The Performance Security to be provided by the successful bidder in the form of a bank guarantee as per
format shall be issued from any Nationalized / Scheduled bank.
31. Corrupt or Fraudulent Practices
31.1 The Employer will reject a proposal for award if he determines that the Bidder recommended for award
has engaged in corrupt or fraudulent practices in competing for the contract in question. The Employer
will declare the firm ineligible, either indefinitely or for a stated period of time, to be awarded a contract
by AHMEDABAD MUNICIPAL CORPORATION if it at any time determines that the firm has
engaged in corrupt or fraudulent practices in competing for the contract, or during execution.
i) “corrupt practice” means behavior on the part of officials in the public or private sectors by which
they improperly and unlawfully enrich themselves and/or those close to them, or induce others to do so,
by misusing the position in which they are placed, and it includes the offering, giving, receiving, or
soliciting of anything of value to influence the action of any such official in the procurement process or
in contract execution; and
ii) “fraudulent practice” means a misrepresentation of facts in order to influence a procurement process
or the execution of a contract to the detriment of the Borrower, and includes collusive practice among
bidders (prior to or after bid submission) designed to establish bid prices at artificial non-competitive
levels and to deprive the Borrower of the benefits of free and open competition.
Seal and Signature of the Bidder Addl. City Engineer
(South West Zone)
AHMEDABAD MUNICIPAL CORPORATION
Section II - CONDITIONS OF PARTICULAR APPLICATION
1. The selection process will lay high emphasis on the ability and competency of contractors to do high
quality work within the given time schedule.
2. The onus of providing, all necessary company / project related information, in appropriate manner and
medium, so as to demonstrate the competency of the bidder and to allow proper evaluation, will rest
entirely on the Bidder.
3. All information has to be typed or hand written legibly. All pages of the Bid have to be Initialed by the
4. ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY.
Projects for which incomplete information has been provided will not be considered for evaluation. The
Bidder may attach separate sheets if so required. However, the final bound document submitted, has to
be submitted in vertical A4 size (210 mm X 297 mm) except Vol. V.
5. The scope of work, project description mentioned in the document is indicative and is likely to change
during detail design. Project brief, along-with the schematic drawings and colored photographs, is
provided to assist the bidder in understanding the fundamental and specific requirements of the project.
6. Conditional tenders will not be accepted.
7. AMC’s decision for selection or rejection of the offers shall be final and binding to all.
8. Bidder should provide information as mentioned in the prescribed forms.
Information other than that related to this work shall not be considered for evaluation.
9. If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable for
disqualification / rejection at any stage.
10. Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the Tender
volume is submitted without valid documents and without proof of eligibility criteria will be rejected.
11. Those who do not meet with the eligibility criteria need not submit the Tender document.
12. Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect or are
conditional tenders, will be rejected.
13. Municipal Commissioner reserves the rights to reduce/ increase the scope of work and contract without
assigning any reason thereof.
14. DEFECTS: For completion of any work/ part thereof, contractor will be required to request in writing,
to get completion certificate from Additional City Engineer . Date of completion for start of defect
liability period will be considered as the date mentioned in the completion certificate.
The contractor shall be required to make good all the damages / defects identified and conveyed to
him, during the entire defect liability period. The method and time limit of rectification will be
decided by the Engineer in charge. If he fails to carry out rectification as per the instructions, the
same will be carried out at his cost and it shall be recovered from the amount retained.
16. All the material and other test expenses shall be borne by the contractor. Contractor shall have to
provide vehicle and other communication facilities to visit plant and testing laboratory.
17. Contractor shall have to make his own arrangements for water and electricity for the purpose of
construction work at site at his own expense.
18. If the contractor fails to execute the said works within prescribed time limit, the said work will be carried
out at the risk and cost by other contractors with 20 % supervision charges as may be decided by the
Additional City Engineer.
19. Safety and Signage
Contactor has to arrange for the complete safety of the persons working for project, users of the road i.e.
public and vehicles also. All the arrangements of traffic drums, metal / fiber cones, traffic blinkers,
traffic signs as per design, safety tapes etc. to be arranged at site. Necessary florescent marking on
traffic signs to be provided so that it should be visible at night. During night working hours safety in
charge personnel shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary
diversions for proper working at site including traffic signage, safety cones, traffic blinkers,
barricading tapes, red and green flags/lights etc for making easy smooth and safe conditions for
the traffic. The Contractor shall and must provide above at his own cost. If the Contractor fails to
comply this clause, Rs. 500/- per day shall be recovered from his bill.
20. Tax, Duties on Materials
All charge on account of Octroi, excise duties, terminal tax, sales tax. Service tax, VAT, govt.duties etc.
on material procurement or any other component for the works from any source shall be borne by the
21. Submission of project schedule:
Contractor has to submit the following documents along with the qualification data of the tender failing
in which shall lead to rejection of the tender.
Contractor shall submit the detailed Project schedule showing break up for the various tasks to be performed
in order of their occurrence during the project in Microsoft Project/Prima Vera format.
22 For Flakiness and Elongation Index norms adopted by AMC shall be made applicable.
23. For non-bituminous, bituminous and concrete works, the black trap aggregates of required size shall be
procured from quarry situated in Sevaliya / Timba region or equivalent. Prior approval of source/ material by
Additional City Engineer shall be required.
24. Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the existing laws as
well as framed from time to time). Any penalties laid due to violation of such laws shall be directly deducted from the
contractor's outstanding.
25. As per St. Committee's resolution 0.5% testing charges shall be deducted from each R.A. Bill
and the amount of actual Testing charges shall be adjusted in the final bill.
26. Special Clause: As per construction works welfare cess Act – 1996 non-refundable one percent of
tender amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
(South West Zone)
AHMEDABAD MUNICIPAL CORPORATION
FORM OF BID AND APPENDIX TO BID
(The Appendix forms part of the Bid. Bidders are required to fill up all the blanks in the form of Bid)
NAME OF THE CONTRACT:
Supplying and Laying D.I. water pipeline labour work under from M.P., MLA, Councellor's and
other budget in vejalpur ward, south West Zone. (ARC). (RE-INVITE)
Addl.City Engineer (SOUTH West Zone)
"South west Zone, Zonal Office",
Nr. SELBI HOSPITAL,
Ahmedabad. Gujarat
1. Having examined the Conditions of Contract, Specifications, Bill of Quantities, Drawings and
Addenda No._______ for the execution of the above named works, we, the undersigned, offer to
execute and complete such works and remedy any defects therein in conformity with the Conditions
of Contract, Specifications, Bill of Quantities, Drawings and Addenda for the sum of
My/our offer works out as under:
Amount put to tender _________ Amount put to tender Rs. _______________
Net Amount Net Amount
2. We acknowledge that the Appendix to Bid forms part of our Bid.
3. We undertake, if our Bid is accepted, to commence the Works on Site within the period stated in the
Appendix to Bid hereto after receipt of an order of the Engineer’s notice to commence, and to
complete and deliver the sections and the whole of the Works comprised in the Contract within the
period stated in the Appendix to Bid hereto.
4. If our Bid is accepted, we will furnish Performance Security (ies) in the form of Bank
Guarantee(s) to be jointly and severally bound on us in accordance with the Conditions of Contract.
5. We agree to abide by this Bid for the period of one hundred and twenty (120) days after the date of
bid opening, and it shall remain binding upon us and may be accepted at any time before the expiry
of that period.
6. Unless and until a formal Agreement is prepared and executed, this Bid, together with your written
acceptance thereof, shall constitute a binding contract between us.
7. We understand that you are not bound to accept the lowest or any Bid you may receive.
8. All the partners of our Joint Venture are legally and severally bound by this Bid1.
9. Municipal Commissioner, Ahmedabad has right to reject any or all bids without giving any reason.
Dated this ____________ day of _______________
in the capacity of __________________ duly authorised2 to sign Bid for and on behalf of
Address (in block capitals)
1. To be deleted if the bidder is not a Joint Venture.
Certified copy of Power of Attorney/Authorization for signature shall be furnished by the Bidder in
accordance with Clause 20 of Instruction to Bidders (Section I).
Seal and Signature of the Bidder Addl.City Engineer
(South West Zone)
TECHNICAL SPECIFICATIONS
Name of work : Supplying and Laying D.I. water pipeline labour work under from
M.P., MLA, Councellor's and other budget in vejalpur ward, south
West Zone. (ARC) (RE-INVITE)
ITEM NO. 1 Providing FoR Cost of Materials & supplying at Materials
(A) Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending,
binding and placing in Position complete upto floor two level (R & B Building
SOR 21-22 Item no. 5.4.11 I.code 05014C)
(B) P/F dead shuttering for slab, beam etc.
( C) Lead (AMC central Stroe i.code 18910001 rate as on dated 21.02.2023)
(D) Jute (Spun Yarn) (AMC central Store i.code 18940001 rate as on dated
(E) Nut Bolt (AMC central Store i.code 10550138 rate as on dated 21.02.2023)
(F) MS Plate (as per building SOR)
(G) MS pipe /piece
(H) MS Ring flange
(I) MS Blank flange
(J) Rubber Gasket
As per Instruction of Engg. Incharge
Providing & supplying For Welding Joints
(A) Hiring and operating the 20 KV 3 Phase Electric Generator for operating desilting
machinery and lighting and other requirements with Arranging diesel to run the D.G.
Set Do As Directed. 8 Hrs Shift.
(B) Rent of Welding machine per shift
(C) Rent for Grinder machine per shift
(D) Gas Cutting set per shift
(F) Oxygen bottle
(G) Rent of Tools & Other Charges
(H) Rent of Chain pulley block & Tripod
As per Instruction of Engg. Incharge
Providing For Masonry & RCC Work
(C) M-Seal 100 gm pack
(D)Cement bag (As per building SOR I.code M143)
(E) Grit- Aggregates (As per building SOR I.code M176)
(F) Kapachi Aggregates (As per building SOR I.code M178)
(G) Sand (As per building SOR I.code M209)
(H) Brick (As per building SOR I.code M166)
As per Instruction of Engg. Incharge
Providing and laying controlled cement concrete M.200 and curing complete
excluding the cost of formwork and reinforcement for reinforced concrete work
in (A)Foundations, footings, Base of columns and Mass concrete (Building SOR 21-
22 I.No.5.8.2 I.Code 05024AA)
As per Instruction of Engg. Incharge
Measurement shall be paid by cmt basis.
Labour charges for repairing of lekage CI/Di pipe line for following dia
different places including necessary excavation manually or by machinery
removing mud dewatering cleaning of pipe and leakafe portion and repairing by
inserting lead wool jute tools required for inserting lead wool hiring
charges of excavators Hydra/crane j.c.b dewatering set fuel operator cost of lead
wool etc complete(including all material but excluding cost of pipel) (GWSSB SOR
22-23 SECTION 1 G I.NO 2)
As per Instruction of Engg. Incharge
Measurement shall be paid by no basis.
Labour charges for repairing of lekage CI/Di pipe line for following dia
different places including necessary excavation manually or by machinery
removing mud dewatering cleaning of pipe and leakafe portion and repairing by
inserting lead wool jute tools required for inserting lead wool hiring
charges of excavators Hydra/crane j.c.b dewatering set fuel operator cost of lead
wool etc complete(including all material but excluding cost of pipel)
As per Instruction of Engg. Incharge
Measurement shall be paid by no basis.
Providing, supplying and fixing check nut for sluice valve. C.I./M.S./G.M. or Brass.
Instruction of engg. In charge.
As per Instruction of Engg. Incharge
Measurement shall be paid by no basis.
Labour charges for repiaing of Sluice valve / Reflux valve inlcuding materials,
labours and testing etc. Complete. (i) Replacing of S.S. Spindle only (GWSSB
SOR 22-23 I.no.12.A.3)
As per Instruction of Engg. Incharge
Measurement shall be paid by no basis.
Providing and fixing to wall, ceiling and floor galvanised Mild steel tubes (Medium
grade) of the following nominal bore, tube fitting and clamps including making good the
wall ceiling and floor. (Building SOR 21-22 I.no. 23.2)
(A) 40 mm dia (I.code no. 23001EA)
(b) 25 mm dia (I.code no.23001CA)
(C) 20 mm dia (I.code no. 23001BA)
(D) 15 mm dia (I.code 23001AA)
(E) 50 mm dia (I.code no. 23001FA)
As per Instruction of Engg. Incharge
Measurement shall be paid by rmt basis.
Providing, laying and jointing in true line and level U.P.V.C pipe (SCH - 40) of
following dia. including fittings of standard make as approved by Engineer - in -
charge. Pipe shall be fixed on the wall with the help of clamp at every shall be
concealed as directed including necessary Tee ,bend, any joint & any fittings etc.
including testing of pipe and joints and fixing the same with adhesive solvent,
including cost of all materials (Building SOR 21-22 )
(A) 15 mm (I.code no. 23061)
(B) 25 mm (I.code no. 23062)
( C) 32 mm (I.code no.23063)
(C) 40 mm (I.code no. 23064)
(D)50 mm (I.code no. 23065)
(E) 110mm (I.code no. 23067)
As per Instruction of Engg. Incharge
Measurement shall be paid by rmt basis.
Extra rate over item of excavation of earth for excavation of asphalt
pavement of thickness upto 0.20 meter including demolishing the asphalt
carpet, metal, soiling etc. comp. with stacking the material as directed. (As per
Road ARC tender 22-23)
(a) up to 0.20 meter thickness (By Manual)
(b) 0.20 to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter machine
including cost of operator, fuel & transportation etc complete.
(c) 0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter machine including
cost of operator, fuel & transportation etc complete.
As per Instruction of Engg. Incharge
Measurement shall be paid by smt basis.
Providing and Making hole for House connection on C.I./D.I. or M.S. with labour
cost. Instruction of engg. In charge (As per previous tender Rates)
(F) 2.0" dia on CI/DI Pipe up to300mm dia.
The jointing work shall confirm as to specifications mentioned for Item No. 1, 2 & 3. The excavation for
jointing work shall be done to the required width length and depth as directed by Engineer-in-charge or his
representative. The excavated materials from the gap shall have to be deposited within a lead of 50mt. or
as directed by Engineer-in-charge. The relevant specification fore excavation and refilling shall conform to
Item No. 1. above.
After completion of excavation work jointing shall be done between the periods of two water supply time in
such a way that it will not affect the water supply time in any part of city. This item includes the work of
cutting the existing lime labors for jointing of C.I. specials and valves with the existing line the dewatering
required etc. complete
All the necessary care shall be taken by the contractor during jointing work so that pipe shall not be
cracked beyond the cutting limit.
After completion of jointing work and testing of lead joints. The gap shall be refilled after obtaining
necessary permission of Engineer-in-charge of the work.
The jointing work shall be in line and level with other existing network.
The payment shall be in made on No basis for all the jointing work made for this work. The cost of C.I.
valves shall be measured and paid separately.
Mode of Measurement shall be paid by No. basis
As per Instruction of Engg. Incharge
Measurement shall be paid by no. basis.
Transporting from AMC store and laying spigot and socket New DI pipe line DI-k-
9 pipes of various classes with CI/DI/MS specials of following diameters. Rate
includes excavation up to minimum 1.0 mt. depth from top of pipe / as per
requirement in any soil, refilling after laying pipe, covering and temptation
of carting surplus earth up to 30 mt. lead and watering and compaction.
Clearing the site. All Joints shall be made tight & leak free etc. comp. (As per
previous tender Rates)
As per Instruction of Engg. Incharge
Measurement shall be paid by rmt. basis.
Removing & relaying of existing CI/DI pipe line & Specials, Cleaning of pipe
& Specials from Inside, including excavation, refilling etc. comp. in line &
level with any type of joints as per instruction of engg. in charge (As per
previous tender Rates)
As per Instruction of Engg. Incharge
Measurement shall be paid by rmt. basis.
Labours charges for collecting specials from Municipals store loading
transportation, unloading to the site, laying and fixing CI specials inclusive of
all jointing materials like lead, spun etc.and labour, exacavation re-filling and
nece. dewatering as per instrucation of engg. incharge (As per previous
This Specification covers the requirements for collecting from Municipal Stores or contractor’s
stack yard transportation of cast to work sites laying jointing and field testing of cast iron pipes
and fittings for the water distribution Network.
APPLICABLE CODES :
Various operations such as transport to work sites lowering in trenches laying jointing and field
testing of cast iron pipes and fittings shall comply with all currently applicable standards. In all
cases the latest revision of the standards shall be referred to. If requirements of this specification
conflict with the requirements of the standards this specification shall grove.
(a) IS: 638 Specification for sheet rubber jointing and rubber inserting jointing.
(b) IS: 782 Specification for caulking lead.
(c) IS: 1538 Specification for cast ion fittings for Pressure pipes
for water gas and sewage.
(d) IS: 3114 Code of practice for laying of cast-iron.
(e) IS: 3400 Methods of test for vulcanized rubber (Parts to 20)
(f) IS: 5382 Specification for rubber sealing ring for Gas mains water and sewers.
(g) IS: 6587 Specification for spun hemp yarn.
CARTING AND HANDLING:
Cast iron pipes fittings (specials) and valves with tail pieces shall be transported from the
Municipal Stores or contractor’s stack yard to the work sites at places along the alignment of
pipeline as directed by Owner /Engineer. The Contractor shall be responsible for the safety of
pipes fitting and vales with tail pieces in transit loading/unloading. Every care shall be exercised
in handling pipes and fittings to avoid damage. While unloading the pipes and fittings shall with
steadying ropes of by any other means. Padding shall be provided between coated pipes fittings
and skids to avoid damage to the coating Suitable gape between pipes should be lift at intervals
in order to permit access from one side to the other. In case of spigot socket pipes care should be
taken regarding orientations pipes while unloading. As far as possible pipes shall be ulna added
on one side of the stretch only. The pipes shall be checked for any visible damage (such as
broken edges cracking or spelling of pipe) while undo adding and shall be sorted out for
reclamation any pipe which shows sufficient damage to preclude it from being used shall be
discarded shall be prohibited. Necessary warning boards and lamps should be provided in front
and side of pipes to avoid any accident. Pipes should be stacked with sufficient packing to
prevent rolling of the same. Contractor will be fully responsible for any accident due to pipes or
other materials stacked on site of yard. Contractor will be fully responsible for any legal formalities
arising due to such accident and all legal charges there of shall be paid by contractor of will be
recovered from his running bill of the same or other AMC works.
Each stack of pipes shall contain only pipes of same class and size, with consignment or batch
number marked on it with particulars of supplies wherever possible storage shall be done on film
level and clan ground and wedges shall be provided at the bottom layer to keep the stack stable.
The stack shall be in pyramid shape or the laid lengthwise and crosswise in altimeter layers. The
pyramid stack shall be made for smaller diameter pipes for conserving space in storing them. The
height of the stock shall not exceed 1.5m. Fitting and sluice valves with tail pieces shall be
stacked under cover and separated from pipes.
Rubber rings shall be stored in clean cool store away from windows boiler electrical equipment
and petrol oils or other chemicals Particularly in the field where the rubber nods are being used it
is desirable that they are left out on the ground in the sun or overmuch under heavy frost of snow
The Contractor shall visit the before tendering and get himself acquainted site condition and the
regulations regarding the laying of pipes in congested areas heavy traffics areas etc. The
successful bidder shall take the necessary permission and clearance of all the authorities like dip
ardent of ads traffic water supply and the drainage electricity broad telephone comp any etc.
Wherever necessary. Road reinstatement shall not be included in back filling unless specified.
To protect person from injury and to avoid damage to property adequate barricades construction
signs red lanterns and guards as required shall be placed and mainlined during the progress of
the construction work and unit it is safe for the traffics to use the roadways. The relevant Indian
standards and the rules and regulations of the local authorities in regarded to safety provisions
shall be observed.
General lighting for works site, warning lights, sign boards, fencing etc. shall be provided by
contractor at his own cost. Suitable fencing shall be provided along the sides of trenches and pits.
The post of the fencing shall be of timber securely fixed in the ground not more then 3m.apart and
they shall be less than 75 mm in diameter of less than 1.2 m above the surface of the ground.
There shall be two rails. One near the top of the post and the other about 450 mm. Above the
ground and each shall be from 50 mm to 70 mm in diameter and sufficiently long to run from post
to post which they shall be bound with strong rope. The method of projecting rails beyond the
posts and tying them together where they meet will not be allowed on any account. All along the
edges of the excavated trenches a bank of earth about 1.2. m high shall be formed as required by
the Owner/Engineer for further protection. The above work shall not be paid for separately and
the contractor shall take into account the costs of such works and quote accordingly. Whole work
shall done within 24 hrs. by parts or whole work so that water supply from AMC shall not be
The excavation in the foundation shall be carried out in true and level and shall have the width
and depth as required and as directed. The Contractor shall provide necessary slopes to a safe
angle or steps as required or directed at his own cost No extra payment shall be made for such
precautionary measures taken. The bottom of the excavated area shall be leveled both
longitudinally and transversely as directed by removing excess soil and watering as required. No
earth filling will be allowed for bringing it to level if by mistake or any other reason excavation is
made deeper or wider than as directed. The extra depth or width shall be made up with concrete
of the same proportion as specified for the foundation concrete at the cost of the contractor. The
excavation up to any required depth shall be carried out under this item as required and directed
by engineer in charge.
Excavation in trenches for service lines- Water supply and Drainage :
Excavation in trenches shall be carried out in any material encountered on the site to enable the
service lines to be laid to the lines and levels shown and as directed. Excavation shall be made
with adequate and stable side slopes or shoring strutting if necessary. The contractor shall
provide all measures to protect adjoining properties service limes etc. The contractor shall take
necessary action to keep excavation free from water.
Trenches shall be wide enough to provide sufficient space for joining and inspection. The trench
bed shall be trimmed and rammed with sprinkling of sand or murmur so that the pipes when laid
to the required levels and gradients shall be no the bottom fully supported along the entire length
of the pipe. The trench shall be deepened and widened locally to receive the sockets and to
permit the joint to be made and inspected.
Before excavation is started rails shall be erected at convenient places and at all changes of
direction and gradients at a definite and as far as practicable uniform height above the proposed
invert level of the pipes the center lime being clearly marked on each horizontal rail. The depth of
excavation and level of the pipe invert shall be checked by means of benching road of
appropriate lengths.
Disposal of the Excavated Stuff :
The excavated stuff of the selected type shall be used for filling the trenches and plinth or leveling
the ground in layers including ramming and watering etc. complete. The Contractor shall remove
the balance of the excavated from the site of work to a place as directed within a lead upto 50mt
and for all lift.
Filing of Trenches:
As soon as the work in foundation has been completed and measured the sides of foundation
shall be cleared of all dedans brick bats mortar dropping etc. and filled with earth in layers not
exceeding 15 cm Each layer shall be adequately watered rammed well and consolidated before
the succeeding layer is laid. The earth shall be rammed with iron rammers where feasible and
with the butt ends in layer of crowbars where rammer cannot be used. The plinth shall be similarly
filled with earth in layers not exceeding 15 cm adequately watered and consolidated by ramming
with iron or wooden rammers. When filling reaches finished level the surface shall be flooded with
water for at least 24 hours and allowed to dry and then rammed and consolidated. The finished
level of filing shall be kept to shape and gradient intended to receive any floor finish. The
excavated stuff of the selected type only shall be allowed to be used for filling the trenches and
plinths. Under no circumstances black cotton soil shall be used for filling the plinths.
FILLING MATERIALS:
Filling materials may be either excavated stuff of selected materials brought from outside.
Excavated stuff or selected earth to be used shall be cleared of all rubbish large size stones brick
bats etc. complete and big clods shall be broken down to a size of 50 mm or less. The selected
soil and or murmur or any other materials shall be got approved before filling.
Refilling shall be done in a systematic manner by the contractor before refilling starts, the
contractor shall got checked the trenches ready for refilling. The space between foundation
masonry concrete pipe line and the sides of excavation and/or bottom of found at ion shall be
refilled to the original surface or up to plinth level with earth or selected materials in layers of
cm to 20 cm each well watered and rammed.
Each layer shall be watered and compacted with heavy rammer before the upper layer is laid till
the final level is reached to form a thoroughly compacted base. Refilling on top of pipe shall be
carried out carefully with selected soft stuff out of the excavated stuff. The refilling shall be raised
about 5 cams. For subsequent settlements.
The contractor shall be responsible for any settlement during passage of time of during monsoon
and the same shall be refilled with stuff brought from the out side if necessary. The process of
refilling brunches in plinth watering ramming shall be carried out in such a way as not to danger to
pipe line for foundation footing plinth well etc. already laid or built up. If watering is not done by
contractor with its own arrange meant watering charges at 20% of this item rate shall be deducted
from the bill against this item.
The rubber ring shall be stored in a cool dark dry and dust free environment The storage shall not
be exposed to direct sunlight or any heat radiating appliance. The rings shall not be allowed to
come in contact with any fuels and shall be stored free of tension.
Rubber rings shall be clearly labeled in bundles to indicate the type of ring. The size of pipes for
which they are to be used the manufacturer’s name or trademark and the month and the year of
manufacture. The rings shall comply with IS 5382 regarding their material finish tolerance in
dimension and physical requirement.
The rubber rings shall be such that they shall not show any signs of deterioration for any reason
during the contract period plus the defects liability period, Entire expenses associated with
correcting defects in this regard including replacement of rubber rings shall be fully borne by the
contractor. In jointing cast iron spigot and socket pipes and fitting with tycoon flexible joints the
contractor shall take into account the manufacturer’s recommendations as to the methods and
equipment to be used in assembling the joints. In particular the contractor shall ensure that the
spigot end of the pipe to be jointed is smooth and has been properly chamfered that the rubber
ring as per IS 5382 is correctly positioned in the socket and that the two pipes are accurately in
line, before the joint is made. The rubber rings and any recommended lubricant shall be obtained
only through the pipe supplier or as directed by the Engineer.
LEAD CAULKING JOINTS
The jointing shall be done with molten lead and spun yam. Pin lead shall be of uniform quality
clean and free from foreign materials. It shall be of uniform softness capable of being easily
caulked or driven. It shall conform to IS: 782 Spun yarn shall be of clean hemp and of good
quality. It shall conform to IS: 6587 Its quantity shall be as follows.
Quantities of spun Yarn for Different Sizes of Pipes
(Materials for single collar joints)
Nominal Internal Diameter Mm Spun Yarn Mass Kg
Note: Under special circumstances the Engineer-in-charge may decide the quantities of
spun yarn depending upon the site conditions.
The quantity of different diameters of C.L. pipes and fittings shall be as follows:
QUNTITIES OF LEAD YARN FOR DIFFERENT SIZES OF PIPES
Normal Size of Lead/Joint kg Depth of lead
Pipe mm Joint mm
QUANTITIES OF LEAD YARN FOR DIFFERENT SIZES OF PIPES
Normal Size of Lead/Joint kg Depth of lead
Pipe mm Joint mm
Note: The quantities of lead given are provisional and a variation of 20 percent is
permissible either way.
Lead shall be heated in a melting pot kept in easy reach of the joint to be poured so that the
molten metal will not be chilled in being carried from the melting pot to the joint and shall be
brought to a proper temperature so that when stirred it will show a rapid change of color. Before
pouring all scum shall be removed.
Each joint shall be made with one continuous pour filling of the entire joint space with solid lead.
Spongy or imperfectly f illed joints shall be bunt out and repaired.
The joint runner shall fit snugly against the face of the socket and the outside of the pipe shall be
dammed with clay to from a pouring lip to provide for filling the joint flush with the face and to the
top of the socket. The jointed is done by first caulking in spun yam, then filling the remainder of
the joint space by running in molten lead, taking care that no dross enters the joint and then
thoroughly caulking the lead. The spun yam shall be used to center the spigot in the socket and
to prevent the flow of molten lead into the bore of the pipe. After the lead has been run into the
joint the lead shall be thoroughly caulked. Caulking of joints shall be done after a convenient
length of the pipes has been laid and leaded. The leading ring shall first be removed and any lead
outside the socket shall be removed with a flat chisel and then joint caulked removed with a flat
chisel and then the joint caulked around three times with caulking tools of
increasing thickness and hammer of 2 kg. Weight Lead run joints shall be preferably finished
mm behind the socket face. The joints shall not be covered till the pipe line has been tested under
specified hydrostatic test pressure, though the rest of the pipe line should be covered up to
prevent expansion and contraction due to variation in temperature.
Filling available excavated earth (excluding rock) in trenches plinth sides of foundation etc. in
layers not exceeding 20 cams. In depth consolidating each deposited layer by ramming and
The refilling will generally refer to refilling of pipe line trenches, foundation trenches up to plinth
level or ground level with excavated stuff selected soil brought from outside.
Clearing or Trenches or Ground :
The excavated trenches for foundation or ground over which filling is to be done shall be cleared
off all grass loose stones rubbish of all kinds brick bats as well as tress roots etc.
They shall be well watered before stuff is laid.
Mode of measurement for Item No. 1 Rmt. basis.
Mode of measurement for Item No. 2 to 5 No. basis.
Mode of measurement for Item No. 6 Kg. basis.
As per Instruction of Engg. Incharge
Measurement shall be paid by kg. basis.
Labour charges for installing and jointing Sluice Valves including loading,
transporting from owner's store, lowering in location to the required with
excavation refilling alignment by crane/ tripod and chain block including cost
of total nos. of nuts, bolts, Necessary gaskets and excluding fixing of tail pieces
with lead & jute etc complete as directed by Engg. in charge. (As per previous
This Specification covers the requirements for collecting from Municipal Stores or contractor’s
stack yard transportation of cast to work sites laying jointing and field testing of cast iron pipes
and fittings for the water distribution Network.
APPLICABLE CODES :
Various operations such as transport to work sites lowering in trenches laying jointing and field
testing of cast iron pipes and fittings shall comply with all currently applicable standards. In all
cases the latest revision of the standards shall be referred to. If requirements of this specification
conflict with the requirements of the standards this specification shall grove.
(a) IS: 638 Specification for sheet rubber jointing and rubber inserting jointing.
(b) IS: 782 Specification for caulking lead.
(c) IS: 1538 Specification for cast ion fittings for Pressure pipes
for water gas and sewage.
(d) IS: 3114 Code of practice for laying of cast-iron.
(e) IS: 3400 Methods of test for vulcanized rubber (Parts to 20)
(f) IS: 5382 Specification for rubber sealing ring for Gas mains water and sewers.
(g) IS: 6587 Specification for spun hemp yarn.
CARTING AND HANDLING:
Cast iron pipes fittings (specials) and valves with tail pieces shall be transported from the
Municipal Stores or contractor’s stack yard to the work sites at places along the alignment of
pipeline as directed by Owner /Engineer. The Contractor shall be responsible for the safety of
pipes fitting and vales with tail pieces in transit loading/unloading. Every care shall be exercised
in handling pipes and fittings to avoid damage. While unloading the pipes and fittings shall with
steadying ropes of by any other means. Padding shall be provided between coated pipes fittings
and skids to avoid damage to the coating Suitable gape between pipes should be lift at intervals
in order to permit access from one side to the other. In case of spigot socket pipes care should be
taken regarding orientations pipes while unloading. As far as possible pipes shall be ulna added
on one side of the stretch only. The pipes shall be checked for any visible damage (such as
broken edges cracking or spelling of pipe) while undo adding and shall be sorted out for
reclamation any pipe which shows sufficient damage to preclude it from being used shall be
discarded shall be prohibited. Necessary warning boards and lamps should be provided in front
and side of pipes to avoid any accident. Pipes should be stacked with sufficient packing to
prevent rolling of the same. Contractor will be fully responsible for any accident due to pipes or
other materials stacked on site of yard. Contractor will be fully responsible for any legal formalities
arising due to such accident and all legal charges there of shall be paid by contractor of will be
recovered from his running bill of the same or other AMC works.
Each stack of pipes shall contain only pipes of same class and size, with consignment or batch
number marked on it with particulars of supplies wherever possible storage shall be done on film
level and clan ground and wedges shall be provided at the bottom layer to keep the stack stable.
The stack shall be in pyramid shape or the laid lengthwise and crosswise in altimeter layers. The
pyramid stack shall be made for smaller diameter pipes for conserving space in storing them. The
height of the stock shall not exceed 1.5m. Fitting and sluice valves with tail pieces shall be
stacked under cover and separated from pipes.
Rubber rings shall be stored in clean cool store away from windows boiler electrical equipment
and petrol oils or other chemicals Particularly in the field where the rubber nods are being used it
is desirable that they are left out on the ground in the sun or overmuch under heavy frost of snow
The Contractor shall visit the before tendering and get himself acquainted site condition and the
regulations regarding the laying of pipes in congested areas heavy traffics areas etc. The
successful bidder shall take the necessary permission and clearance of all the authorities like dip
ardent of ads traffic water supply and the drainage electricity broad telephone comp any etc.
Wherever necessary. Road reinstatement shall not be included in back filling unless specified.
To protect person from injury and to avoid damage to property adequate barricades construction
signs red lanterns and guards as required shall be placed and mainlined during the progress of
the construction work and unit it is safe for the traffics to use the roadways. The relevant Indian
standards and the rules and regulations of the local authorities in regarded to safety provisions
shall be observed.
General lighting for works site, warning lights, sign boards, fencing etc. shall be provided by
contractor at his own cost. Suitable fencing shall be provided along the sides of trenches and pits.
The post of the fencing shall be of timber securely fixed in the ground not more then 3m.apart and
they shall be less than 75 mm in diameter of less than 1.2 m above the surface of the ground.
There shall be two rails. One near the top of the post and the other about 450 mm. Above the
ground and each shall be from 50 mm to 70 mm in diameter and sufficiently long to run from post
to post which they shall be bound with strong rope. The method of projecting rails beyond the
posts and tying them together where they meet will not be allowed on any account. All along the
edges of the excavated trenches a bank of earth about 1.2. m high shall be formed as required by
the Owner/Engineer for further protection. The above work shall not be paid for separately and
the contractor shall take into account the costs of such works and quote accordingly. Whole work
shall done within 24 hrs. by parts or whole work so that water supply from AMC shall not be
The excavation in the foundation shall be carried out in true and level and shall have the width
and depth as required and as directed. The Contractor shall provide necessary slopes to a safe
angle or steps as required or directed at his own cost No extra payment shall be made for such
precautionary measures taken. The bottom of the excavated area shall be leveled both
longitudinally and transversely as directed by removing excess soil and watering as required. No
earth filling will be allowed for bringing it to level if by mistake or any other reason excavation is
made deeper or wider than as directed. The extra depth or width shall be made up with concrete
of the same proportion as specified for the foundation concrete at the cost of the contractor. The
excavation up to any required depth shall be carried out under this item as required and directed
by engineer in charge.
Excavation in trenches for service lines- Water supply and Drainage :
Excavation in trenches shall be carried out in any material encountered on the site to enable the
service lines to be laid to the lines and levels shown and as directed. Excavation shall be made
with adequate and stable side slopes or shoring strutting if necessary. The contractor shall
provide all measures to protect adjoining properties service limes etc. The contractor shall take
necessary action to keep excavation free from water.
Trenches shall be wide enough to provide sufficient space for joining and inspection. The trench
bed shall be trimmed and rammed with sprinkling of sand or murmur so that the pipes when laid
to the required levels and gradients shall be no the bottom fully supported along the entire length
of the pipe. The trench shall be deepened and widened locally to receive the sockets and to
permit the joint to be made and inspected.
Before excavation is started rails shall be erected at convenient places and at all changes of
direction and gradients at a definite and as far as practicable uniform height above the proposed
invert level of the pipes the center lime being clearly marked on each horizontal rail. The depth of
excavation and level of the pipe invert shall be checked by means of benching road of
appropriate lengths.
Disposal of the Excavated Stuff :
The excavated stuff of the selected type shall be used for filling the trenches and plinth or leveling
the ground in layers including ramming and watering etc. complete. The Contractor shall remove
the balance of the excavated from the site of work to a place as directed within a lead upto 50mt
and for all lift.
Filing of Trenches:
As soon as the work in foundation has been completed and measured the sides of foundation
shall be cleared of all dedans brick bats mortar dropping etc. and filled with earth in layers not
exceeding 15 cm Each layer shall be adequately watered rammed well and consolidated before
the succeeding layer is laid. The earth shall be rammed with iron rammers where feasible and
with the butt ends in layer of crowbars where rammer cannot be used. The plinth shall be similarly
filled with earth in layers not exceeding 15 cm adequately watered and consolidated by ramming
with iron or wooden rammers. When filling reaches finished level the surface shall be flooded with
water for at least 24 hours and allowed to dry and then rammed and consolidated. The finished
level of filing shall be kept to shape and gradient intended to receive any floor finish. The
excavated stuff of the selected type only shall be allowed to be used for filling the trenches and
plinths. Under no circumstances black cotton soil shall be used for filling the plinths.
FILLING MATERIALS:
Filling materials may be either excavated stuff of selected materials brought from outside.
Excavated stuff or selected earth to be used shall be cleared of all rubbish large size stones brick
bats etc. complete and big clods shall be broken down to a size of 50 mm or less. The selected
soil and or murmur or any other materials shall be got approved before filling.
Refilling shall be done in a systematic manner by the contractor before refilling starts, the
contractor shall got checked the trenches ready for refilling. The space between foundation
masonry concrete pipe line and the sides of excavation and/or bottom of found at ion shall be
refilled to the original surface or up to plinth level with earth or selected materials in layers of
cm to 20 cm each well watered and rammed.
Each layer shall be watered and compacted with heavy rammer before the upper layer is laid till
the final level is reached to form a thoroughly compacted base. Refilling on top of pipe shall be
carried out carefully with selected soft stuff out of the excavated stuff. The refilling shall be raised
about 5 cams. For subsequent settlements.
The contractor shall be responsible for any settlement during passage of time of during monsoon
and the same shall be refilled with stuff brought from the out side if necessary. The process of
refilling brunches in plinth watering ramming shall be carried out in such a way as not to danger to
pipe line for foundation footing plinth well etc. already laid or built up. If watering is not done by
contractor with its own arrange meant watering charges at 20% of this item rate shall be deducted
from the bill against this item.
The rubber ring shall be stored in a cool dark dry and dust free environment The storage shall not
be exposed to direct sunlight or any heat radiating appliance. The rings shall not be allowed to
come in contact with any fuels and shall be stored free of tension.
Rubber rings shall be clearly labeled in bundles to indicate the type of ring. The size of pipes for
which they are to be used the manufacturer’s name or trademark and the month and the year of
manufacture. The rings shall comply with IS 5382 regarding their material finish tolerance in
dimension and physical requirement.
The rubber rings shall be such that they shall not show any signs of deterioration for any reason
during the contract period plus the defects liability period, Entire expenses associated with
correcting defects in this regard including replacement of rubber rings shall be fully borne by the
contractor. In jointing cast iron spigot and socket pipes and fitting with tycoon flexible joints the
contractor shall take into account the manufacturer’s recommendations as to the methods and
equipment to be used in assembling the joints. In particular the contractor shall ensure that the
spigot end of the pipe to be jointed is smooth and has been properly chamfered that the rubber
ring as per IS 5382 is correctly positioned in the socket and that the two pipes are accurately in
line, before the joint is made. The rubber rings and any recommended lubricant shall be obtained
only through the pipe supplier or as directed by the Engineer.
LEAD CAULKING JOINTS
The jointing shall be done with molten lead and spun yam. Pin lead shall be of uniform quality
clean and free from foreign materials. It shall be of uniform softness capable of being easily
caulked or driven. It shall conform to IS: 782 Spun yarn shall be of clean hemp and of good
quality. It shall conform to IS: 6587 Its quantity shall be as follows.
Quantities of spun Yarn for Different Sizes of Pipes
(Materials for single collar joints)
Nominal Internal Diameter Mm Spun Yarn Mass Kg
Note: Under special circumstances the Engineer-in-charge may decide the quantities of
spun yarn depending upon the site conditions.
The quantity of different diameters of C.L. pipes and fittings shall be as follows:
QUNTITIES OF LEAD YARN FOR DIFFERENT SIZES OF PIPES
Normal Size of Lead/Joint kg Depth of lead
Pipe mm Joint mm
QUANTITIES OF LEAD YARN FOR DIFFERENT SIZES OF PIPES
Normal Size of Lead/Joint kg Depth of lead
Pipe mm Joint mm
Note: The quantities of lead given are provisional and a variation of 20 percent is
permissible either way.
Lead shall be heated in a melting pot kept in easy reach of the joint to be poured so that the
molten metal will not be chilled in being carried from the melting pot to the joint and shall be
brought to a proper temperature so that when stirred it will show a rapid change of color. Before
pouring all scum shall be removed.
Each joint shall be made with one continuous pour filling of the entire joint space with solid lead.
Spongy or imperfectly f illed joints shall be bunt out and repaired.
The joint runner shall fit snugly against the face of the socket and the outside of the pipe shall be
dammed with clay to from a pouring lip to provide for filling the joint flush with the face and to the
top of the socket. The jointed is done by first caulking in spun yam, then filling the remainder of
the joint space by running in molten lead, taking care that no dross enters the joint and then
thoroughly caulking the lead. The spun yam shall be used to center the spigot in the socket and
to prevent the flow of molten lead into the bore of the pipe. After the lead has been run into the
joint the lead shall be thoroughly caulked. Caulking of joints shall be done after a convenient
length of the pipes has been laid and leaded. The leading ring shall first be removed and any lead
outside the socket shall be removed with a flat chisel and then joint caulked removed with a flat
chisel and then the joint caulked around three times with caulking tools of
increasing thickness and hammer of 2 kg. Weight Lead run joints shall be preferably finished
mm behind the socket face. The joints shall not be covered till the pipe line has been tested under
specified hydrostatic test pressure, though the rest of the pipe line should be covered up to
prevent expansion and contraction due to variation in temperature.
Filling available excavated earth (excluding rock) in trenches plinth sides of foundation etc. in
layers not exceeding 20 cams. In depth consolidating each deposited layer by ramming and
The refilling will generally refer to refilling of pipe line trenches, foundation trenches up to plinth
level or ground level with excavated stuff selected soil brought from outside.
Clearing or Trenches or Ground :
The excavated trenches for foundation or ground over which filling is to be done shall be cleared
off all grass loose stones rubbish of all kinds brick bats as well as tress roots etc.
They shall be well watered before stuff is laid.
Mode of measurement for Item No. 1 Rmt. basis.
Mode of measurement for Item No. 2 to 5 No. basis.
Mode of measurement for Item No. 6 Kg. basis.
Cutting of existing pipelines of following diameters including carting of nece.
specials from AMC store to site and from site to AMC store (recovered materials)
nace. labours for excavation, jodan & backfilling fitter, supervisor, etc. complete.
Rate also includes electric cutter, dewatering pump fuel and transportation of
machineries, chain pulley block if requires working at an instructed specific time
of day or night etc. complete. (As per previous tender Rates)
As per Instruction of Engg. Incharge
Measurement shall be paid by nos. basis.
Supplying, labour for excavation of all types of soil at any depth including excavation of
asphalt pavement of any thickness, demolition of brick work in CM of any
proportion including stacking of serviceable materials and disposal of unserviceable
material etc. comp. as directed.
A) Mazdoor at day /night (As per min.wages circular of GOG)
B) Fitter at day / Night (As per min.wages circular of GOG)
C) Makadam/ supervision/Fitter at day / Night
As per Instruction of Engg. Incharge
Measurement shall be paid by nos. basis.
Dewatering by pumping set of required capacity including temporary platform
carting pumping at site and fixing the same in position including all accessories,
and fuel and labour etc. Complete (A) Pump set of Capacity (GWSSB SOR 22-
23 Section 2E-miscellaneous Item no. 1)
As per Instruction of Engg. Incharge
Measurement shall be paid by HP/Hr. basis.
Providing & Supplying JCB Machine on rental basis in case of emergency situation
and break down type work & also during unavoidable condition as per instruction
of Engg. In Charge, rate includes all nece. Shifting, fuel and operating charges and
stacking of useful & non-useful materials separately up to store. (As per previous
As per Instruction of Engg. Incharge
Measurement shall be paid by Hr. basis.
Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on
site by using Operator, fuel, power Supply etc. Complete as Directed. (As per previous
As per Instruction of Engg. Incharge
Measurement shall be paid by Hr. basis.
Excavation for trial pit for location of existing line including excavation of any
depth including refilling, watering etc. Comp (As per previous tender Rates)
As per Instruction of Engg. Incharge
Measurement shall be paid by nos. basis.
Labour charges for doing washout of water pipe line at end including necessary
excavation of pit, allowing the water to flow for 15 minutes twice or thrice as per site
condition during supply hour, dewatering the pit and plugging with existing
wooden butch and refilling the pit .etc. comp .as per instruction (As per previous
As per Instruction of Engg. Incharge
Measurement shall be paid by nos. basis.
P/S OF good quality of rubber rings for following dia meter. (As per previous tender
The rings shall comply with IS 5382 regarding their material finish, tolerance in dimension and
physical requirements. The rubber rings shall be stored in a cool dark, dry and dust free
environment . The storage location shall not be exposed to direct sunlight or any heat
radiatingappliance.
The rings shall not be allowed to come in contact with any fuel s and shall be stored free of
Rubber rings shall be clearly labeled in bundles to indicate the type of ring. The size of pipes for
which they are to be used, the manufacturer’s name or trademark and the month and the year of
Mode of measurement
Measurement shall be paid by No. basis
Supplying wooden taper butches from jungle wood (Like limda, ambo) Etc. comp. (As
per previous tender Rates)
A) 15 Mm dia. to 20 MM dia.
B) 25 Mm dia. to 37 MM dia.
D) 80 mm dia to 100 mm dia line
As per Instruction of Engg. Incharge
Measurement shall be paid by nos. basis.
Labour charges for repairing of sluice valve / reflux valve including
materials, labours and testing etc.,complete (B)Replacing of Glan packing only
(GWSSB SOR-22-23)
As per Instruction of Engg. Incharge
Measurement shall be paid by nos. basis.
Providing and laying (to level or slopes) and jointing with stiff mixture of Cement
Mortar in proportion 1:1 Salt glazed stoneware pipes including testing of pipes and
joints complete
A. 100 mm (I.code 24001AA)
B. 150 mm (I.Code 24001BA)
As per Instruction of Engg. Incharge
Measurement shall be paid by Rmt. basis.
Fixing of valve Road box incl .locating valve, nece. excavation, tem also inclues cartring
form AMC store to site. Etc.Comp. as directed (As per previous ARC tender rates)
As per Instruction of Engg. Incharge
Measurement shall be paid by nos. basis.
Providing, laying, spreading and compacting graded stone aggregate to wet
mix macadam specification including premixing the Material with water at
OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying
in uniform layers in sub- base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired density as per Codal
Provision. (RA Approved St.Com.Res No.189, Dt.19/05/2022)
Wet Mix Macadam :- This item is for Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including premixing the Material with water at OMC
in mechanical mix plant or at any convinent place and carriage of mixed Material by tipper /
tractor or by any other means to site, laying in uniform layers with paver / grader / tractor pavadi
in sub- base / base course on well prepared surface and compacting with vibratory / static roller
to achieve the desired density as directed by engineer in charge of work.
(A) Supply of WMM
(B) Laying of WMM
Hiring of Tractor with trolley considering 8 Hrs. As working Day hours inclu. Driver
(GWSSB SOR -22-23 Section 2E-Miscellenous Item no. 7)
Providing & Supplying tractor with four labour rate also including fuel,driver,all necessary tools within
AMC Limit as directed Engineer Incharge.
Barricading the entire break down or excavated area on rental basis using
wooden ballies / M.S. angles at max. 2.00 meter centre to centre, C.G.I. Sheet,
reflective paint / Board outside to avoid accident & for smooth traffic diversion
& movement including cautionary board etc. Item also includes for making
temporary sufficient nos of lighting arrangement throughout the work with
necessary required arrangement. ..The same shall be removed after completion of
work. (Only for break down work from start to complete) (As per previous ARC
As per Instruction of Engg. Incharge
Measurement shall be paid by RMT basis.
Reinstatement of Asphalt road/any kind of paving/flooring using the same material.
(As per previous ARC tender rates)
Dismantling the following including loading, unloading and disposal of unserviceable
material for all lead or as directed by Engineer-In-Charge and stacking the serviceable
material and backfilling the resulting trenches and pits complete.
Dismantling tiled or stone floors laid in mortar including stacking of serviceable
material and disposal of uservicalble material with all lead and lifts.
Demolishing work shall be carried out as per instructions given by the
Engineer in charge. Demolishing of stone slab pavement or any other type of paving,
proportion of cement or lime, sorting out materials, carting them up to lead of 60 mts. &
Stacking the different materials separately as directed by the Engineer in charge of
work. The work shall be done carefully.
The Mode of measurement and rate shall be given as per one square meter basis.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (South West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
As per City Engineer’s circular no.-6/2011-12 Dt.24.6.2011 all terms & conditions will
Seal and Signature of the Bidder Addl. City Engineer
Date: (South West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER NO-05.pdf
Download all tender documents and submit your bid