| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr Quoted ₹15.2 L | L1 | Accepted-AOC Being L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically qualified rejected being L6 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically qualified it is rejected being L2 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically qualified it is rejected being L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically qualified it is rejected being L3 |
| Sl No | Description | Qty | Unit | BABU GEORGE L1 | RATHEESH D L4 | SANAL KUMAR L3 | N GOPINATHAN NAIR L2 | AJESH C L6 | SOORAJ V J L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Estimate | |||||||||
| 1.00 | OD67148/2025-2026:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 4,486.42 | sqm | 15.03 ₹67,430.88 | 11 ₹49,350.61 Lowest | 16.19 ₹72,635.12 | 15 ₹67,296.29 | 17.25 ₹77,390.73 | 15 ₹67,296.29 |
| 1.00 | 13.82.2:Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams/ litre, of approved brand and manufacture including applying additional coats wherever required, to achieve even shade and colour.Two coats | 2,993.68 | sqm | 106.82 ₹3,19,784.68 | 115 ₹3,44,272.97 | 115 ₹3,44,272.97 | 104 ₹3,11,342.51 Lowest | 122.59 ₹3,66,994.99 | 130 ₹3,89,178.14 |
| 1.00 | OD75509/2025-2026:Applying with Damp proof paint of approved brand required shade: applied on the wall or top of roof. | 808.52 | sqm | 136.89 ₹1,10,678.3 Lowest | 160 ₹1,29,363.2 | 147.37 ₹1,19,151.59 | 142 ₹1,14,809.84 | 157.1 ₹1,27,018.49 | 160 ₹1,29,363.2 |
| 1.00 | 13.112.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone
additives of required shadeOld work (Two or more coats applied @ 1.43 ltr/ 10 sqm) over existing cement
paint surface | 2,641.95 | sqm | 99.92 ₹2,63,983.84 Lowest | 110 ₹2,90,614.72 | 107.58 ₹2,84,221.2 | 100 ₹2,64,195.2 | 114.68 ₹3,02,979.06 | 120 ₹3,17,034.24 |
| 1.00 | 13.80:Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. | 748 | sqm | 114 ₹85,272 | 130 ₹97,240 | 122.74 ₹91,809.52 | 110 ₹82,280 Lowest | 130.83 ₹97,860.84 | 140 ₹1,04,720 |
| 1.01 | OD68617/2025-2026:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work. | 127.74 | sqm | 79.68 ₹10,178 Lowest | 100 ₹12,773.6 | 85.78 ₹10,957.19 | 100 ₹12,773.6 | 91.44 ₹11,680.18 | 100 ₹12,773.6 |
| 1.01 | 13.68.1:French spirit polishing:Two or more coats on new works including a coat of wood filler | 388.97 | sqm | 339 ₹1,31,862.19 | 400 ₹1,55,589.6 | 364.96 ₹1,41,959.95 | 300 ₹1,16,692.2 Lowest | 389.04 ₹1,51,326.44 | 450 ₹1,75,038.3 |
| 1.01 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 186.62 | sqm | 41.47 ₹7,739.13 | 50 ₹9,331 | 44.65 ₹8,332.58 | 50 ₹9,331 | 47.59 ₹8,881.25 | 40 ₹7,464.8 Lowest |
| 1.01 | 50.4.1.1:Providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc. | 7.57 | cum | 6,707.37 ₹50,754.67 Lowest | 9,250 ₹69,994.75 | 7,221.17 ₹54,642.59 | 8,000 ₹60,536 | 7,697.59 ₹58,247.66 | 9,000 ₹68,103 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
22 Oct 2025, 5:00 pmClosed
Executive Engineer
PWD Buildings Division Thiruvananthapuram
General-State Planning Board Renovation of Rajalekshmi Building Renovation work of Rajalekshmi building at State Planning Board Pattom Civil work
2025_PWD_809562_1
TR/11664/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
120 days
Thiruvananthapuram
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
15 Nov 2025
14 Oct 2025
25 Oct 2025
14 Oct 2025
22 Oct 2025
14 Oct 2025
Amount
Estimate
OD67148/2025-2026:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
13.82.2:Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams/ litre, of approved brand and manufacture including applying additional coats wherever required, to achieve even shade and colour.Two coats
OD75509/2025-2026:Applying with Damp proof paint of approved brand required shade: applied on the wall or top of roof.
13.112.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shadeOld work (Two or more coats applied @ 1.43 ltr/ 10 sqm) over existing cement paint surface
13.80:Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
OD68617/2025-2026:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work.
13.68.1:French spirit polishing:Two or more coats on new works including a coat of wood filler
15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
50.4.1.1:Providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc.
13.7.2:12 mm cement plaster finished with a floating coat of neat cement of mix:1:4 ( 1 cement : 4 fine sand)
14.75:Repair to plaster of thickness 12mm to 20 mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the direction of Engineer-In-Charge.
9.1.1:Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately).Second class teak wood
OD68976/2025-2026:Supplying mangalore roofing tiles including all conveyance etc., complete
OD68975/2025-2026:Removing and readjusting with MP roofing tiles of departmental or supplied tiled etc., complete as per the direction of Engineers in Charge
OD68945/2025-2026:Cutting branches of trees overhanging above any structures of grith below 30 cm including stacking of serviceable materials cost of labour, hire charges of rope and pulley etc.
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
50.18.9.9.2:Providing and fixing PVC pipes includes joints of pipes with one step PVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in CHarge. 110 mm dia 4 Kg/cm2
OD75632/2025-2026:Labour engaged for attending the petty repairs of water supply and sanitary works
OD75633/2025-2026:Labour engaged for attending petty repairs of Door and Windows
OD75634/2025-2026:Labour engaged for assist the fitter carpenter and cleaning the roof top and surroundings etc.complete
N GOPINATHAN NAIR (BID ID -2399853)
SANAL KUMAR (BID ID -2398353)
RATHEESH D (BID ID -2396452)
SOORAJ V J (BID ID -2399235)
AJESH C (BID ID -2402381)
Bidder Name
N GOPINATHAN NAIR
RATHEESH D
BABU GEORGE
SANAL KUMAR
AJESH C
SOORAJ V J
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1350670.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
TenderDocuments.pdf
Tender Documents • 1.13 MB
viewsbd.pdf
Tender Documents • 1.63 MB
BOQ_1350670.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .