Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹2.2 LAccepted-AOC | 1ST | Accepted-AOC L1 Bidder | |
| 2 | 2ND₹2.6 L+₹30,951 (13.8%)Rejected-AOC | 2ND | Rejected-AOC L 3 Bidder | |
| 3 | 3RD₹2.8 L+₹53,101 (23.7%)Rejected-AOC | 3RD | Rejected-AOC L 2 Bidder |
Tender Value
₹3.0 L
EMD Value
₹4,000
Closing Date
23 Feb 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC I, Lucknow
Pareshan Bhawan, Vibhuti Khand, Lucknow
Work
2023_UPTCL_770682_2
short term e-tender 76/2022-23
Open Tender
Electrical Works
Piece-work
30 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 2408002190005438, IFS PUNB0691100, PNB, Lko
₹4,000
21 Apr 2023
16 Feb 2023
24 Feb 2023
16 Feb 2023
23 Feb 2023
16 Feb 2023
Amount
Following works are to be carried out at 132 K.V. Sub Station Gomti Nagar, Lucknow for replacement of 1 No. existing 40 MVA 132 / 33 KV Transformer - II (KANOHAR Make) by new 63 MVA 132 / 33 KV Transformer (TAL make) alongwith associated works against Increasing Capacity including all cost of men, misc. consumables, T&P, Crane, Centrifuging Machine etc. to complete the job satisfactorily :
Dismantling and Shifting of old 40 MVA Transformer-II RTCC Panel from C & R Room including necessary Disconnection of Control Cables including identification of Cables for necessary future connections and Shifting the same at proper place / store as per direction of site Engineer.
Erection of 63 MVA Transformer RTCC Panel including Shifting from storage place to C & R Room as per direction of site Engineer.
Complete safe Dismantling of the accessories of 132 / 33 KV 40 MVA Transformer-II(KANOHAR MAKE) including Opening of Jumpers, Removal of Earthing, Opening of Cable Connections, Draining out of Transformer Oil up to required level in 209 Ltr. capacity Oil Drums, Removal of Conservator Tank, Pipe Lines, Bushings, Cooling Fans, Marshalling Box, Radiators after Draining of Radiator Oil etc. and Fixing of Blanking Plates on the Radiators, Pipe Lines, Conservator Tank, Turret etc. with proper Stacking. Blanking Plate including Bolts & Nuts shall be provided by the Contractor.
Shifting of Main Tank of 132 / 33 KV 40 MVA Transformer to storage place from the Plinth up to 20 Meter distance including turning of Tank if required.
Additional Shifting of Transformer Tank upto 50 Meter distance (1 Job for every 5 Meter)
Shifting of Main Tank of 132 / 33 KV 63 MVA Transformer to Plinth from place of storage up to 20 Meter distance including turning of Tank if required.
Additional Shifting of Transformer Tank upto 50 Meter distance (1 Job for every 5 Meter)
Complete Erection of 132 / 33 KV 63 MVA Transformer including Radiators, Conservator Tank, Bushings, Connecting Pipe Lines, Cooling Fans, Marshaling Box, OTI, WTI, Capilliary Pipes etc.
Top up with fresh Transformer Oil from Transformer Oil Drums in main tank,bushings&conservator of transformer upto required level
Centrifuging / Dehydration of the complete Transformer Oil of Transformer by Ultra High Vacuum Oil Filtration Plant after connecting the Centrifuging Pipes with Oil Tanker to Oil Filtration Plant including taking the BDV Values of Oil and megger values of the Transformer periodically till the required value is achieved, with all cost of Centrifuging Machine, CFM Operator, Lubricants etc.
Making of 02 No. Additional Delta for Neutral Earthing by due fabrication of 3 No. 3.5 Meter long Electrodes of 36 / 40 mm dia. M.S. Round Bar, its piercing under the ground at equal distance of 1 Meter at 700 mm depth by digging of earth and connecting all the 3 No. Electrodes with 75 mm x 10 mm size M.S. Flat & connecting with existing Earthmat and taking out Riser by due cutting, bending, welding etc. as per Technical Specifications.
Earthing of Main Tank, Marshaling Box, Drive Mechanism, Transformer Neutral etc. of 63 MVA Transformer with the help of 50 x 6 mm / 75 x 10 mm size M.S. Flat, its jointing with already laid Earthmat / Deltas including Additional Delta at 2 places and necessary modification in existing support for Earthing of Neutral Bushing support for its Earthing work and then Painting of Earthing Strips as per technical specifications / standard practice.
C) Jumpering, stringing etc of various equipment, Bus sections & 63 MVA T/F etc.
Jumpering of HV & LV Bushings of 63 MVA Transformers through 132 K.V. and 33 K.V. LAs with the help of existing / newly prepared ACSR Twin Moose Conductor respectively with associated Terminal Connectors and P.G. Clamps etc. to connect with 132 K.V. & 33 K.V. Bus Bars / CTs.
Connection of the Cables as per new Cable schedule of 63 MVA Transformer & its RTCC Panel at both ends and Control & Relay Panel, Cooling Fans, Marshaling Box etc. using existing Cables including Laying of additional Control Cables (if required), making necessary holes in the Glands Plates or Box wherever required, Supply & Fixing of Cable Glands of appropriate size, providing of Ferrules as per site requirement and Termination and connection of all existing / new Control Cables at RTCC & Transformer End and C & R end as per standard practice & all other associated works as per Technical Specification.
Proper Packing of HV / LV & Neutral Bushings of dismantled 40 MVA Transformer including proper wrapping with Polythene Sheet in Wooden Crates of new Bushings of 63 MVA Transformer.
Dismantling of 33 K.V. 800 / 1 Amp. CTs by due Opening of Jumpers, Earthing, Cable Connections, Nut & Bolts etc. and Shifting upto Store / designated place at the Sub Station as per direction of site Engineer.
Safe Carriage of 33 KV 33 KV 2000/1250/1 amp. 3 Nos CTs from 220 KV Substation Gomti Nagar to 132 KV Substaation Gomti Nagar including Loading and Unloading (Approx Distance 8 KM)
Erection of 33 K.V. 2000 - 1250 / 1 Amp. CTs as per instruction manual and Technical Specifications including shifting of CTs from Store to Erection site including necessary connection of Cable & Earthing and Jumpering on both sides.
Dismantling of 120 KV LA alongwith ALP structure and proper stacking after opening of jumpers and disconnection of earthing( 1 Job for each set of LA and ALP structure)
Erection of 120 KV LA including erection of ALP structure and connection of earthing with existing MS flat at designated places and jumpering with jack bus as per technical specifications( 1 Job for each set of LA and ALP structure)
Dismantling of existing troublesome 36 KV Vaccum CB after opening of clamps , connectors,conductor etc and shifting it at substation store place (1 Job for 1 CB )
Fabrication for modification in old structures by using new structure pieces with due welding, cutting & making holes for proper erection of new 36 K.V VCBs on old plinth.
Safe Carriage of 36KV 2000A/1600A capacity CB from Transmission Substation in Lucknow (as per availability) to 132 KV Substaation Gomti Nagar including Loading and Unloading (Approx Distance 18 KM)
Erection of New 36KV 2000A/1600A capacity CB and its terminal connector with the help of existing/ newly prepared Twin ACSR MOOSE conductor with associated terminal connectors,earthing of VCB and structure by MS Flat of size 75x10/50x6
Making Cable connections ( laying of cables if required ) in new 36 K.V VCBs and C & R Panel as per drawing provided by the VCB manufacturer with due ferruling & glanding which are to be provided by the firm.
Gupta Elect and Engg Works
HARE KRISHNA ENERGY PROJECTS
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .