Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.2 LAccepted-AOC | ₹19.2 L | L1 | Accepted-AOC Lowest rate quoted by L1 (M/S OM CONSTRUCTION) |
| 2 | L2₹19.7 LRejected-Finance | ₹19.7 L | L2 | Rejected-Finance Lowest rate quoted by L1 (M/S OM CONSTRUCTION) |
Tender Value
₹23.9 L
EMD Value
₹48,500
Closing Date
23 Jun 2026, 5:00 pmClosed
Executive Engineer
Minor Irrigation Division Dhanbad
Upgradation of existing HSC with additional, Parking shed, Boundary wall, Entrance gate, Recharge pit, Sharp pit, P.C.C road approach to HSC, Paver Block Tetulmari Baghmara
2026_WRD_115148_1
DMFT/MIR/DHN/F2-08/26-27/GR-11
Open Tender
Civil Works
Percentage
Baghmara
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹48,500
Yes
19 Aug 2026
15 Jun 2026
25 Jun 2026
15 Jun 2026
23 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation in foundation trenches in ordinary soil (vide classification of soil item –A) as per approved design, building specification and direction of E/I BCD 5.1.1 | - | M3 | 151.82 | - |
| 2 | E/W in excavation in foundation trenches in ordinary soil (vide classification of soil item –A) as per approved design, building specification and direction of E/I BCD 5.1.2 | - | M3 | 15.51 | - |
| 3 | Provding coarse clean sand in filling foundation and plinth with all complete and as per building specfication and dierection of E/I.BCD 5.1.10 | - | M3 | 589.51 | - |
| 4 | Providing designation 75-B one brick flat soling joint filled by local sand all complete as per building specification & direction of E.I BCD 5.6.3 | 1 | M2 | 330.34 | ₹330.01 |
| 5 | Providing P.C.C. M150 with nominal mix of (1:2:4) in foundation and plinth as per building specification and direction of E/I BCD 5.3.1.2 | 1 | M3 | 4,598.23 | ₹4,593.63 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) BCD 5.3.9.1 | 1 | M3 | 5,218 | ₹5,212.78 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) BCD 5.3.10 | 1 | M3 | 6,082.45 | ₹6,076.37 |
| 8 | Reinforcment Cement Concrete work in beams,lintels,landing,balconies,shelves,chajja, band,staircase above plinth level. excluding shuttering & centering with all complete as per specification & direction of E/I. BCD5.3.11 | - | M3 | 6,308.87 | - |
| 9 | Providing dsignation 75-B brick work in cement mortar (1:6) in foundation & plinth with all complete as per bldg. specification and direction of E/I. BCD 5.2.6 | 1 | M3 | 5,110.26 | ₹5,105.15 |
| 10 | Providing 75 B Brick work in S/S in cement mortar (1:6) with all complete as per bldg. specification & direction of E/I. BCD 5.2.14 | - | M3 | 5,244.08 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
termcondition08.pdf
Tender Documents • 3.70 MB
BOQ_155687.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].