Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹5.8 L+₹11,804.09 (2.08%)Admitted-Finance 24 8A MANUJENDRA DUTTA ROAD KOLKATA 700 028 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | L2 | Admitted-Finance | |
| 3 | L3₹6.3 L+₹64,750.37 (11.4%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹6.4 L+₹68,876.70 (12.2%)Admitted-Finance 00 BALITIKURI BALITIKURI NASKARPARA HOWRAH WEST BENGAL 711113 | HOWRAH | WEST BENGAL | 711113 | L4 | Admitted-Finance | |
| 5 | L5₹6.4 L+₹68,876.70 (12.2%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S RAMESH KUMAR JAISWAL L1 | CHAKRABORTY ENTERPRISE L4 | PAL ENTERPRISE L2 | MA MANASHA ENGINEERING WORKS L3 | NUVO BUS TRANSIT SYSTEMS PRIVATE LIMITED L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Full body renovation job (For Aluminum Structure):- No. of working days – 35 days | 1 | No | 50,101 ₹50,101 Lowest | 57,794.38 ₹57,794.38 | 51,785 ₹51,785 | 54,900 ₹54,900 | 57,784 ₹57,784 |
| 2.00 | Partial body renovation job (For Aluminum Structure):- No. of working days – 30 days | 1 | No | 41,499 ₹41,499 Lowest | 49,125.23 ₹49,125.23 | 44,979 ₹44,979 | 49,449 ₹49,449 | 49,135 ₹49,135 |
| 3.00 | Partial body renovation job (For M/S Structure):- No. of working days – 35 days | 1 | No | 48,050 ₹48,050 Lowest | 56,143.11 ₹56,143.11 | 51,404 ₹51,404 | 56,000 ₹56,000 | 56,148 ₹56,148 |
| 4.00 | Full body renovation job (For AC Coach):- No. of working days – 45 days | 1 | No | 78,000 ₹78,000 Lowest | 87,104.39 ₹87,104.39 | 79,752 ₹79,752 | 87,490 ₹87,490 | 87,101 ₹87,101 |
| 5.00 | Partial body renovation job (For AC Coach):- No. of working days – 35 days | 1 | No | 55,000 ₹55,000 Lowest | 66,463.54 ₹66,463.54 | 60,854 ₹60,854 | 66,490 ₹66,490 | 66,463.54 ₹66,463.54 |
| 6.00 | Full body renovation job (For Midi Bus):- No. of working days – 25 days | 1 | No | 35,400 ₹35,400 Lowest | 40,868.89 ₹40,868.89 | 37,419 ₹37,419 | 40,200 ₹40,200 | 40,868.89 ₹40,868.89 |
| 7.00 | Partial body renovation job (For Midi Bus):- No. of working days – 20 days | 1 | No | 27,500 ₹27,500 Lowest | 36,153.69 ₹36,153.69 | 33,102 ₹33,102 | 35,490 ₹35,490 | 36,153.69 ₹36,153.69 |
| 8.00Miscellaneous body repairing Jobs: No. of working days mentioned below:- | ||||||||
| 8.01 | Looking glass to fit. 1/8 day | 1 | No | 50.08 ₹50.08 | 51.52 ₹51.52 | 47 ₹47 Lowest | 49 ₹49 | 51.52 ₹51.52 |
| 8.02 | Looking glass to fit after braket repairing. ¼ day | 1 | No | 150.24 ₹150.24 | 154.58 ₹154.58 | 141 ₹141 Lowest | 154 ₹154 | 154.58 ₹154.58 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
23 Dec 2024, 12:00 pmClosed
General Manager
HRBC Office Compound, Canteen Building, 1st Floor, Munshi Premchand Sarani, Kolkata 700021
In house Bus Body repair/renovation work at Durgapur, Belghoria and Jangal Mahal Divisional Workshop of South Bengal State Transport Corporation (SBSTC) as detailed in Section A, B, C and D of the e-tender Document.
2024_TSWL_784119_1
GM/TENDER/24-25/GE/25
Open Tender
Miscellaneous Services
Item Wise
365 days
Howrah
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
THE SHALIMAR WORKS (1980) LIMITED
₹2 L
Yes
24 Dec 2024
12 Dec 2024
23 Dec 2024
12 Dec 2024
23 Dec 2024
12 Dec 2024
Full body renovation job (For Aluminum Structure):- No. of working days – 35 days
Partial body renovation job (For Aluminum Structure):- No. of working days – 30 days
Partial body renovation job (For M/S Structure):- No. of working days – 35 days
Full body renovation job (For AC Coach):- No. of working days – 45 days
Partial body renovation job (For AC Coach):- No. of working days – 35 days
Full body renovation job (For Midi Bus):- No. of working days – 25 days
Partial body renovation job (For Midi Bus):- No. of working days – 20 days
Miscellaneous body repairing Jobs: No. of working days mentioned below:-
Looking glass to fit. 1/8 day
Looking glass to fit after braket repairing. ¼ day
Inside LCD Monitor to fit. ¼ day
Radiator mounting braket to repair each. ¼ day
Radiator braket to repair. ¼ day
Timing cover to repair. ¼ day
Passenger gate for A/C to adjust for proper closing & opening. ½ day
Bonnet lock to fit/repair each. ¼ day
Driver gate/Passenger gate door lock to change. ¼ day
Mudguard to repair. ½ day
Engine bonnet to be repair. ½ day
Roof top cover to repair for A/C. ½ day
Radiator grill to repair. ½ day
Radiator grill to make newly. 2 days
Driver gate to repair. 1 day
Driver gate to make newly. 2 days
Foot rest for A/C passenger seat to repair. 1 day
Passenger seat shock absorber to repair. 1/4 day
Dickey Lock to repair/Change. 1/4 day
Gear lever bottom cover to make by rexine. 1/4 day
Electrical G/check. ½ day
Wipper machine to fit. ¼ day
Wipper machine to fit after linkage modifying. ½ day
Roof light to fit each. ¼ day
Head light L/S & R/S to fit & line to connect. ½ day
Back light L/S & R/S to fit & line to connect. ½ day
Electric horn to fit & line to connect. ¼ day
Indicator light to fit & line to connect. ¼ day
Combinations switch to change. ¼ day
Stop light line to change. ¼ day
Louver to change for each pair. ¼ day
Self to change. ½ day
Alternator to change. ½ day
Floor mat pasting for A/C buses. 2 days
Valvate pasting for roof inside ceiling. 1 day
Passenger stair mat to past for A/C buses. ½ day
Passenger seat clamp making for each. ¼ day
Back side grill to repair. ½ day
Back side grill to make newly. 1 day
Electrical wiring newly making & fitting. 4 days
New trolly making. 2½ days
Trolly repair. 1 day
Back restcap making (each). 1/8 day
Accidental bend chassis to repair (minor). 3 days
Accidental bend chassis to repair (major). 5 days
Stepny braket to repair. 1 day
Propeller shaft cross member to repair. ½ day
Passenger gate with passenger stair height to shorten. 2 days
Passenger seat handle making (Wooden). 1/8 day
Passenger seat handle making (M/S). 1/2 day
Inside body post to fit. ¼ day
Back seat platform to repair. 1 day
All passenger seat & back rest opening & fitting. 1 day
Head light portion to modify. 2 days
Front Left/Right ventilator glass frame repair/newly makeup. ½ day
Window upper glass to fit. ½ day
Marcopolo window glass and rubber to change. ½ day
Marcopolo window glass sliding to change. ¼ day
Left side golai to repair. 3 days
Right side golai to repair. 3 days
Mudguard rubber to fit. ¼ day
Passenger seat frame newly making (each) (3 seater Deluxe). 2 days
Passenger seat frame newly making (each) (2 seater Deluxe). 2 days
Passenger seat frame newly making (each) (3 seater Semi Deluxe). 2 days
Passenger seat frame newly making (each) (2 seater Semi Deluxe). 2 days
Window glass guard M.S. flat/pipe to fit (each side). ¼ day
Bodu-U-bolt to tighten/change. 1 day
Front show lower both side newly made & painting. 7 days
Miscellaneous body repairing jobs:- No. of working days mentioned below:-
Front structure to be made new (Top to bottom) with painting. 8 days
Left or right side structure to be repaired. (Major). 4 days
Front structure to be repair (Minor). 4 days
Frond wind screen to change left/right side. ¼ day
Frond wind screen to change both side. ½ day
Frond wind screen to change after structure repairing. ½ day
Newly making of curved glass structure to fit new curved glass of varying sizes. 4 days
a) Passenger gate with glass frame to be made newly & painting. 4 days
b) Emergency gate with glass frame to be made newly & painting. 3 days
Stair case to repair (minor). 02 days
Stair case to repair (major). 03 days
a) Window glass frame to repair (each). ½ day
b) Window broken glass to change (each). 1/4 day
Window glass frame to making newly (each). 1 day
Window glass rubber to change (each). 1/4 day
Window glass frame panel structure to repair (each). 1 day
a) Back side body to repair with painting. 3 days
b) Back side body to be made newly including painting. 5 days
Roof tar felt to fit. ½ day
Passenger seat frame to repair (Semi Deluxe) each (including painting). 1 day
Passenger seat frame to repair (Deluxe) each (including painting). 1 day
Front cabin floor to repair. 2 days
Passenger gate golai to repair. 2 days
Diesel tank to washing, repairing & painting. 1 day
Silencer box to repair (opening & fitting). 1 day
Silencer pipe to repair (opening & fitting). 1 day
Air pipe, Diesel pipe, Engine oil pipe to repair (each point). 1/8 day
Front wind screen (single glass) to change. 1 day
Front wind screen (single glass) to change after frame repairing. 2 days
Front wind screen (single glass) to change after frame newly making. 10 days
Front structure to be modified in to two parts from single wind screen. 7 days
A.C. Coach window glass to change (each). ½ day
A.C. Coach window glass to change after structure repairing (each). ½ day
Each passenger seat to repair Rexene changed only (Semi Deluxe). ½ day
Each passenger seat (Semi deluxe) to repair Rexene & ply board to changed. ½ day
Each passenger seat back rest Rexene to change only (Semi Deluxe). ½ day
Each passenger seat back rest Rexene & ply board to change (Semi Deluxe). ½ day
Each passenger seat to repair Rexene to change only (Deluxe). ½ day
Each passenger seat to repair Rexene & ply board to change (Deluxe). ½ day
Each passenger seat back rest & Rexene changed. ½ day
Each passenger seat back rest Rexene & ply board to changed (Deluxe). ½ day
Engine bonnet, Fr. Bumper, Fr. Cross member & Fr. Grill opening & fitting. ½ day
a) Front bumper to repair. ½ day
b) Front bumper to be made newly & painting. 2 days
a) Rear bumper to repair. ½ day
b) Rear bumper to be made newly & painting. 2 days
Front cross member to repair. ½ day
Luggage carrier to repair (inside). 1 day
Luggage dickey to repair. 1 day
Engine Dash board to repair. 1 day
Rear glass to fit. ½ day
Rear glass to fit after making 2 parts. 1 day
Checker plate (gangway) riveting. 1 day
Checker plate (Full) riveting (after seat frame opening). 3 days
Head light cashing (bed Foard types) making in case of FRB show. 2 days
Air cleaner (damaged) repairing. ½ day
Vehicle inside & outside washing. ½ day
Each Tyre lever/hammer wooden handle making. ½ day
Bolt cutting/welding (each). 1/8 day
Any spares heating by gas. 1/8 day
Route board making & painting. ½ day
Route board with frame making & painting & fitting on the vehicle. 1 day
Vehicle under chassis washing. 1 day
Ceiling velvet pasting (full). 2 days
Ceiling velvet pasting (half). 1 day
Accidental body panel (8’ x 4’) repairing & painting. 3 days
Big window glass to change. 1 day
Floor plywood change with mat pasting of A.C. coach. 6 days
Each passenger seat back rest to be made newly of A.C. coach. 1 day
Each passenger seat cushion to be made newly of A.C. coach. 1 day
Each chassis u-bolt of body to be changed & fitment with new balate packing. ½ day
Front engine cashing full repair & properly aligned. 3 days
Each chassis cross member to be changed (including paint). ½ day
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .