Tender Value
₹64.1 L
EMD Value
₹64,127
Closing Date
10 Sept 2026, 4:00 pm
D C Patel
Work of erection of 66KV equipment, Structures, Control wiring, Yard Lighting, Control-Room, Staff-Quarter Electrification & Supply of Furniture & CCTV Camera etc at 66 kV Achhod S/S & associated Line S/S under construction Division Bharuch
337145
TCBRH/26-27/2612
Open
Electrical Works
Works
Bharuch
11 documents required · 10 mandatory · 1 optional
₹5,900
GETCO
₹64,127
20 Aug 2026
20 Aug 2026
20 Aug 2026
10 Sept 2026
20 Aug 2026
1 Tender No. TCBRH/26-27/2612
Work of erection of 66KV equipment,
Structures, Control wiring, Yard Lighting,
Works of Control-Room, Staff-Quarter Electrification &
2 Supply of Furniture & CCTV Camera etc at 66 kV
Achhod S/S & associated Line S/S under
construction Division Bharuch
3 Estimated cost with GST in Rs.
4 Tender Fee (non-refundable)including GST Rs.
5 Earnest Money Deposit amount in Rs.
On line (E-tendering) tender/ offer
6 submission last date up to 16.00 hours only
(This is mandatory)
Physical submission of Tender detail
(Receipt of EMD & tender fee online NA
Payment) , last date up to 15.00 hours. By
RPAD or SPEED POST only.
Date of opening of Tender fee, EMD cover,
Vendor registration and technical bid
physical as well as on – line opening at
16.00 Hours.
Tentative Date of on – line opening of Price Shall be intimated separately
bid, (if possible), at 11.00 Hours
10 Prices Firm
11 Time Limit 120 Days
12 Validity of Bid 180 days
IMPORTANT:
1. All the relevant documents as per requirement of the Tender must be submitted through online
form only. And copy of online payment receipt of Tender Fee and EMD is to be submitted by
mail not physically on OR before due date and time. Bidder has to upload scanned copies of
original (Notarized/self-attested copies of original-as specified in tender document) Documents with
bid and No physical documents to be submitted. except Tender fee and EMD online payment receipt.
Payment receipt should be strictly submitted by RPAD / speed post only before due date. otherwise
the offer will not be considered and no any further communication in the matter will be entertained.
The tender documents in physical form is not to be accepted. (All the online Annexures &
Price bid i.e. Annexures, GTP and price bid are not to be submitted with the physical
documents).
2. Any deviation found in Data / Details / Documents between in line offer (E-tendering) and Online
submitted documents (Tender document) of bidder, offer of the same bidder will not considered and
no any further communication in the matter will be entertained. Tender will be evaluated on Data /
Details / Documents of the on line offer. Whatever item quoted in Annexure-IV/(4) are consider for
technical evaluation. The quantity & GST offered in online price bid shall be considered as final
in case of any discrepancy.
3. It is mandatory for all the bidders to submit their tender documents by on-line (E-tendering) in
schedule time. If tender documents submitted physically in that case the same tender will not be
considered.
4. The bidders are required to fill up all the online annexure/forms. This is intended for transparency
and speedy evaluation of the bids. Instead of simply confirming / attached in bid / refer physical offer,
the Bidder shall fill in the particulars against appropriate place in respect of each line appearing in
each online annexure. Wherever required, bidder shall invariably have to submit supporting authentic
documents in the physical bid.
(In the absence of required details in the online annexure, the purchaser has every right to evaluate
the bids accordingly and bidder cannot raise any objection against any point during evaluation.)
5. Bidders are requested to remain in touch with the website for any amendment/ corrigendum or
extension of due date etc.
6. As per new guideline –It is mandatory to use CBud app.
(1) To do any type of digging only after prior intimation through “Call Before U Dig” App & as per
its term & condition.
(2) To use the App before commencing any type of digging anywhere in the state
Any technical questions, information and clarifications that may be required pertaining to this enquiry
should be referred to SE (TR) Bharuch GETCO reserves the right to reject any OR all tenders
without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer
GETCO, CO, Bharuch
Download Tender Documents in (PDF Format) which consists of:
Part–I: Commercial Terms & Conditions
Part–II: Technical Specifications & GTP’S, Schedule “A” indicating the quantities & items, drawing if
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe”
IMPORTANT:
All the online Annexures and price bid, other tender documents (refer Table-A) must be
submitted/attached through online form only.
1. Bidder has to upload scanned copies of original (Notarized / self-attested copies of original – as
specified in tender document) documents with bid and no physical documents to be submitted
by bidder except Tender fee & EMD.
2. Bidder has to submit the only Tender fee & EMD in physical form in sealed cover superscripted
submitted by RPAD / speed post only. Otherwise the offer will not be considered and no any further
communication in the matter will be entertained on or before due date of submission
Online-payment, payment of Tender Fees & EMD by RTGS/NEFT/on line shall be
encouraged. In case of payment through RTGS/NEFT bidder has to mail following details:
Sr. No Required Details
1 Name & Address of the bidder
2 Bidder GST No
3 Tender No with due date
4 Mode of Transfer
5 Ref. ID with Bank Details
6 Paid Amount
7 Payment against (Tender Fee/ EMD)
Bidder has to provide all above details on the same date of payment so that receipt can be
generated.
GETCO Beneficiary Bank detail is as under:
1 Name of Account Holder Gujarat Energy Transmission Corporation Ltd.
2 Account No.
3 Name of Bank BANK OF BARODA
4 Branch Code DBBHRU
5 Address of Bank Shalimar Complex, Station Road,Bharuch-392002.Gujarat
6 IFSC Code BARB0STABRO
7 PAN No AABCG4029R
8 TAN No BRDG01026E
9 GST No 24AABCG4029R2ZC
1. In case short submission of documents with bid and / or clarification if any required from the bidder,
the required details / documents may be asked from bidder in mail form only.
2. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF from)
remain legible and should not be password protected.
3. All the relevant scanned documents as per requirement of the tender are to be upload through
online only on n procure portal excluding Tender fee & EMD. Physical copies of Tender fee & EMD
payment receipt to be submitted in sealed cover on OR before due date and time. Which is strictly
submitted by RPAD / speed post only, otherwise the offer will not be considered and no any further
communication in the matter will be entertained. (All tender documents including Price bid are not
to be submitted with the physical documents except Tender fee & EMD payment receipt).
4. Tender will be evaluated on Data / Details / Documents of the online offer only.
5. It is mandatory for all the bidders to upload their tender documents by on line (E-tendering) in
scheduled time. No documents shall be considered physically which are mentioned for on-
line submission only.
6. The bidders are required to fill up all the online annexure / forms (word file attached) and shall be
uploaded invariably. This is intended for transparency and speedy evaluation of the bids. Instead of
simply confirming / attached in bid / refer physical offer, the Bidder shall fill in the particulars against
appropriate place in respect of each line appearing in each online annexure. Wherever required,
bidder shall invariably have to upload supporting authentic documents in the online bid. (In the
absence of required details in the online annexure, the purchaser has every right to evaluate the
bids accordingly and bidder cannot raise any objection against any point during evaluation.)
7. Bidders are requested to remain in touch with the web-site for any amendment / corrigendum or
extension of due date etc.
8. No tender shall be accepted / opened in case of receipt after due date and time of tender,
irrespective of delay due to postal services or any other reasons and the Corporation shall not
assume any responsibility for late receipt of tender.
9. The Earnest Money Deposit and tender fee will be accepted by NEFT/RTGS (online form) on any
Nationalized Bank only situated at “VADODARA” drawn in favor of “GUJARAT ENERGY
TRANSMISSION CORPORATION LTD.” EMD and Tender Fee NEFT/RTGS with different
purchaser or agency shall not be accepted. Tender without EMD and tender fee shall be rejected.
Two separate payment receipt for Tender fee and EMD should be submitted with sealed
10. The GETCO reserves the right to award the work to one or more bidders, considering their
technical and financial capacity OR to reject any or all tenders or accept any tender without
assigning any reason thereof.
Any technical questions, information and clarifications that may be required pertaining to this enquiry
should be referred to: The Superintending Engineer (TR), Gujarat Energy Transmission
Corporation Limited, Circle Office, Bharuch
GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer
GETCO, Bharuch
GUJARAT ENERGY TRANSMISSION CORPORATION
TRANSMISSION CIRCLE BHARUCH, GETCO
TENDER SPECIFICATION, FOR
Work of erection of 66KV equipment, Structures, Control
wiring, Yard Lighting, Control-Room, Staff-Quarter
Electrification & Supply of Furniture & CCTV Camera etc
at 66 KV Achhod S/S & associated Line S/S under
construction Division Bharuch
Estimated Cost – Rs.
Tender fee – Rs.
EMD – Rs.
Time limit-120 days
TECHNICAL BID
TENDER NO. TCBRH/26-27/2612
Qualification Requirement
1 Registration: The Bidder shall be registered contractor of GETCO for erection work of
2 Experience for S/S work: Bidder shall have executed as Main contractor minimum 01 No
of 66/11KV or higher voltage class substation with State or Central Transmission Utility or
major industries OR 03 Nos of 66KV or higher voltage class Transformer/Feeder bays at
same or different locations. Substations include minimum 2 Nos. of feeder bays, 1 No. of
Transformer bay. Attested Xerox copy of work orders executed from GETCO and satisfactory
completion certificate (form 3A only) from respective department should be submitted
2 Experience for Line work: Length of transmission line on towers/H frame to be tenderize -
The bidder should have erected transmission line including stringing of conductor and
earthwire of 66kv and above class lines on towers/H frame for length
a) Less than 5 RKM – Minimum 3 RKM line in last 3 financial years
b) Line length above 5 RKM but upto 10 RKM – Minimum quantity shall be equal to the
tender quantity of the line in last 3 financial years.
Experience: as per new HO Circular:-
i) As a main contractor - workorder copy and experience certificate of similar nature work to be
submitted to ascertain experience of line erection work of 66kV and/or above class in GETCO or
other STU or CTU as mentioned in Cl.-2.1 & Cl.-2.2, failing in which bidder shall be evaluated
accordingly by order placing authority as per DOP.
ii) As a sub-contractor – workorder/PO copy of original contract and sub-contract, experience
certificate from main contractor and statement of financial transactions for the same workorder/PO
are to be submitted to ascertain experience of line erection work of 66kV and/or above class in
GETCO or other STU or CTU as mentioned in Cl.-2.1 only, failing in which bidder shall be evaluated
accordingly by order placing authority as per DOP
3. Solvency: Latest bank solvency certificate from any Bank of a sum of minimum 20 % of the
estimated cost shown in the tender.
Bidder's Minimum Average Annual Turnover (MAAT)^ for best three years out of last five
financial years as annualized shall not be less than the estimated amount of this tender.
^Note- “Annual gross revenue from operations / gross operating income as incorporated in the profit
& loss account excluding other operative income/other income”.
1. Last quarter’s Liquid Assets should not be less than 20 % of estimated amount as on date of
invitation of tender.
Note: For the purpose of arriving at LA Current Assets Less Inventories shall be considered.
1. Bidder’s Net Worth for Last 3 financial years should be positive.
1. Audited, Verified and Certified Practicing Chartered Accountant certificate will be considered for
Minimum Average Annual Turnover, Liquid Assets and Net worth. The provisional certificates will not
be entertained.
2. Under taking in respect of reference to NCLT under Insolvency & Bankruptcy Code. The
undertaking is to be furnished by the bidder in its bid as per the format attached and shall be deemed
to be part of the bidding schedule and submitted along with QR Bid
4 Provident Fund Code: Separate provident fund code number towards firm registered with
Regional P. F. Commissioner.
5 Profit & Loss Account Statement: The Bidder should submit certified Xerox audited copy of
Balance sheet with profit and loss account & IT return of last three Financial Years.
6 Nature of Firm: Attested copy of Partnership Deed, Power of Attorney, if any, for signing
the bid documents in case of partnership firm & self-affidavit for proprietorship firm. All
such documents shall have to be NOTARISED
7. GST Registration: The Bidder shall be registered under the GST Act and a certified copy of
such registration under the GST act indicating the GSTIN shall have to be submitted along
with the bid by the bidder.
8. I.T. PAN CARD: The bidder should submit the attested zerox copy of PAN Card of their firm.
9. Bidder shall have valid electrical contract license & approved vender of
GETCO/STU/CTU, registered under GST Act & should have CPF/PF registration
certificate.
10. All documents submitted by bidder must be self-attested.
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Bharuch
CHECK LIST OF DOCUMENTS SUBMISSION
Mandatory to upload on-line only (pdf file)
No. Particulars
1 Scan copy of online payment receipt of Tender fee & EMD
All Pages of Technical Bid with Bidder Signature and Rubber Stamp
(encouraged for digitally signed)
3 Registration document as Approved Contractor in Appropriate Class
Work completion certificate in Form No.3A (Experience Certificate as main
contractor) only as Per Qualification Requirement
5 Bank Solvency Certificate
6 Provident Fund Code Number Documents
7 GST Registration Number Documents
Income Tax Return, Profit Loss Accounts and Balance sheet of Last Three
Financial Years
9 Nature of Firm:
Partnership deed/Latest Form-G/ POA/Authorized Signatory Certificate for
Partnership
Self-Affidavit/POA/Authorized Signatory Certificate for Proprietorship
10 PAN Number Document
11 Filling all Annexure
Mandatory to attach in Physical bid
No. Particulars
1 Receipt of payment of EMD paid online Not
2 Receipt of payment of tender fee paid online required
E-TENDER FOR THE WORK OF
Work of erection of 66KV equipment, Structures, Control wiring, Yard Lighting, Control-Room,
Staff-Quarter Electrification & Supply of Furniture etc at 66 kV Achhod S/S & associated Line S/S
under construction Division Bharuch
Instructions to Bidders
General Conditions of Contract
Erection Conditions of Contract
Special Conditions of Contract
Technical particulars
Forms & Appendices to be filled in by the bidders.
PART – I
GENERAL TERMS & CONDITIONS WITH COMMERCIAL BID
INSTRUCTIONS TO BIDDERS
A. INTRODUCTION
1.0 General Particulars
1.1 The Gujarat Energy Transmission Corporation Ltd., Bharuch hereinafter called ‘GETCO’/ ‘OWNER’
intends to receive bids for Work of erection of 66KV equipment, Structures, Control wiring, Yard
Lighting, Control-Room, Staff-Quarter Electrification & Supply of Furniture etc at 66 kV Achhod
S/S & associated Line SS under construction Division Bharuch as detailed in the accompanying
specifications in accordance with Terms and Conditions herein. The bids shall be prepared and furnished as
per these Instructions.
2.0 Qualification Requirements of Bidders
2.1 To be qualified for award, the bidder shall provide following satisfactory evidence to the Owner of his
capability and adequacy of resources:
a) He is a qualified and registered contractor who is regularly executing jobs of Work of erection of
66KV equipment, Structures, Control wiring, Yard Lighting, Control-Room, Staff-
Quarter Electrification & Supply of Furniture etc at 66 KV Achhod S/S & associated Line
SS under construction Division Bharuch including all works in the scope of the tender
specification and has adequate technical knowledge and practical experience (the Bidder shall
submit documents defining legal status, registration and principal place of business; written power
of attorney of the signatory of the bid to commit the bidder, performance record as contractor for
erection of equipments in the last three years and details of works on hand in the past three years
& contracts on hand.
b) He has adequate financial capability and stability to meet the financial obligations arising out of the
scope of works.
c) In addition, the Qualifying Requirements if any, in the ‘Special Conditions of Contracts ‘shall also
be applicable.
d) The registration with P.F. authority and labor license as per GETCO norms is mandatory
2.2 The above cited requirements are only indicative. The owner reserves the right to requisition any other
relevant information and also reserves the right to reject the Bid proposal of any Bidder, if in the
Owner’s opinion the Qualification data is incomplete and Bidder is not qualified to perform the Contract
satisfactorily.
3.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid
discussions/presentations) shall be fully borne by the Bidder. Owner will not be responsible/liable for
these costs irrespective of the course and conclusion of this Bidding.
B. BID DOCUMENTS
4.0 Details of Documents
4.1 The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part I)
c. Erection Conditions of Contract (ECC-Part I)
d. Special Conditions of Contract (SCC-Part I)
e. Technical Specifications (TSP-Part IIA)
f. Technical Data Sheets (TDS-Part IIB)
g. Bid Form and Price Schedules (BF/PS-Part III)
5.0 Knowing the Bid Document
5.1 Every intending Bidder is to examine and understand all instructions, forms, terms, conditions and
specifications in the Bid Documents and fully know himself all the conditions and contents therein,
which may in any manner, affect the scope & content of work and the costs thereof. Submission of a
Bid not substantially responsive to the Bid Document in all respects and/or failure to furnish all
information required by the Bid Document may entail rejection of the Bid at the Bidder’s risk.
6.0 Clarifications on Bid Documents
6.1 In case an intending Bidder finds any discrepancy or omission in the documents and specifications or
is in doubt as to the true meaning of any part, he shall make a request, in writing not later than the date
of pre Bid discussion, to the owner in triplicate. The owner will issue explanations, interpretations and
clarifications as deemed fit in writing as a response to this request. On receipt of such
interpretations/clarifications, the Bidder may submit his Bid within the date and time stipulated in the
Bid invitation, all such explanations, interpretations and clarifications from the Owner shall be deemed
as part of Bid Documents and shall invariably accompany the Bidder’s proposal.
6.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s) or his
representative(s) will not in any way be binding on the Owner.
7.0 Amendment of bidding document
7.1 At any time prior to the deadline for submission of Bids the Owner may, for any reason, whether at his
own initiative or in response to a clarification requested by the intending Bidder, modify the Bidding
Document with amendment(s).
7.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who have received
the Bidding Document at the address contained in the letter of request for issue of bidding document
from the Bidders. Owner will bear no responsibility or liability arising out of non-receipt of the same in
time or otherwise.
7.3 In order to afford prospective bidders reasonable time in which to take the amendment into account in
preparing their bids, the Owner may, at his discretion, extend the deadline for the submission of bids.
7.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due consideration
by the Bidders while they submit their bids and shall invariably enclose such documents as a part of
C. PREPARATION OF BIDS
8.0 Language of Bids
8.1 The Bid prepared by the Bidder and all correspondence and documents relating to the Bid, exchanged
by the Bidder and the Owner, shall be written in the English language, provided that any printed
literature furnished by the Bidder may be written in another language so long as accompanied by an
English translation of its pertinent passages. Failure to comply with this may disqualify a bid. For
purposes of interpretation of the bid, the English translation shall govern.
8.2 Bid Format
Bidders have to make the Bid in the formats furnished with this Document. Verbatim without adding
any printed/typewritten text of their own.
9.0 Local Conditions:
9.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors, which may
have any effect on the execution of the Contract covered under these documents and specifications.
The Owner shall not entertain any request for clarifications from the bidders, regarding such local
conditions.
9.2 It must be understood and agreed that such factors have properly been investigated and considered
while submitting the proposals. No claim for financial adjustment to the Contract awarded under these
specifications and documents will be entertained by the owner. Neither any change in the time
which are based on the lack of such clear information or its effect on the cost of the works to the
10.0 Documents comprising the Bid:
10.1 The Bidder shall complete the Bid form inclusive of Price Schedules; Technical Data Requirements etc.
furnished in the Bidding Documents, indicating, for the services to be rendered, a brief description of
services, quantity and price.
10.2 The Bidder shall also submit documentary evidence to establish that the Bidder meets the Qualification
Requirements as detailed in Clause 2.0 above and Special Conditions of Contract (including Clause
10.3 All Tender Documents/ formats are to be returned completed and filled in all respects and signed by
wherever the Company Authorized Signatory specified.
10.3 The Bid Guarantee shall be furnished in a separate cover in accordance with clause specific ITB.
11.0 Scope of the proposal
11.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely covering
all the equipment erection and other installation services specified under the accompanying Technical
Specifications. It will include among others as specified therein the following: -
a) Receipt of equipments and material from GETCO Haldarwa / Bharuch Transmission/ Construction
store and transportation, storage, preservation and conservation of equipment at the Site.
b) Pre-assembly, if any, erection, testing and commissioning of all the equipments.
c) Reliability tests and performance and guarantee tests on completion of commissioning.
11.2 As specified in the Special Conditions of Contract, no deviation whatsoever to certain conditions of the
bidding documents permitted by the Owner and therefore, the Bidders are advised that while making
Bid Proposals and quoting prices these conditions may appropriately be taken into consideration.
Bidders are required to furnish a certificate in this regard as per the format provided in Special
Conditions of Contract in a separate sealed envelope containing Bid security, which shall accompany
the Technical Bid. Any Bid not accompanied by such certificate shall be rejected by the Owner and
shall not be opened.
11.3 Bids not covering the above cited entire scope of works may be treated as incomplete and hence
11.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, Technical Data
Sheets and specified elsewhere. The Qualifying Data should be filled in the required schedule of Bid
Proposal Sheets.
12.0 Bid Price:
12.1 The Bidder shall indicate percentage above/below of total bid price indicated in the appropriate price
schedules, enclosed in bid proposal sheets for erection, and other services it proposes to furnish under
the contract. The %(Percentage) above/below indicated shall be inclusive of GST applicable on
required inputs and services.
12.2 The Bidder shall specifically note that the Tenders are invited on percentage rate increase/decrease
based in relation to unit rates of tender price schedule.
12.3 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of withdrawal/cessation of
the Supplier from Composition scheme during the tenure of the contract, the rate (i.e. price) mentioned
in the price bid shall be final and any additional GST will have to be borne by the tenderer himself. In
no case additional amount towards GST or otherwise will be paid / reimbursed to supplier/contractor.
Further Statutory Variation clause will not be applicable in case of Supplier /Contractor has opted for
Composition Scheme under GST.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as
applicable for each item of Goods/Service. If not specifically mentioned, then COMPANY will have the
option to take the prices as exclusive of taxes and duties at maximum higher slab rates for the
evaluation of the tenders.
The offered prices to be indicated in online mode of tender in the format given (i.e. Schedule-B). The
price bid submitted in physical mode shall not be considered.
Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the bidder intends to
supply the goods / services, meaning thereby the bidder has to supply the goods / services from the
relevant declared / registered place of supply only.
13.0 Price Basis:
13.1 The Price shall be quoted on firm basis.
13.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of the contract and
shall not be subject to variation on any account saving for change in quantity. A bid submitted with an
adjustable price quotation shall be treated as non-responsive and rejected.
14.0 Taxes and Duties: -
14.1 As regards the income Tax, surcharge on income tax and any other tax excluding GST & welfare
cess at prevailing rate, the owner shall not bear any tax liability whatsoever. The bidder shall be liable
and responsible for payment of such taxes as attracted under the provisions of the law.
14.2 Notwithstanding the tax liabilities as per the sub-clause 14.1 above the owner shall have the right to
make deduction at source from the amounts payable to the contractor in respect of Income Tax (on the
cost of items of supply included in the works contract) as may be mandatory in terms of the law. The
owner shall not bear any liability in this regard but shall issue necessary certificate in respect of such
deduction made.
14.3 In case any tax or duty is newly introduced by the Government applicable for this contract with effect
from the next day of the date submission of the bid and if the contractor is required to pay additional
tax or duty, then the owner shall reimburse the contractor the additional tax or duty so paid by the
contractor against submission by the contractor of documentary evidence to the satisfaction of the
owner. This provision will not be applicable to transaction between the contractor and his sub-
contractors. Besides the said statutory variation, no other statutory variation shall be payable by the
14.4 The owner’s liability for all taxes and duties under the contract shall be limited to those indicated by the
Bidder in the Bid Proposal Sheets, subject to the statutory variations and variations as per Clause No.
If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or reduced by
reasons of the making, passing or promulgation of any law after the date of submission of bid or by any
order, regulation or bye-law having the force of law the amount of such increase or reduction shall be
added to or deducted from the “Contract Price” as the case may be for direct transactions between
contractor & owner, and not for bought out items. It is the Bidders responsibility to furnish details of
taxes, duties, levies etc. applicable as on the date of submission of the bid.
14.5 No claim for any increase towards the statutory variation regarding enhancement of existing tax or duty
or introduction of a new tax or duty applicable shall be entertained by the Owner during the extended
period of contract, if any, provided the extension of the contract is required by causes attributable to
the contractor.
14.6 The provision of statutory variation regarding enhancement of existing tax or duty or introduction of a
new tax or duty will be applicable only to the direct transaction between the contractor and the owner.
14.7 Before quoting, the bidder may ascertain from the concerned tax authorities of Government of Gujarat
the applicability of Tax (GST) etc in respect of this work and include the same in the quoted price. No
separate claim in this regard will be entertained by the Owner, as it is the responsibility of the Bidder to
pay all these taxes.
14.8 In addition, the conditions detailed under Special Conditions of Contract shall apply.
15.0 Time Schedule:
15.1 The basic consideration and the essence of the contract shall be strict adherence to the time schedule
for performing the specified works.
15.2 The Owner’s requirements of completion schedule for the Works are mentioned in the accompanying
Special Conditions of Contract.
15.3 The completion schedule as stated in the special conditions of contract shall be one of the major
factors in consideration of the bids.
16.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in Clauses titled
Insurance, in General Terms and Conditions of Contract and in Erection Conditions of this Part-I.
Bidder’s attention is specifically invited to these clauses. Bid price shall include all the costs in fulfilling
all the insurance liabilities under the Contract.
17.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special equipment tools
& tackles etc. which he proposes to bring to site for the purpose of erection, handling, testing and
commissioning including performance and guarantee tests of the equipment. If any such equipment is
listed anywhere else in the proposal and not specially mentioned in the above schedule, it shall be
deemed to have been included in the Bidder’s proposed scope of supply.
18.0 Bid Security/EMD:
18.1: The bidder shall furnish, as a part of its bid EMD, bid security for an amount of one percent of estimated
cost plus GST to be paid as under:
a) In the form of crossed DD drawn in favor of Gujarat Energy Transmission Corporation Limited
payable at Bharuch. Not accepted in Cash.
18.2 The bid security is required to protect the owner against the risk of Bidder’s conduct, which would
warrant the guarantee forfeiture, pursuant to relevant paras elsewhere The bid guarantee shall be
made payable to the Owner without any condition whatsoever.
18.3 The Owner will reject any bid not secured in accordance with Para 18.1 above, as non-responsive. No
exemptions are made in the furnishing of the security.
18.4 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or three
months from the date of submission of tender whichever is later.
18.5 The successful bidders, Bid Security will be discharged upon, furnishing the contract performance
18.6 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid
b) If a bidder refuses to accept the contract or fails to commence the works (including supplies
within thirty days of letter of award of contract)
19.0 Format of Bid:
19.1 The Bidder shall submit bid in hard copy duly signed on each page.
19.2 All copies of the bid shall be typed or written in indelible ink and shall be signed by the Bidder on each
page or a person or persons duly authorized by the Bidder to sign the Contract. The letter of
authorization shall be indicated by written power-of-attorney accompanying the bid. All pages of the
bid, except for un-amended printed literature, shall be initiated by the person or persons signing the
19.3 The Bidders must submit the qualifying data as required in Instructions to Bidders in separate envelope
sealed and enclosed in the envelope submitting proposals, super scribed as under:
Work of erection of 66KV equipment, Structures, Control wiring, Yard Lighting, Control-Room,
Staff-Quarter Electrification & Supply of Furniture etc at 66 kV Achhod S/S & associated
Line S/S under construction Division Bharuch
19.4 The online bid shall contain no interlineations, erasures or overwriting except as necessary to correct
errors made by the Bidder, in which case such corrections shall be initiated by the person or persons
signing the bid.
19.5 Bids shall be submitted as under:
Cover-I Not require (to be submitted through online form only)
Cover-II Not require (to be submitted through online form only)
Cover-III Not require (to be submitted through online form only)
(Cover I, II and III will be collectively called Technical Bid)
The price bid is not to be submitted with the physical documents.
21.0 Contract Quality assurance:
21.1 The Bidder shall include in his proposal the Quality Assurance Programme containing the overall
quality management and procedures which he proposes to follow in the performance of the Works
during various phases as detailed in relevant clause of the General Technical Conditions.
21.2 At the time of Award of Contract, the detailed Quality Assurance Programme to be followed for the
execution of the Contract will be mutually discussed and agreed and such agreed Programme shall
form a part of the Contract.
21.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items are being
supplied wherever specifically indicated in the tender document shall supply only from those vendors.
Such details shall be accompanied by their list of previous supplies made performance reports etc.
However, in case of orders are placed, specific approval shall be obtained from the owner for the
vendor-supplied materials.
22.0 Signature of Bids:
22.1 The bid must contain the name, residence and place of business of the person or persons making the
bid and must be signed and sealed by the Bidder with his usual signature. The names of all persons
signing should also be typed or printed below the signature.
22.2 Bid by a partnership must be furnished with full names of all partners and be signed with the
partnership name; followed by the signature(s) and designation(s) or the authorized partner(s) or other
authorized representative(s).
22.3 Bids by Corporation/Company must be signed with the legal name of the Corporation/Company by the
President/Managing Director or by the Secretary or other person or persons authorized to bid on behalf
of such Corporation/Company in the matter.
22.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’, ‘Secretary’,
‘Agent’ or other designation without disclosing his Principal will be rejected.
22.5 If it is found that two or more persons who are connected with one another either financially or as a
principal and agent have bid under different names without disclosing their connection then such bids
will be liable for rejection. Satisfactory evidence of authority of the person signing on behalf of the
Bidder shall be furnished with the bid.
22.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
22.7 Bids not conforming to the above requirements of signing may be disqualified and EMD forfeited.
23.0 The original Bid and accompanying documents shall be submitted by the Bidder at the date, time and
place specified.
The Bid shall be submitted by online mode only at tender.nprocure.com no any RPAD or speed post
services accepted by the SE (TR) GETCO Bharuch. The Bids received after the Due Date and Time of
opening are liable to be rejected. Telegraphic/Telex/Fax/e-mail Bids shall not be entertained.
23.2 The Bidders shall seal the copy of the bid in an inner and an outer envelope.
23.3 a. Addressed to the Owner at the following address:
The Superintending Engineer (TR),
GETCO, Transmission Circle,
P. O. Maktampur, Bharuch-
b. Bear the name of package bid enquiry number, name of the work and the words. “DO NOT OPEN
BEFORE …….
24.0 Deadline for submission of bids:
24.1 The Owner may, at its discretion, extend this deadline for the submission of bids by amending the
Bidding Document in which case all rights and obligations on the Owner and Bidders previously
subject to the deadline will thereafter be subject to the deadline as extended.
25.0 Late Bids
25.1 Any bid received by the Owner after the time and date fixed or extended for submission of bids
prescribed by the Owner, will be rejected and not considered for evaluation.
26.0 Modification and withdrawal of bids:
26.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written notice of the
modification or withdrawal is received by the Owner prior to the deadline prescribed for submission of
26.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked and dispatched in
accordance with the provisions of clause 23.0. The envelope should clearly indicate that the
modification is for the Technical bid. No bid modifications notice by Telex/Grams/Fax shall be
entertained by the Owner.
26.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for submission of bids.
26.4 No bid may be withdrawn in the interval between the deadline for submission of bids and the expiration
of the period of bid validity specified by the Bidder on the Bid Form. Withdrawal/modification of a bid
during this interval may result in the Bidder’s forfeiture of its bid security.
E. BID OPENING AND EVALUATION
27.0 Opening of bids by owner:
27.1 The Owner will open the technical bids in the presence of Bidder’s representatives who choose to
attend on the date and time mentioned for opening of bids in the Invitation to Bid or in case any
extension has been given thereto, on the extended bid opening date and time notified to all the Bidders
who have purchased the bidding document. The Bidder’s representatives who are present shall sign a
register evidencing their attendance.
27.2 The Bidder’s names, Technical modifications, Bid withdrawal and such other details as the Owner, at
his discretion may consider appropriate, will be announced in the Technical Bid Opening.
27.3 The price bids (On line) of all the “Techno-Commercial” Responsive Bidders shall be opened in the
presence of representatives (up to two per firm) of such bidders who choose to be present. The date &
time of opening the Price Bid shall be intimated to all such qualified bidders by Fax/Telex, at least one
week in advance besides inviting final price bid if found appropriate after evaluation of Technical bids.
27.4 The Bidder’s name, lumpsum Bid Price, all discounts if any, modifications in the Price Bid and any
such other details as the Owner, at his discretion, may consider appropriate, will be announced/
furnished in the Price Bid (On line) Opening.
27.5 No electronic recording/transmitting devices will be permitted during Bid opening.
28.0 Purpose of evaluation of bids:
28.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the technical
responsiveness of the bid for the complete scope of the proposal, as covered under these
specifications and documents. All technically responsive bids shall then be examined to determine the
LOWEST EVALUATED COMMERCIALLY AND TECHNICALLY RESPONSIVE BIDS.
29.0 Policy for bids under consideration:
29.1 Bids shall be deemed to be under consideration immediately after opening of Technical Bid and until
such time official intimation of award/rejection is made by the Owner to the Bidders. While the Bids are
under consideration, Bidders and/or their representatives and other interested parties are advised to
refrain from contacting by any means, the owner and/or his employees/representatives on the matters
related to Bids under consideration.
29.2 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own ask the
Bidder for a clarification of its bid. The request for clarification and the response shall be in writing and
no change in the price or substance of the bid shall be sought, offered or permitted.
30.0 Preliminary Examination:
30.1 The Owner will examine the bids to determine whether they are complete, whether any computational
errors have been made, whether required sureties have been furnished, whether the documents have
been properly signed, and whether the bids are generally in order.
30.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by multiplying the
unit price and quantity, the unit price shall prevail and the total price shall be corrected. If there is a
discrepancy between the total bid amount and the sum of total costs, the latter shall prevail and the
total bid amount will be corrected accordingly. If there is a discrepancy between words and figures, the
amount advantageous to the Owner will prevail. If the Bidder does not accept the correction of the
errors as above, his Bid will be rejected and the amount of Bid Security will be forfeited. The Bidder
should ensure that the prices furnished in various price schedules are consistent with each other. In
the case of any inconsistency in the prices furnished in the specified prices schedules to be identified
in Bid Form for this purpose, the Owner shall be entitled to consider the highest price for the purpose
of evaluation and for the purpose of award of Contract use the lowest of the prices in these schedules.
30.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness of each bid to
the Bidding Document. For purpose of these Clauses, a substantially responsive bid is one, which
conforms to all the terms and conditions of the Bidding Document without material deviations. A
material deviation is one which affects in any way the prices, quality, quantity or delivery period of the
equipment, completion of works or which limits in any way the responsibilities or liabilities of the Bidder
of any right of the Owner as required in these specifications and documents. The Owner’s
determination of a bid’s responsiveness shall be based on the contents of the bid itself without
recourse to extrinsic evidence.
30.4 A bid determined as not substantially responsive will be rejected by the Owner and may not
subsequently be made responsive by the Bidder by correction of non-conformity.
30.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid which does not
attribute to material deviation, provided such waiver does not prejudice or affect the relative ranking of
any Bidder.
31.0 Evaluation of Price Bids:
31.1 Definitions and Meanings:
For the purpose of the evaluation and comparison of bids, the following meanings and definition will
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the complete scope of
31.2 Calculation of differential Price & Cost Compensation for Deviations.
The Differential Price to be added to the Bid Price of each bid during evaluation and comparison shall
be derived as under:
Differential Price (DP)=n1F1+n2F2….+nnFn, where F1, F2…..Fn are the various factors in Indian
Rupees per unit of parameter differential or deficiency in the equipment and services offered as
stipulated in these specifications: n1, n2…nn are the respective parameter differential or deficiency in
the corresponding units to be determined from the Bidder’s proposal. The above factors and
corresponding units of parameter differential are derived from the Technical Specifications, Data
sheets and/or Special Conditions of Contract.
Deviations from the Bidding Documents in so far as practicable will be converted to a Rupee value (D)
and from the Bidding Document while evaluating the bids. In determining the Rupee value of the
deviations the Owner will use parameters consistent with those specified in the specifications and
documents and or other information as necessary and available to the Owner.
31.3 Comparison of Bids
The bids shall be compared on the basis of lump sum prices (i.e., for erection services to be rendered
as quoted by the Bidder) for the entire scope of the proposal as defined in the Bidding Document.
For comparison purposes all the evaluated bid prices shall be in Indian Rupees as under:
W = Q + DP + D, Where
W = Total Comparison Price
Q = Bid Price quoted by the bidder in Indian Rupees (Value Of erection cost including other
components if any.)
DP = Different price in Indian Rupees calculated as above
D = Cost compensation for deviations calculated as above.
All evaluated bid prices of all the bidders shall be compared among themselves to determine the lowest
AWARD OF CONTRACT
32.0 Award Criteria
32.1 The owner will award the contract to the successful Bidder, whose bid has been determined to be
substantially responsive and has been determined as the lowest evaluated bid, providing further that
the Bidder is determined to be qualified to perform the contract satisfactorily. The Owner shall be the
sole judge in this regard.
32.2 Further, the Owner reserves the right to award separate contracts to two or more parties in line with the
terms and conditions specified in the accompanying Technical Specifications.
33.0 Owner’s right to accept any bid and to reject any or all bids:
33.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding process and reject
all bids at time prior to award of contract, any without thereby incurring any liability to the affected
Bidder or Bidders or any obligation to inform the affected Bidder or Bidders of the grounds for the
Owner’s action.
34.0 Notification of award:
34.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the Owner will
notify the successful Bidder in writing by registered letter or e mail or FAX, to be confirmed in writing by
registered letter, that his bid has been accepted.
34.2 The notification of award will attribute the formation of the Contract.
34.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant clause 38 .0,
the Owner will promptly notify each unsuccessful Bidder and will discharge his bid security, pursuant to
Clause 20.0.
35.0 Signing of contract:
35.1 At the same time as the Owner notifies the successful Bidder that his bid has been accepted, the
Owner will send the Bidder the detailed of Award, incorporating all agreements between the parties.
35.2 Within 7 days of receipt of the detailed of Award, the successful bidder shall sign the same with date
and return it to the Owner.
35.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the same will be
signed within 15 (Fifteen) days of notification of Award.
35.4 The contractor will have to give indemnity bond for material on Non-judicial Stamp paper of value Rs.
300/- to GETCO as per attached format. The cost of stamp paper will be borne by the contractor.
35.5 The contractor will have to give safety cum indemnity bond on Non-Judicial Stamp paper of value Rs.
300/- to GETCO against any possible claim of compensation for damage to contractor’s staff or any of
third party during the execution of work. The cost of stamp paper will be borne by the contractor.
35.6 Also the successful bidder will have to execute Agreement on stamp paper of value Rs.300/- at our
Transmission Circle, GETCO, Bharuch before commencement of works as per GETCO’s prescribed
Proforma .The cost of stamp paper will be borne by the contractor.
36.0 Contract Performance Guarantee:
36.1 As a contract performance security, the successful bidder, to whom the work is awarded, shall be
required to furnish a performance guarantee in form of Bank guarantee from a Public Sector Indian
bank/Scheduled, Commercial Bank in the form to be furnished. The guarantee amount shall be equal
to ten percent (10%) of the Contract price and it shall guarantee the faithful performance of the
Contract in accordance with the terms and conditions specified in these documents and specifications.
The guarantee shall be valid up to 90 days after the end of Warranty Period.
36.2 The Performance Guarantee shall cover additionally the following guarantees to the Owner:
a) The successful Bidder guarantees the successful and satisfactory operation of the equipment
furnished and erected under the Contract, as per the specifications and documents.
b) The successful Bidder further guarantees that the equipment provided by him/his sub-vendors and
installed by him shall be free from all defects in design, material and workmanship and shall upon
written notice from the Owner fully remedy free of expenses to the Owner such defects as
developed under the normal use of the said equipment within the period of guarantee specified in
the relevant clause of the General Terms and Conditions in the Part-I/Special Conditions of
36.3 The Contract Performance Guarantee is intended to secure the performance of the entire contract.
However, it is not to be trued as limiting the damages under clause entitled “Equipment Performance
Guarantee” in Technical Specifications, Part-II and damages stipulated in other clauses in the Bid
documents.
36.4 The performance guarantee will be discharged without any interest at the end of guarantee period,
unless otherwise specified in Special Conditions of Contract.
GENERAL TERMS & CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor as per the
Contract Agreement signed by the parties, including all attachments and appendices thereto and all
documents incorporated by reference therein.
1.2 ‘Owner’ shall mean the Superintending Engineer (TR.) CIRCLE GETCO, Bharuch or any of its
subsidiaries and shall include its legal representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the Works and
shall include such successful Bidder’s legal representatives, successors and permitted assigns.
1.4 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from time to time
for the purpose of the Contract.
1.5 The terms ‘Equipment’, ‘Stores’ and ‘Materials’ shall mean and include equipment, stores and
materials to be provided by the Contractor under the Contract.
1.6 ‘Works’ shall mean and include the furnishing of equipment, labour and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation including all
transportation, handling, unloading and storage at the Site as defined in the Contract.
1.7 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the Contract and
such other schedules and drawings as may be mutually agreed upon.
1.8 Site’ shall mean and include the land and other places on, into or through which the works and the
related facilities are to be erected or installed and any adjacent land, paths, street or reservoir which
may be allocated or used by the Owner or Contractor in the performance of the Contract.
1.9 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in his bid with
additions and/or deletions as may be agreed and incorporated in the Letter of Award and the contract
agreement for the entire scope of the works.
1.10 The term ‘Erection Portion’ of the Contract price shall mean the value of field activities of the works
including erection, testing and putting into satisfactory operation including successful completion of
performance and guarantee tests to be performed at Site by the Contractor including cost of
insurances.
1.11 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated by the time to
inspect the equipment; stores or Works under the Contract and/or the duly authorized representative of
the Owner.
1.12 ‘Notice of Award of Contract’/’Letter of Award’ shall mean the official notice issued by the Owner
notifying the Contractor that his bid has been accepted.
1.13 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.14 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued by the
respective sub division deputy engineer.
1.15 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly defined shall
mean calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.16 Writing’ shall include any manuscript, type written or printed statement, under or over signature and/or
seal as the case may be.
1.20 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’, ‘Requested’, ‘As
Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’, ‘Permitted’, or words and
phrases of like importance are used the approval, judgment, direction etc. is understood to be a
function of the Owner/Engineer.
1.17 Test on completion shall mean such tests as prescribed in the Contract to be performed by the
Contractor before the work is taken over by the Owner.
1.18 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to determine
and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract
Documents.
1.19 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of the Works
performed under the Contract, after successful commissioning/completion of Performance and
Guarantee Tests, as specified in the accompanying Technical Specifications or otherwise agreed in
the Contract.
1.20 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man- ship which
cannot be detected during inspection, testing etc, based on the technology available for carrying out
such tests.
1.21 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any :
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the subject matter
of the Contract.
1.22 Words imparting the singular only shall also include the plural and vice –versa where the context so
1.23 Words imparting ‘Person’ shall include firms, companies, corporations and associations or bodies of
individuals, whether incorporated or not.
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not super ceded by provisions in other
parts of the Contract.
3.0 CONTRACT DOCUMENTS
3.1 The term Contract Documents shall mean and include the following which shall be deemed to form an
integral part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to Bidders,
General Terms and Conditions of Contract, the Special Conditions of Contract. and all other
documents included under Part-I, Part-II and Part-III.
b) Specifications of the erection of the equipments and other technical services to be provided
under the Contract as brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of
clarifications thereto between the Contractor and the Owner prior to the Award of Contract
except to the extent of repugnancy.
d) Letter of Award and any agreed variations of the conditions of the documents and special terms
and conditions of Contract, if any.
3.2 In the event of any conflict between the above mentioned documents the matter shall be referred to the
Engineer whose decision shall be considered as final and binding upon the parties.
4.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
4.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract, or any
provision thereof, or any specification, plan, drawing, pattern, sample or information furnished by or on
behalf of the Owner in connection therewith, to any person other than a person employed by the
Contractor in the performance of the Contract. Disclosure to any such employed person shall be made
in confidence and shall extend only so far as may be necessary for the purpose of such performance.
4.2 The Contractor shall not, without the Owner’s prior written consent, make use of any document or
information enumerated in various Contract documents except for the purpose of performing the
4.3 The Contractor shall not communicate or use in advertising, publicity, sales releases or in any other
medium, photographs or other reproduction of the Works under this Contract, or descriptions of the
site, dimensions, quantity, quality or other information, concerning the works unless prior written
permission has been obtained from the Owner.
4.4 Any document, other than the Contract itself, enumerated in various Contract documents shall remain
the property of the Owner and shall be returned (in all copies) to the Owner on completion of the
Contractor’s performance under the Contract if so required by the Owner.
5.0 TRANSMISSION OF THE CONTRACT
5.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered into will
be treated as a single Contract. Award shall be placed on the successful Bidder as follows:
For providing services like inland transportation, insurance for delivery at site, unloading, storage,
handling at site, installation, testing and commissioning including performance testing in respect of all
the equipment material equipment/materials given by the owner after observing standard store
procedures for transport from owner’s stores, insurance, unloading storage handling at site installation
testing & commissioning.
5.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor for
executing, then the Contractor shall at the time of taking delivery of the equipment/dispatch documents
be required to execute an Indemnity Bond in favour of the Owner in the form acceptable to the
Superintending Engineer (TR.) GETCO Bharuch for keeping the equipment in safe custody and to
utilize the same exclusively for the purpose of the said Contract. Samples of proforma for the Indemnity
Bond will be furnished during award of Contract.
5.3 The Contract shall in all respects be trued and governed according to Indian Laws.
5.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into various
components only for the convenience of payment under the Contract(s) and for the measurement of
deviations or modifications under the Contract(s).
6.0 JURISDICTION OF CONTRACT
6.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of Bharuch shall
have exclusive jurisdiction in all matters arising under this Contract.
7.0 EXECUTION OF CONTRACT:
7.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy of the final
agreement to the Contractor for his scrutiny and approval.
7.2 The Agreement, unless otherwise agreed to, shall be signed within 15 days of the acceptance of the
Letter of Award, at the office the Owner at Bharuch on a date and time to be mutually agreed. The
Contractor shall provide for signing of the Contract, Performance Guarantee, appropriate power of
attorney and other requisite materials. In case the Contract is to be signed beyond the stipulated time,
the Bid Guarantee submitted with the Proposal will have to be extended accordingly.
7.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided with one
signed original and the rest will be retained by the Owner.
7.4 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the Owner with
copies of agreement within fifteen (15) days after the signing of the Contractor.
8.0 ENFORCEMENT OF TERMS
8.1 The failure of either party to enforce at any time any of the provisions of this Contract or any rights in
respect thereto or to exercise any option therein provided, shall in no way be trued to be a waiver of
such provisions, rights or options or in anyway to affect the validity of the Contract. The exercise by
either party of any of its rights herein shall not preclude or prejudice either party from exercising the
same or any other right it may have under the Contract.
9.0 COMPLETION OF CONTRACT
9.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract shall be
deemed to have been completed on the expiry of the guarantee period as provided for under the
clause entitled ‘Guarantee’ in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
11.0 TIME – THE ESSENCE OF CONTRACT
11.1 The time and the date of completion of the Contract as stipulated in the Contract by the Owner without
or with modifications, if any, and so incorporated in the Letter of Award, shall be deemed to be the
essence of the Contract. The Contractor shall so organize his resources and perform his work as to
complete it not later than the date agreed to.
11.2 The Contractor shall submit a detailed bar chart within the time frame agreed consisting of adequate
number of activities covering various key phases of the work such as design, procurement,
manufacturing, shipment and field erection activities within seven (7) days of the date of LOI.
11.3 The above bar chart shall be compatible with the Owner’s computer environment and furnished to the
Owner on such media as may be desired by the Owner.
12.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the commencement given
by the respective Transmission sub division unless otherwise provided in LOI.
13.0 PENALTY FOR DELAY
13.1 If the Contractor fails to successfully complete the commissioning within the time fixed under the
Contract, the Contractor shall pay to the Owner as penalty a sum specified for each specified period of
delay. The details of such penalty are brought out in the accompanying Special Conditions of Contract
13.2 The total amount of penalty for delay under the Contract will be subject to a maximum of 10% of the
13.2 The total amount of penalty for delay under the Contract will be subject to a maximum of 10% of the
Contract prices plus GST detailed in the Special Conditions of Contract (SCC).
14.0 GUARANTEE
14.1 In the event of any emergency where in the judgment of the Engineer, delay would cause serious loss
or damages, repairs or adjustment may be made by the Engineer or a third party chosen by the
Engineer without advance notice to the Contractor and the cost of such work shall be paid by the
Contractor. In the event such action is taken by the Engineer, the Contractor will be notified promptly
and he shall assist wherever possible in making necessary corrections. This shall not relieve the
Contractor of his liabilities under the terms and conditions of the Contract.
14.2 If it becomes necessary for the Contractor to rectify or renew any defective portions of the works the
provision of this clause shall apply to portion of the works so rectified or corrected until the expiry of six
(6) months from the date of such rectification or correction. If any defects are not rectified within a
reasonable time, the Engineer may proceed to do the work at the Contractor’s risk and cost but without
prejudice to any other rights which the Owner may have against the Contractor in respect of such
14.3 The rectification or correction of the work will be carried out free of cost by the Contractor. If any
rectification or correction is carried out on his behalf at the site, the Contractor shall bear the cost of
such rectification or correction.
14.4 The acceptance of the works by the Engineer shall in no way relieve the Contractor of his obligations
under this clause.
15.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed against the
Owner or the Contractor in pursuance of the Contract. In addition, the Contractor shall be responsible
for payment of all Indian duties, levies and taxes lawfully assessed against the Contractor for his
personal income & property only.
16.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the Owner, for the
failure, omission or neglect on the part of the Contractor to perform any acts, matters, covenants or
things under the Contract, or for damage or injury caused by the alleged omission or negligence on the
part of the Contractor, his agents, representatives or his Sub-Contractors, or in connection with any
claim based on lawful demands of Sub-Contractors, workmen, suppliers or employees, the Contractor
shall in all such cases indemnify and keep the Owner, and the Engineer and/or his representative,
harmless from all losses, damages, expenses or decrees arising of such action.
17.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the Contractor
from all his liabilities under the Contract. Such final payment shall be made only at the end of the
Guarantee/Warranty period or after finalization of material account and final bill and till such time as the
Contractual liabilities and responsibilities of the Contractor, shall prevail. All other payments made
under the Contract shall be treated as on-account payments.
18.0 ENGINEER’S DECISION
19.0 In respect of all matters which are left to the decision of the Engineer including the granting or with-
holding of the certificates, the Engineer shall, if required to do so by the Contractor, give in writing a
decision thereon.
19.1 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance with the
meaning and intent of the Contract, the Contractor may file with the Engineer, within fifteen (15) days
after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the
Engineer’s decision and the decision shall become final and binding.
19.2 The Engineer’s decision and the filing of the written objection thereto shall be a condition precedent to
the right to request arbitration. It is the intent of the Agreement that there shall be no delay in the
execution of the works and the decision of the Engineer as rendered shall be promptly observed.
20.0 POWER TO VARY OR OMIT WORK
20.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter referred to
as ‘variation’) under the Contract as detailed in the Contract Documents, shall be made by the
Contractor except as directed in writing by the Engineer, but the Engineer shall have full powers
subject to the provisions hereinafter contained, from time to time during the execution of the Contract,
by notice in writing to instruct the Contractor to make such variation without prejudice to the Contract.
The Contractor shall carry out such variation and be bound by the same conditions as far as applicable
as though the said variations occurred in the Contract Documents. If any suggested variations would,
in the opinion of the Contractor, if carried out, prevent him from fulfilling any of his obligations or
guarantees under the Contract, he shall notify the Engineer thereof in writing and the Engineer shall
decide forthwith whether or not, the same shall be carried out and if the Engineer confirms his
instructions, the Contractor’s obligations and guarantees shall be modified to such an extent as may be
mutually agreed. Any agreed difference in cost occasioned by any such variation shall be added to or
deducted from the Contract Price as the case may be.
20.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be given to the
Contractor to enable him to work his arrangement accordingly, and in cases where goods or materials
are already prepared or any design, drawings or pattern made or work done as per the contract
requires to be altered, a reasonable and agreed sum in respect thereof shall be paid to the Contractor.
20.3 In any case in which the Contractor has received instructions from the Engineer as to the requirement
of carrying out the alterations or additional or substituted work which either then or later on, will in the
opinion of the Contractor, involve a claim for additional payment, the Contractor shall immediately and
in no case later than thirty (30) days, after receipt of the instructions aforesaid and before carrying out
the instructions, advise the Engineer to that effect. But the Engineer shall not become liable for
payment of any charges in respect of any such variations, unless the instructions for the performance
of the same shall be confirmed in writing by the Engineer.
20.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in writing, so
to the extent of any change in the price, before the Contractor proceeds with the change.
20.5 In all the above cases, in the event of a disagreement as to the reasonableness of the said sum, the
decision of the Engineer shall prevail.
20.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power to instruct
the Contractor, in writing, during the execution of the Contract to vary the quantities of the items or
groups of items in accordance with the provisions of clause entitled ‘Change of Quantity’ in section
GCC of this Volume-I. The Contractor shall carry out such variations and be bound by the same
conditions as though the said variations occurred in the Contract Documents. However, the Contract
Price shall be adjusted at the rates and the prices provided for the original quantities in the Contract.
21.0 CHANGE OF QUANTITY
21.1 During the execution of the Contract, the Owner reserves the right to increase or decrease the
quantities of items under the Contract but without any change in unit price or other terms & conditions.
Such variations unless otherwise specified in the accompanying Special Conditions of Contract and/or
Technical Specifications, shall not be subjected to any limitation for the individual items but the total
variations in all such items under the Contract shall be limited to a percentage of the Contract price as
specified in the Special Conditions of Contract.
21.2 The Contract price shall accordingly be adjusted based on the unit rates available in the Contract for
the change in quantities as above.
22.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting Engineers
and freely exchange with them such technical information as is necessary to obtain the most efficient
and economical design and to avoid unnecessary duplication of efforts. The Engineer shall be
provided with three copies of all correspondence addressed by the Contractor to other Contractors and
Consulting Engineers of the Owner in respect of such exchange of technical information, wherever
23.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or agents nor
any order by the Owner or the Engineer for payment of money or any payment for or acceptance of,
the whole or any part of the Works by the Owner or the Engineer, nor any extension of time, nor any
possession taken by the Engineer shall operate as a waiver of any provision of the Contract, or of any
power herein reserved to the Owner or any right to damages herein provided nor shall any waiver of
any breach in the Contract be held to be a waiver of any other or subsequent breach.
24.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE CONTRACTOR.
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner, nor any
extension of time for execution of the Works granted by the Engineer shall affect or prejudice the rights
of the Owner against the Contractor or relieve the Contractor of his obligation for the due performance
of the Contract, or be interpreted as approval of the Works done or of the equipment furnished and no
certificate shall create liability for the Owner to pay for alterations, amendments, variations or additional
works not ordered, in writing , by the Engineer or discharge the liability of the Contractor for the
payment of damages whether due, ascertained, or certified or not or any sum against the payment of
which he is bound to indemnify the Owner, nor shall any such certificate nor the acceptance by him of
any sum paid on account or otherwise affect or prejudice the rights of the Owner against the
Contractor.
25.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at his own cost
submit periodic progress reports as may be reasonably required by the Engineer with such materials
as, charts, net-works, photographs, test certificates, etc. Such progress reports shall be in the form and
size as may be required by the Engineer.
26.0 TAKING OVER
Upon successful completion of all the tests to be performed at Site on equipment furnished and
erected by the Contractor, the Engineer shall issue to the Contractor a Taking Over Certificate as a
proof of the final acceptance of the equipment. Such certificate shall not unreasonably be withheld nor
will the Engineer delay the issuance thereof on account of minor omissions or defects which do not
affect the commercial operation and/or cause any serious risk to the equipment. Such certificate shall
not relieve the Contractor of any of his obligations which otherwise survive, by the terms and conditions
of the Contract after issue of such certificate.
27.0 PAYMENT
27.1 The payment to the Contractor for the performance of the works under the Contract will be made by
the Owner as per the guidelines and conditions specified herein. All payments made during the
Contract shall be on account payments only. The final payment will be made on completion of all
Works and on fulfillment by the Contractor of all his liabilities under the Contract.
27.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
27.3 Terms.
Payment terms will be as prescribed in the special conditions of contract and on fulfillment of
conditions specified thereof.
28.0 Payment Schedule
28.1 Application for Payment
28.2 The Contractor shall submit application for the payment in the prescribed Performa of the Owner.
Performa for application for payment will be as prescribed.
29.1 Each such application shall state the amount claimed and shall set forth in detail, in the order of the
Payment Schedule, particulars of the Works including the Works executed at Site and of the
equipment shipped/brought on to the site pursuant to the Contract up to the date mentioned in the
application and for the period covered since the last preceding certificate, if any.
29.2 Every interim payment certificate shall certify the Contract value of the Works executed upto the date
mentioned in the application for the payment certificate, provided that no sum shall be included in any
interim payment certificate in respect of the works that, according to the decision of the Engineer, does
not comply with the Contract.
29.3 Mode of Payment
29.4 Payment due on dispatch of equipment shall be made by the Owner through Owner’s Bank or directly
to the Contractor as per the payment schedule.
29.5 The payment of test charges, if any, payment, taxes and duties (whenever admissible) inland
transportation (including port handling), insurance and the erection portion of the Works shall be made
direct to the Contractor by the Owner.
29.6 All payments under the Contract shall be made as stipulated in the Special Conditions of Contract after
signing the Contract Agreement. The payments linked with the dispatch of materials shall only be
made after production of all dispatch documents as specified in the relevant Contract conditions which
will interalia include the Material Inspection Clearance Certificate issued by the Owner.
Progressive payments linked with erection shall only be made after the issue of certificates by the
Engineer, one for the quantum of work completed and the other for the successful completion of quality
check points involved in the quantum of work billed.
30.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses that the Owner may have paid, for which under the Contract the
Contractor is liable, or any other retention award will be claimed by the Owner. The Owner to the
Contractor shall bill all such claims regularly as and when they fall due. Such bills shall be supported
by appropriate and certified vouchers or explanations, to enable the Contractor to properly identify
such claims. Such claims shall be paid by the Contractor within thirty (30) days of the receipt of the
corresponding bills and if not paid by the Contractor within the said period, the Owner may then deduct
the amount, from any money due or becoming due by him to the Contractor under the Contract or may
be recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
31.0 INSURANCE
31.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to the
Works and obligatory in terms of law to protect his interest and interests of the Owner against all perils
detailed herein. The form and the limit of such insurance as defined herein together with the under-
writer in each case shall be acceptable to the Owner. However, irrespective of such acceptance, the
responsibility to maintain adequate insurance coverage at all time during the period of Contract shall
be of Contractor alone. The Contractor’s failure in this regard shall not relieve him of any of his
contractual responsibilities and obligations. The insurance covers to be taken by the Contractor shall
be in the joint name of the Owner and the Contractor. The Contractor shall, however, be authorized to
deal directly with Insurance Company or Companies and shall be responsible in regard to maintenance
of all insurance covers. Further the insurance should be in freely convertible currency.
31.2 Any loss or damage to the equipment during handling, transportation, storage, erection, putting into
satisfactory operation and all activities to be performed till the successful completion of commissioning
of the equipment shall be to the account of the Contractor. The Contractor shall be responsible for
preference of all claims and make good the damages or loss by way of repairs and/or replacement of
the equipment, damaged or lost. The transfer of title shall not in any way relieve the Contractor of the
above responsibilities during the period of Contract. The Contractor shall provide the Owner with copy
of all insurance policies and documents taken out by him in pursuance of the Contract. Such copies of
documents shall be submitted to the Owner immediately after such insurance coverage. The
Contractor shall also inform the Owner in writing at least sixty (60) days in advance regarding the
expiry/cancellation and/or change in any of such documents and ensure revalidation, renewal etc., as
may be necessary well in time.
31.3 The perils required to be covered under the insurance shall include, but not be limited to fire and allied
risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage in transit,
theft, pilferage, riot and strikes and malicious damages, civil commotion, weather conditions, accidents
of all kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including delivery of goods and
other costs till the equipment is delivered at Site. The insurance policies to be taken should be on
replacement value basis and/or incorporating escalation clause. Notwithstanding the extent of
insurance cover and the amount of claim available from the underwriters, the Contractor shall be liable
to make good the full replacement/rectification value of all equipment/materials and to ensure their
availability as per project requirements.
31.4 All costs on account of insurance liabilities covered under the Contract will be on Contractor’s account
and will be included in Contract Price, However, the Owner may from time to time, during the pendency
of the Contract, ask the Contractor in writing to limit the insurance coverage, risks and in such a case,
the parties to the Contract will agree for a mutual settlement, for reduction in Contract price to the
extent of reduced premia amount. The Contractor, while arranging the insurance shall ensure to
obtain all discounts on premia, which may be available for higher volume or for reason of financing
arrangement of the project.
31.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional insurance
requirements for the portion of the works to be performed at the Site.
31.6 Special Conditions of Contract details out the various insurance liabilities.
32.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the
successful completion of commissioning as defined elsewhere in the Bid document.
33.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
34.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the Owner or
his authorized agents, then the Contractor shall be given due extension of time for the completion of
the Works, to the extent such omission on the part of the Owner has caused delay in the Contractor’s
performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer shall be
35.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation if
such delays have resulted in any increase in cost. The Owner shall examine the justification for such a
request for claim and if satisfied, the extent of compensation shall be mutually agreed depending upon
the circumstances at the time of such an occurrence.
36.0 FORCE MAJEURE
36.1 Force majeure is herein defined as any cause which is beyond the control of the Contractor or the
Owner as the case may be, which they could not foresee or with a reasonable amount of diligence
could not have foreseen and which substantially affects the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and epidemics:
b. Acts of any Government, domestic or foreign, including but not limited to war, declared or
undeclared, priorities, guarantees, embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the other
in writing of such causes.
36.2 The Contractor or the Owner shall not be liable for delays in performing his obligations resulting from
any force majeure cause as referred to and/or defined above
The date of completion will, subject to hereinafter provided, be extended by a reasonable time even
though such cause may occur after Contractor’s performance of obligation has been delayed due to
other causes.
37.0 SUSPENSION OF WORK
37.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part of the Works
without invalidating the provisions of the Contract. Orders for suspension or reinstatement of the
Works will be issued by the Engineer to the Contractor in writing. The time for completion of the works
will be extended for a period equal to duration of the suspension.
37.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension of the
works will be paid by the Owner, provided such costs are substantiated to the satisfaction of the
Engineer. The Owner shall not be responsible for any liabilities if suspension or delay is due to some
default on the part of the Contractor or his Sub-Contractor.
38.0 CONTRACTOR`S DEFAULT
38.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall refuse or
neglect to comply with any reasonable order given to him, in writing by the Engineer in connection with
the works or shall contravene the provisions of the Contract, the Owner may give notice in writing to
the Contractor to make good the failure, neglect or contravention complained of. Should the
Contractor fail to comply with the notice within thirty (30) days from the date of serving the notice, then
and in such case the Owner shall be at liberty to employ other workmen and forthwith execute such
part of the works as the Contractor may have neglected to do or if the Owner shall think fit, without
prejudice to any other right he may have under the Contract to take the work wholly or in part out of the
Contractor’s hands and re-contract with any other person or persons to complete the works or any part
thereof and in that event the Owner shall have free use of all Contractor’s equipment that may have
been at the time on the Site in connection with the works without being responsible to the Contractor
for fair wear and tear thereof and to the exclusion of any right of the Contractor over the same, and the
Owner shall be entitled to retain and apply any balance which may otherwise be due on the Contract
by him to the Contractor, or such part thereof as may be necessary, to the payment of the cost of
executing the said part of the Works or of completing the Works as the case may be. If the cost of
completing of works or executing part thereof as aforesaid shall exceed the balance due to the
Contractor shall pay such excess. Such payment of excess amount shall be independent of the
liquidated damages for delay which the Contractor shall have to pay if the completion of works is
38.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his liability to pay
liquidated damages for delay in completion of Works as defined in Clause 14.0 of this Section.
38.3 Such action by the Owner as aforesaid the termination of the Contract under this clause shall not
entitle the Contractor to reduce the value of the Contract Performance Guarantee nor the time thereof.
The Contract Performance Guarantee shall be valid for the full value and for the full period of the
Contract including guarantee period.
39.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
39.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons other than
those mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in such an event give
fifteen (15) days’ notice in writing to the Contractor of his decision to do so.
39.2 The Contractor upon receipt of such notice shall discontinue the work on the date and to the extent
specified in the notice, make all reasonable efforts to obtain cancellation of all orders and Contracts to
the extent they are related to the work terminated and terms satisfactory to the Owner, stop all further
sub-contracting or purchasing activity related to the work terminated, and assist Owner in
maintenance, protection, and disposition of the works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and
reasonable, dictated by the circumstances prevalent at the time of termination.
39.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies and if
the Contractor is a partnership concern and one of the partners dies then unless the Owner is satisfied
that the legal representatives of the individual Contractor or of the proprietor of the propriety concern
and in the case of partnership, the surviving partners, are capable of carrying out and completing the
Contract the Owner shall be entitled to cancel the Contract as to its incompleted part without being in
any way liable to payment of any compensation to the estate of deceased Contractor and/or to the
surviving partners of the Contractor’s firm on account of the cancellation of the Contract. The decision
of the Owner that the legal representatives of the deceased Contractor or surviving partners of the
Contractor’s firm cannot carry out and complete the Contract shall be final and binding on the parties.
In the event of such cancellation the Owner shall not hold the estate of the deceased Contractor and/or
the surviving partners of the estate of the deceased Contractor and/or the surviving partners of the
Contractor’s firm liable to damages for not completing the Contract.
40.0 FRUSTRATION OF CONTRACT
40.1 In the event of frustration of the Contract because of supervening impossibility in terms of Section 56 of
the Indian Contract Act, parties shall be absolved of their responsibility to perform the balance portion
of the Contract, subject to provisions contained in sub-clause 45.3 below.
40.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except for reason
of willful or flagrant breach by the Owner) and/or Contractor then the works under the Contract shall be
suspended.
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing to the
Contractor in accordance with the terms of the Contract within three months of the event, the parties
hereto shall be relieved from carrying out further obligations under the Contract treating it as frustration
of the Contract.
40.3 In the event referred to in sub-clauses 45.1 & 45.2 above the parties shall mutually discuss to arrive at
reasonable settlement on all issues including amounts due to either party for the work already done on
quantum merit_ basis, which shall be determined by mutual agreement between the parties.
41.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the Contractor or
his partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any one on his or their
behalf in relation to the obtaining or to the execution of this or any other Contract with the Owner, shall
in addition to any criminal liability which it may incur, subject the Contractor to the cancellation of this
and all other Contracts and also to payment of any loss or damage to the Owner resulting from any
cancellation. The Owner shall then be entitled to deduct the amount so payable from any money
otherwise due to Contractor under the Contract.
RESOLUTION OF DISPUTES
42.0 SETTLEMENT OF DISPUTES
42.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to the extent
possible, be settled amicably between the parties.
42.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the Contractor,
arising out of the Contract for the performance of the Works whether during the progress of the Works
or after its completion or whether before or after the termination, abandonment or breach of the
Contract, it shall, in the first place, be referred to and settled by the Engineer, who, within a period of
thirty (30) days after being requested by either party to do so, shall give written notice of his decision to
the Owner and the Contractor.
42.3 Save as hereinafter provided, such decision in respect of every matters so referred shall be final and
binding upon the parties until the completion of the Works and shall forthwith be given effect to by the
Contractor who shall proceed with the Works with all due diligence, whether he or the Owner requires
arbitration as hereinafter provided or not.
42.4 If after the Engineer has given written notice of his decision to the parties, no claim to arbitration has
been communicated to him by either party within thirty (30) days from the receipt of such notice, the
said decision shall become final and binding on the parties.
42.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days after being
requested as aforesaid, or in the event of either the Owner or the Contractor being dissatisfied with any
such decision, or within thirty (30) days after the expiry of the first mentioned period of thirty days, as
the case may be, either party may require that the matters in dispute be referred to arbitration as
hereinafter provided.
43.0 ARBITRATION
43.1 All disputes or differences in respect of which the decision, if any, of the Engineer has not become final
or binding as aforesaid shall be settled by arbitration in the manner hereinafter provided.
43.1.1 The arbitration shall be conducted by three arbitrators, one each to be nominated by the Contractor
and the Owner and the third to be appointed as an umpire by both the arbitrators in accordance with
the Indian Arbitration Act. If either of the parties fails to appoint its arbitrator within sixty (60) days after
receipt of a notice from the other party invoking the Arbitration clause, the arbitrator appointed by the
party invoking the arbitration clause shall become the sole arbitrator to conduct the arbitration.
43.1.2 The arbitration shall be conducted in accordance with the provisions of the Indian Arbitration Act,
or any statutory modification thereof. The venue of arbitration shall be Bharuch.
43.2 The decision of the majority of the arbitrators shall be final and binding upon the parties.
The arbitrators may, from time to time with the consent of all the parties enlarge the time for making the
award. In the event of any of the aforesaid arbitrators dying, neglecting, resigning or being unable to
act for any reason, it will be lawful for the party concerned to nominate another arbitrator in place of the
outgoing arbitrator.
43.3 The arbitrator shall have full powers to review and/or revise any decision, opinion, direction,
certification or valuation of the Engineer in accordance with the Contract, and neither party shall be
limited in the proceedings before such arbitrators to the evidence or arguments put before the
Engineer for the purpose of obtaining the said decision.
43.4 No decision given by the Engineer in accordance with the foregoing provisions shall disqualify him as
being called as a witness or giving evidence before the arbitrators on any matter whatsoever relevant
to the dispute or difference referred to the arbitrators as aforesaid.
43.5 During settlement of disputes and arbitration proceedings, both parties shall be obliged to carry out
their respective obligations under the Contract.
44.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every month, a statement covering payments claimed and the
payments received vis-a-vis the works executed, for reconciliation of accounts with the Owner. The
Contractor shall also prepare and submit a detailed account of Owner Issue materials received and
utilized by him for reconciliation purpose in a format to be discussed & finalized with the Owner before
the award of Contract.
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Bharuch
ERECTION CONDITIONS OF CONTRACT
1.0 GENERAL
1.1 The following shall supplement the conditions already contained in other parts of these specifications &
document and shall govern the portion of the work of this Contract to be performed at Site.
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his representative
at Site suitably designated for the purpose of overall responsibility and coordination of the works to be
performed at Site. Such person shall function from the Site office of the Contractor during the
pendency of Contract.
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during the
performance of his field activities. He shall also comply with the Minimum Wages Act, 1948 and the
Payment of Wages Act (both of the Government of India) and the rules made thereunder in respect of
any employee or workman employed or engaged by him or his Sub-Contractor. He shall abide by
labour laws and others as specified in the special conditions of contract.
2.2 All registration and statutory inspection fees, if any, in respect of his work pursuant to this Contract
shall be to the account of the Contractor. Should any such inspection or registration need to be re-
arranged due to the fault of the Contractor or his Sub Contractor, the additional fees to such inspection
and/or registration also shall be borne by the Contractor.
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all equipment brought to the Site for the purpose of erection, testing and
commissioning of the equipment to be supplied & erected under the Contract. The Owner shall
continue to hold the lien on all such equipment throughout the period of Contract. No material brought
to the Site shall be removed from the Site by the Contractor and/or his Sub-Contractors without the
prior written approval of the Engineer.
4.0 ACCESS TO SITE AND WORKS ON SITE
4.1 Suitable access to and possession of the Site shall be afforded to the Contractor by the Owner in
reasonable time.
4.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at such time as the
Owner may approve and the Owner shall give the Contractor reasonable facilities for carrying out the
4.3 In the execution of the works, no person other than the Contractor or his duly appointed representative,
Sub- Contractor and workmen, shall be allowed to do work on the Site, except by the special
permission, in writing of the Engineer or his representative.
5.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of the
Contract. Any written order or instruction of the Engineer or his duly authorized representative, shall be
communicated to the said authorized resident representative of the Contractor and the representative
shall be available at a stated address for this purpose.
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner, who may be
performing other works on behalf of the Owner and the workmen who may be employed by the Owner
and doing work in the vicinity of the Works under the Contract. The Contractor shall also so arrange to
perform his work as to minimize, to the maximum extent possible, interference with the work of other
Contractors and their workmen. Any injury or damage that may be sustained by the employees of the
other Contractors and the Owner, due to the Contractor’s work shall promptly be made good at the
Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of his
employees and workmen at Site. The Engineer shall be at liberty to object to the presence of any
representative or employee of the Contractor at the Site, if in the opinion of the Engineer such
employee has misconduct himself or is incompetent or negligent or otherwise undesirable and then the
Contractor shall remove such a person objected to and provide in his place a competent replacement.
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor shall keep the Engineer informed in advance regarding his field activity plans and
schedules for carrying-out each part of the works. Any review of such plan or schedule or method of
work by the Engineer shall not relieve the Contractor of any of his responsibilities towards the field
activities. Such reviews shall also not be considered as an assumption of any risk or liability by the
Engineer or the Owner or any of his representatives and no claim of the Contractor will be entertained
because of the failure or inefficiency of any such plan or schedule or method of work reviewed. The
Contractor shall be solely responsible for the safety, adequacy and efficiency of plant and equipment
and his erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site including the
safety of all persons employed by him or his Sub–Contractor and all the properties under his custody
during the performance of the work. This requirement shall apply continuously till the completion of the
Contract and shall not be limited to normal working hours.
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress including if any,
photographs of the work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection activities shall highlight
comparison to the schedules. The report shall also indicate the reasons for the variance between the
scheduled and actual progress and the action proposed for corrective measures, wherever necessary.
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hours schedule for
the month, detailing the man hours scheduled for the month, skill-wise and area-wise.
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over by the
Engineer. No claim will be entertained by the Owner or by the Engineer for any damage or loss to the
Contractor’s works and the Contractor shall be responsible for complete restoration of the damaged
works to original conditions to comply with the specification and drawings.
12.0 EMPLOYMENT OF LABOUR
12.1 The Contractor will be expected to employ on the work only his regular skilled employees with
experience of his particular work. No person below the age of eighteen years shall be employed.
12.2 All traveling expenses including provisions of necessary transport to and from Site, lodging, allowances
and other payments to the Contractor’s employees shall be the sole responsibility of the Contractor.
12.3 In case the Owner becomes liable to pay any wages or dues to Labour or any Government agency
under any of the provisions of the Minimum Wages Act, Workmen Compensation Act, Contract Labour
Regulation Abolition Act or any other law due to act of omission of the Contractor, the Owner may
make such payment and shall recover the same from the Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE OWNER
13.1 Space
Land for Contractor’s Store, Workshop etc.
a) The Engineer shall at his discretion and for the duration of execution of the Contract make available at
site, land for Transmission of Contractor’s field office, workshop, stores, etc. required for execution of
the Contract. Any such temporary Transmission shall be done by the Contractor at his cost.
b) On completion of work the Contractor shall hand over the land duly cleaned to the Engineer. Until and
unless the Contractor has handed over the vacant possession of land allotted to him for the above
purpose, the payment of his final bill shall not be made.
13.2 Electricity:
Power supply:
Where power supply is available with the Owner for Transmission purpose the same will be provided at
the job site at one point of the distribution system as may be decided by Engineer. Electricity furnished
will be 440 volts, 3 phase, 50 cycles and 230 volts, 1 phase, 50 cycles. Each Contractor shall provide
and install all necessary transformers, switchgears, wiring fixtures, bulbs and other temporary
equipment for further distribution and utilization of energy for power and lighting and shall remove the
same on completion of the work. Should, however, electricity be used in the Contractor’s labour/staff
colony, the power so consumed shall be charged at the prevailing tariff rate of the GUVNL as prevalent
for that area at the time of award of work; the supply may be withdrawn if the power is used for
purposes other than for the work of the project and the Contractor shall not be entitled to any claim
whatsoever on account of any such action taken by the Engineer. For this purpose, contractor shall
have to apply to DISCOM for separate temporary connection on his name.
14.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
14.1 Tools, tackles and scaffoldings
The Contractor shall provide all the Transmission equipments; tools, tackles and scaffoldings required
for pre-assembly, erection, testing and commissioning of the equipment covered under the Contract.
He shall submit a list of all such materials to the Engineer before the commencement of work at Site.
These tools and tackles shall not be removed from the Site without the written permission of the
14.2 First-aid
14.3 The Contractor shall provide necessary first-aid facilities for all his employees, representatives and
workmen working at the Site. Enough number of Contractor’s personnel shall be trained in
administering first-aid.
14.4 Cleanliness
14.4.1 The Contractor shall be responsible for keeping the entire area allotted to him clean and free from
rubbish, debris etc. during the period of Contract. The Contractor shall employ enough number of
personnel to keep the work area clean. Materials and stores shall be so arranged to permit easy
cleaning of the area. In areas where equipment might drip oil and cause damage to the floor surface,
a suitable protective cover of a flame resistant, oil proof sheet shall be provided to protect the floor
from such damage.
15.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the drawings. The
Contractor shall be responsible to locate and lay-out the works. Basic horizontal and vertical control
points will be established and marked by the Engineer at site at suitable points. These points shall be
used as datum for the works under the Contract. The Contractor shall inform the Engineer well in
advance of the times and places at which he wishes to do work in the area allotted to him so that
suitable datum points may be established and checked by the Engineer to enable the Contractor to
proceed with his works. Any work done without being properly located may be removed and/or
dismantled by the Engineer at Contractor’s expense.
16.0 FIRE PROTECTION
16.1 The work procedures that are to be used during the erection shall be those, which minimize fire
hazards to the extent practicable. Combustible materials, combustible waste and rubbish shall be
collected and removed from the Site at least once each day. Fuels, oils and volatile or inflammable
materials shall be stored away from the Transmission and equipment and materials storage areas.
fighting. Enough of such trained personnel must be available at the Site during the entire period of the
17.0 SECURITY
The Contractor shall have total responsibility for all equipment and materials in his custody/stores,
loose, semi-assembled and/or erected by him at Site. The Contractor shall make suitable security
arrangements ensure the protection of all materials, equipment and works from theft, fire, pilferage and
any other damages and loss.
18.0 PRE-COMMISSIONING TRIALS AND INITIAL OPERATIONS
The pre-commissioning trials and initial operations of the equipment erected by the Contractor shall be
carried out in presence of contractor and is deemed considered as part of the work completion. If it is
anticipated that the above test may prolong for a long time, the Contractor’s workmen required for the
above test shall always be present at Site during such tests and trials.
19.0 MATERIALS HANDLING AND STORAGE
19.1 All the equipment furnished under the Contract and arriving at Site shall be promptly received,
unloaded, transported and stored in the storage spaces by the Contractor.
19.2 Contractor shall be responsible for examining all the shipment and notify the Engineer immediately of
any damages, storage, discrepancy etc, for the purpose of Engineer’s information only. The Contractor
shall submit to the Engineer every week a report detailing all the receipts during the week. However,
the Contractor shall be solely responsible for any shortages or damages in transit, handling and / or in
storage and erection of the equipment at Site. Any demurrage, wharf age and other such charges
claimed by the transporters, railways etc, shall be to the account of the Contractor. For shortages of
any materials issued by the GETCO for the work, recovery shall be made from you, on the basis of
prices of the materials (prevailing on the date of settlement of materials account) plus 15% supervision
charges plus GST as applicable.
19.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of all equipment
materials received by him for the purpose of erection and keep such record open for the inspection of
the Engineer in-charge.
19.4 All equipment shall be handled very carefully to prevent any damage or loss. The equipment stored
shall be properly protected to prevent damage either to the equipment or to the floor where they are
stored. The equipment from the store shall be moved to the actual location at the appropriate time so
as to avoid damage of such equipment at Site.
19.5 All electrical panels, control gears, motors and such other devices shall be properly dried by heating
before they are installed and energized. Motor bearings, slip ring, commutators and other exposed
parts shall be protected against moisture ingress and corrosion during storage and periodically
inspected.
19.6 All the electrical equipment such as motors, generators, etc. shall be tested for insulation resistance at
least once in three months from the date of receipt till the date of commissioning and a record of such
measured insulation values maintained by the Contractor. Such records shall be opened for inspection
by the Engineer.
19.7 The consumable and other supplies likely to deteriorate due to storage must be thoroughly protected
and stored in a suitable manner to prevent damage or deterioration in quality by storage.
19.8 All the materials stored in the open or dusty location must be covered with suitable weatherproof and
flame proof covering material wherever applicable.
19.9 If the materials belonging to the Contractor are stored in areas other than those earmarked for him, the
Engineer will have the right to get it moved to the area earmarked for the Contractor at the Contractor’s
19.10 The Contractor shall be responsible for making suitable indoor storage facilities to store all equipment,
which require indoor storage. Normally, all the electrical equipment such as motors, control gears,
generators, exciters and consumables like electrodes, lubricants etc. shall be stored in the closed
storage space. The Engineer, in addition, may direct the Contractor to move certain other materials,
which in his opinion will require indoor storage, to indoor storage areas, which the Contractor shall
strictly comply with.
20.0 TRANSMISSION MANAGEMENT
20.1 The field activities of the Contractors working at Site, will be coordinated by the Engineer and the
Engineer’s decision shall be final in resolving any disputes or conflicts between the Contractor and
other Contractors and the tradesmen of the Owner regarding scheduling and coordination of work.
Such decision by the Engineer shall not be a cause for extra compensation or extension of time for the
Contractor.
20.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place to be
designated by the Engineer. The Contractor shall attend such meetings and take notes of discussions
during the meeting and the decision of the Engineer and shall strictly adhere to those decisions in
performing his works. In addition to the above weekly meeting, the Engineer may call for other
the Contractors if called, will also attend such meetings.
20.3 Time is the essence of the Contract and the Contractor shall be responsible for performance of his
works in accordance with the specified Transmission schedule. If at any time, the Contractor is falling
behind the schedule, he shall take necessary action to make good for such delays by increasing his
work force or by working overtime or otherwise accelerate the progress of the work to comply with the
schedule and shall communicate such actions in writing to the Engineer, satisfying that his action will
compensate for the delay. The Contractor shall not be allowed any extra compensation for such
20.4 The Engineer shall, however, not be responsible for provision of additional labour and/or materials or
supply or any other services to the Contractor except for the coordination work between various
Contractors if any at site.
21.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and other Contract
Documents and any other supplementary data complete with all the latest revisions thereto. The
Contractor shall also maintain in addition the continuous record of all changes to the above Contract
Documents, drawings, specifications, and supplementary data, etc. effected at the field and on
completion of his total assignment under the Contract shall incorporate all such changes on the
drawings and other Engineering data to indicate as installed conditions of the equipment furnished and
erected under the Contract. Such drawings and Engineering data shall be submitted to the Engineer in
required number of copies.
22.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
22.1 The Contractor shall bring to Site all equipment, components, parts, materials, including Transmission
equipment, tools and tackles for the purpose of the works under intimation to the Engineer. All such
goods shall, from the time of their being brought vest in the Owner, but may be used for the purpose of
the works only and shall not on any account be removed or taken away by the Contractor without the
written permission of the Engineer. The Contractor shall nevertheless be solely liable and responsible
for any loss or destruction thereof and damage thereto.
22.2 The Owner shall have a lien on such goods for any sum or sums which may at any time be due or
owing to him by the Contractor, under, in respect of or by reasons of the Contract. After giving a fifteen
(15) days’ notice in writing of his intention to do so, the Owner shall be at liberty to sell and dispose off
any such goods, in such manner as he shall think fit and to apply the proceeds in or towards the
satisfaction of such sum or sums due as aforesaid.
22.3 After the completion of the Works, the Contractor shall remove from the Site under the direction of the
Engineer the materials such as Transmission equipment, erection tools and tackles, scaffolding etc.
with the written permission of the Engineer.
23.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
23.1 The Contractor shall be responsible for any damage resulting from his operations. He shall also be
responsible for protection of all persons including members of public and employees of the Owner and
the employees of other Contractors and Sub-Contractors and all public and private property.
24 INSURANCE
24.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General Terms and
Conditions of Contract of this Volume-I, the following provisions will also apply to the portion of works
to be done beyond the Contractor’s own or his Sub-Contractor’s manufacturing Works.
24.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the Workmen’s
Compensation Act, 1948 (Government of India). This policy shall also cover the Contractor against
claims for injury, disability, disease or death of his or his Sub-Contractor’s employee, which for any
reason are not covered under the Workmen’s Compensation Act, 1948. The liabilities shall not be less
Workmen’s Compensation : As per statutory Provisions
Employee’s Liability : As per statutory Provisions
24.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries, disabilities, disease
or death of members of public or damage to property of others, due to any act of omission on the part
of the Contractor, his agents, his employees, his representatives and Sub-Contractors or from riots,
strikes and civil commotion.
2.4.4 The hazards to be covered will pertain to all the works and areas where the Contractor, his Sub-
Contractors, his agents and his employees have to perform work pursuant to the Contract.
24.5 The above are only illustrative list of insurance covers normally required and it will be the responsibility
of the Contractors to maintain all necessary insurance coverage to the extent both in time and amount
to take care of all his liabilities either direct or indirect, in pursuance of the Contract.
25.0 UNFAVOURABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works, which can be performed without
subjecting the equipment and materials to adverse effects during inclement weather conditions, like
monsoon, storms etc. and during other unfavorable Transmission conditions. No field activities shall be
performed by the Contractor under conditions, which might adversely affect the quality and efficiency
thereof, unless special precautions or measures are taken by the Contractor in a proper and
satisfactory manner in the performance of such Works and with the concurrence of the Engineer. Such
unfavorable Transmission conditions will in no way relieve the Contractor of his responsibility to
perform the Works as per the schedule.
26.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc. which he may
come across during the course of performance of his Works either during excavation or elsewhere, are
properly protected and handed over to the Engineer. Similarly, the Contractor shall ensure that the
bench marks, reference points, etc which are marked either with the help of Engineer or by the
Engineer shall not be disturbed in any way during the performance of his Works. If any work is to be
performed which disturbs such reference the same shall be done only after these are transferred to
other suitable locations under the direction of the Engineer. The Contractor shall provide all necessary
materials and assistance for such relocation of reference points etc.
27.0 WORK & SAFETY REGULATIONS
27.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and equipment
belonging to him or to GETCO or to others, working at the Site. The Contractor shall also be
responsible for provision of all safety notices and safety equipment required both by the relevant
legislations and the Engineer, as he may deem necessary.
27.4 All equipment used in Transmission and erection by Contractor shall meet Indian/International
Standards and where such standards do not exist, the Contractor shall ensure these to be absolutely
safe. All equipment shall be strictly operated and maintained by the Contractor in accordance with
manufacturer’s Operation Manual and safety instructions and as per Guidelines/rules of GETCO in this
27.5 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be carried-out in
accordance with the relevant provisions of Factories Act 1948, Indian Electricity Act 1910 and
associated Laws/Rules in force from time to time. A register of such examinations and tests shall be
properly maintained by the Contractor and will be promptly produced as and when desired by the
Engineer or by the person authorized by him.
27.6 The Contractor shall provide suitable safety equipment of prescribed standard to all employees and
workmen according to the need.
27.8 The Contractor shall provide safe working conditions to all workmen and employees at the Site
including safe means of access, railings, stairs, ladders, scaffoldings etc. The scaffoldings shall be
erected under the control and supervision of an experienced and competent person. For erection,
good and standard quality of material only shall be used by the Contractor.
27.9 The Contractor shall not interfere or disturb electric fuses, wiring and other electrical equipment
belonging to the Owner or other Contractors under any circumstances, whatsoever, unless expressly
permitted in writing by GETCO to handle such fuses, wiring or electrical equipment
27.10 Before the Contractor connects any electrical appliances to any plug or socket belonging to the other
Contractor or Owner, he shall:
(a). Satisfy the Engineer that the appliance is in good working condition;
(b) Inform the Engineer of the maximum current rating, voltage and phases of the
appliances:
(c) Obtain permission of the Engineer detailing the sockets to which the appliances
may be connected.
27.11 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of which shall be an
earthed metal sheath surrounding the cores.
27.12 No electric cable in use by the Contractor/Owner will be disturbed without prior permission. No weight
of any description will be imposed on any cable and no ladder or similar equipment will rest against or
attached to it.
27.13 No repair work shall be carried out on any live equipment. The equipment must be declared safe by
the Engineer and a permit to work shall be issued by the Engineer before any repair work is carried out
by the Contractor. While working on electric lines/equipment, whether live or dead, suitable type and
sufficient quantity of tools will have to he provided by the Contractor to electricians/workmen/officers.
27.14 In case any accident occurs during the Transmission/ erection or other associated activities undertaken
by the Contractor thereby causing any minor or major or fatal injury to his employees due to any
reason, whatsoever, it shall be the responsibility of the Contractor to promptly inform the same to the
Engineer in prescribed form and also to all the authorities envisaged under the applicable laws.
27.15 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion the work is
being carried out in such a way that it may cause accidents and endanger the safety of the persons
and/or property, and/or equipment. In such cases, the Contractor shall be informed in writing about the
nature of hazards and possible injury/accident and he shall comply to remove shortcomings promptly.
The Contractor after stopping the specific work can, if felt necessary, appeal against the order of
stoppage of work to the Engineer within 3 days of such stoppage of work and decision of the Engineer
in this respect shall be conclusive and binding on the Contractor.
27.16 The Contractor shall not be entitled for any damages/compensation for stoppage of work due to safety
reasons as provided in para 27.15 above and the period of such stoppage of work will not be taken as
an extension of time for completion of work and will not be the ground for waiver of levy of liquidated
27.17 It is mandatory for the Contractor to observe during the execution of the works, requirements of Safety
Rules which would generally include but not limited to following:-
a) Each employee shall be provided with initial indoctrination regarding safety by the Contractor, so as to
enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without
proper introduction as to the hazards incident thereto, both to himself and his
fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted
around fire prone areas and adequate firefighting equipment shall be provided at
crucial location.
d) There shall be a suitable arrangement at every work site for rendering prompt and
sufficient first aid to the injured.
j) Requirements of ventilation in underwater working to licensed and experienced
divers, use of gum boots for working in slushy or in inundated conditions are
essential requirements to be fulfilled.
27.18 The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of applicable
laws pertaining to the safety of workmen, employees, plant and equipment as may be prescribed from
time to time without any demur, protest or contest or reservations. In case of any discrepancy between
statutory requirement and GETCO Safety Rules referred above, the latter shall be binding on the
Contractor unless the statutory provisions are more stringent.
a. Fatal injury or accident: Rs 1, 00,000/-These are applicable Causing death per
person plus GST for death
b. Major injuries or accident causing :Rs. 20,000/-Injury to any person.
25% or more permanent disablement per person plus GST, whosoever to
Workmen or employees
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation Act. The
compensation mentioned above shall be in addition to the compensation payable to the
workmen/employees under the relevant provisions of the Workmen’s Compensation Act and rules
framed there under or any other applicable laws as applicable from time to time. In case the Owner is
made to pay such compensation then the Contractor is liable to reimburse the Owner such amount in
addition to the compensation indicated above.
28.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the equipment shall
be in accordance with the relevant Codes and accepted good engineering practice, the Engineer’s
drawings and other applicable Indian recognized codes and laws and regulation of the Government of
Signature of Contractor Superintending Engineer(TR)
GETCO, CO, Bharuch
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars:
This part of the Bid Document relates to certain specific/special terms and conditions particular to the
Contract. The provisions herein are to be read and understood in conjunction with the relevant
provisions elsewhere in the Instructions to Bidders (ITB), the General Conditions of Contract (GCC)
and Erection Conditions of Contract (ECC). The intent of provisions herein are specific to this contract
and are, in general, supplementary to related provisions under ITB, GCC and ECC. However, in certain
provisions which are contrary to those in ITB, GCC and ECC, the provisions in these Special
Conditions of Contract will prevail.
2.0 Tender Fee:
The tender fee specified in notice inviting tender is payable by Demand Draft (DD) drawn at Bharuch
on any Scheduled Bank in favour of GETCO Bharuch on any Scheduled Bank in Bharuch. The same
will be furnished in Cover-1 of Bid along with EMD (Bid Security).
3.0 Earnest Money Deposit (EMD):
3.1 (a) The estimated cost of Tender is more than Rs. 100 lacs, the EMD is payable as under:
50 % of EMD by online mode in favour of Gujarat Energy Transmission Corporation Ltd. on
any Scheduled Bank in Bharuch and Balance 50% by Bank Guarantee from any Nationalized
Bank in the format provided herein.
(b) The estimated cost of tender is less than Rs.100 Lacs, the EMD is payable as under:
100 % of EMD by online mode in favour of Gujarat Energy Transmission Corporation Ltd. on
any Scheduled Bank in Bharuch
The estimated cost for this Tender along with EMD is mentioned on tender notice.
3.2 Payment by Cheque/Cooperative Bank Guarantee/ Company Guarantee is not permissible.
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the same will make the
Bid invalid.
5.0 Qualifying Criteria:
5.1 TECHNICAL CRITERIA:
Experience as per qualifying requirement.
5.2 FINANCIAL CRITERIA:
The financial turnover of bidder (Financial year) shall not be less than Rs. 10 lacs during last 3 (three)
Financial years.
Registration of appropriate class with GETCO and validity of the registration should be furnished along
with the technical bid. Latest Bank solvency certificate of 20% of the tender value is required to be
furnished by the tenderer along with the technical bid.
6.0 Additional Documents:
Apart from various documents to be furnished along with the Bid as required in the GCC and ECC, the
following documents/details are to be furnished by the Bidder:
1. GST Registration No. Date/ issuing authority.
2. Details of Partners/Directors of the Firm/Company.
3. Experience Record and details of orders pending / executed for various utilities
4. Last three years Audited Accounts/IT returns
5. Electrical contractor’s license with latest validation.
6. PF registration along with proof of challan etc.
7. Solvency certificate from Bank (up to 20 % of Bid value).
7.0 Price Inclusions (including Taxes & Duties):
7.1 The prices quoted shall be all inclusive of freight, octroi, transportation, loading, unloading & stacking
at site of equipment materials received from Transmission store GETCO Bharuch after observing all
store formalities of GETCO.
7.2 No extra payment toward any type of templates and erection tools /materials will be made.
7.3 GOOD & SERVICE TAX (GST):
The F.O.R. Destination prices are excluding GST and Cess as applicable which will be paid extra on a
given taxable goods and/or services within the original contractual delivery period. The amount and%
of GST and Cess as applicable should clearly be indicated separately. (GST/Cess means all applicable
Tax/Cess under GST Laws. GST Laws means IGST Act, GST (Compensation to the State for Loss of
Revenue) Act, CGST Act, UTGST Act and SGSCT Act, 2017and all related ancillary legislations).
You shall have to submit a C.A Certificate duly authorized Signatory of successful bidder, certifying that
you have not claimed Refund of any applicable GST and Cess, charged to COMPANY or shall not
claim any such Refund, on a future date, from the concerned Authorities and if, any Refund, in respect
of such GST and Cess, is claimed by you, it will be immediately passed on to the COMPANY, without
COMPANY making any specific Claim, for the same, either from the Department or from you.
The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST and Cess is
not mentioned clearly unless the bidder has opted for Composition Scheme under GST Act, which
should be clearly indicated in the price bid. COMPANY may at its discretion consider such offer with
presumption of highest applicable rate of VAT/GST/Cess prevailing when the price quoted is inclusive
of GST and Cess.
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of withdrawal/cessation of
the Supplier from Composition scheme during the tenure of the contract, the rate mentioned in the
price bid shall be final and any additional GST will have to be borne by the tenderer. In no case
additional amount towards tax or otherwise will be paid / reimbursed to supplier/contractor. Further
Statutory Variation clause will not be applicable in case of Supplier / Contractor has opted for
Composition Scheme under GST.
i. Contractor has to submit the GST Registration certificate.
ii. Contractor has to submit invoice/Challan as documentary proof with each RA bill & Final Bill and in
which it shall be specifically mention the nature of service &code SAC code under which the amount
of service tax GST payable by contractor and payable by GETCO (if any) without fail.
iii. GETCO will withheld the GST amount of contractor and it shall be reimbursed on production of
documents evidences of payment made by contractor
iv. The Contractor has to submit invoice to GETCO indicating following.
Name, address and GST registration no. of the service provider
Name and address of person receiving the service i.e. GETCO
Description and value of taxable service provided
The total GST payable thereon with bifurcation of GST payable by service provider and service
Rate and amount of taxes i.e. CGST/ SGST/ IGST/UGST
Place of supply along with the name of State, in case of a supply in the course of interState
trade or commerce i.e. Out of Gujarat Supply
Applicable SAC Code
Contractor has to also supply tax invoice as described under GST rules and
Regulation indicating GSTIN
v. Contractor has to provide Tax invoice in a standard format as per CGST act, CGST rules 2017 and
GST invoicing rules containing all details as provided in Act and rules. Contractor / Supplier has to
mention GST no. of GETCO i.e. 24AABCG4029R2ZC in the invoice invariably & failure of which
payment will not be made.
Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in acceptance of
tender only and any deviation in the same shall not be accepted. Further, any additional liability of GST
(later on due to wrong mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.) over and
above as charged in the invoice shall be borne by the Supplier/Contractor. However, any refund
received by the supplier / contractor on account of GST charged from the company; such refund shall
have to be passed on to the company, along with interest if any. Such refund along with interest needs
to be passed on suo-moto by the supplier / contractor.
Further, the Company has a right to recover the amount of GST along with penal interest at the rate of
15% per annum if GST charged is not paid / short paid to the government or fail to upload the details
or uploads inaccurate particulars on GSTIN portal by the Supplier / Contractor within the stipulated
time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision of
GUVNL’s statutory variation clause shall apply.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as applicable for
each item of Goods/Service. If not specifically mentioned, then COMPANY will have the option to take
the prices as exclusive of taxes and duties at maximum higher slab rates for the evaluation of the
Every bidder shall inform their GSTIN No. of the registered place(s) where from the bidder intends to supply
the goods /services, meaning thereby the bidder has to supply the goods / services from the relevant
declared / registered place of
supply only
INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of any other
additional item of their inputs / input services under the ambit of the Input Tax Credit provisions under
the GST Act, subsequent to the date of submission of the offer, the same should be passed on to
COMPANY and you should inform such changes to COMPANY from time to time.
TDS UNDER GST:
Tax deduction at Source (TDS) under GST at the prevailing rate will be deducted from bills in accordance
with the provision of Section 51 of the CGST Act, 2017 and to that effect a certificate will be issued to
the party.
Goods and Service Tax Compliances (GST):
The GST at the applicable rates will be levied on the total of Schedule-B. GST on the work
executed will be subject to CGST Act, SGST Act, IGST Act, UTGST Act its rules, regulations and
notifications, circulars issued and in force time to time by Government and M/s. GETCO.
Contractors are required to clarify the product and services related HSN codes and SAC codes
respectively.
GETCO reserve right of re-classify, in case of mis-classification of goods and/or service (HSN/SAC
codes) Sec. 171 of CGST/SGST Act contains provisions related to anti-profiteering. On the basis
of same on introduction of GST, the Vendor should pass on the tax benefit/savings, if any, on
account of tax credits or lowering of tax rates to us by way of adjustment in the contract price. Non-
compliance of the
same may lead to levy of penalty by Government.
Contractor required to submit the invoice as per the standard formats/contents of GST laws
including invoice ruling. GST will be reimbursed subject to proper/ valid matching of
transactions/invoices on GSTN (GST network).
The contractor is abiding by the all rules and regulations of corporation and amendments, which
may publish subsequently for compliance by field offices with respect to GST Laws.
7.4 Statutory Variations:
Any statutory increase or decrease in the taxes and duties including GST and Cess as applicable or in
the event of introduction of new tax/cess or cessation of existing tax/cess subsequent to suppliers offer
if it takes place within the original contractual delivery date will be to COMPANY’s account subject to
the claim being supported by documentary evidence.
However, if any decrease takes place after the contractual delivery date, the advantage will have to be
passed on to COMPANY. Statutory Variation clause will not be applicable in case of Supplier /
Contractor has opted for Composition Scheme under GST.
7.5 Income Tax
Income tax at source at the prevailing rate will be deducted from bills in accordance with the provision
of Income-Tax Laws and to that effect a certificate will be issued to the contractor.
7.6 Welfare Cess
As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply and erection items for
supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey projects and
civil works.
Contractor shall get registered under Welfare Cess Act before commencement of work. Office of the
Factory Inspector is authorized at present as a registering authority.
The welfare cess@1% is considered in the price schedules so, the bidders are requested to quote
accordingly.
GETCO shall pay the welfare cess by way of reimbursing to contractors on production of documentary
evidence of payment.
The contracts for which supply or part supply of material are in the scope of GETCO, then contractors
shall deposit welfare cess on estimated cost of supplied items to GETCO on progressive basis of
utilization. As this part of welfare cess is on GETCO account, the same shall be reimbursed to the
contractor on receipt of request letter along with documentary evidence of payment. For calculation of
welfare cess on supply part, valuation as per MR shall be taken and informed to the contractor for
payment. This will be over and above the A/T value.
In case of EPC contracts covering supply, erection, testing & commissioning, the supply portion shall
also be considered for calculation of welfare cess.
If GETCO purchases material on its own without any reference to the estimate contract and gives/hand
over the material to the contractor for erection, testing & commissioning, then welfare cess on
procurement cost of the equipment of material shall also be applicable. Procedure same as narrated
Periodically, the evidence regarding filing of return and maintaining record as per the Act by the
contractor shall be verified by GETCO.
The modality of payment/ reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and submit
the documentary evidence to the concern office.
Before release of payment of first R.A.Bill, the contractor has to submit the documentary evidence of
registration. Only thereafter, the bill will be processed for payment.
Before release of payment of subsequent R.A.Bills, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill.
Before release of payment of final bill, the contractor has to submit documentary evidence of payment
of welfare cess of previous R.A.Bill as well as of this final bill.
If the R.A.Bill happens to be first and final bill, then before release of payment, contractor has to submit
documentary evidence of registration under Welfare Cess Act and evidence of payment of welfare
The welfare cess shall be reimbursed to the contractor on submission of copy of documentary
evidence of payment by observing due formalities.
8.0 SECURITY DEPOSIT
8.1 The successful bidder has pay security deposit within 10 days of receipt of LOI.
8.2 The successful bidder will be required to pay an amount equivalent to 5 % of the value of the order as
a Security Deposit for satisfactory execution of the contract. Such Security Deposit will be payable
either in online mode /Bank guarantees from following Banks will be acceptable.
8.3 If the Contractor defaults in execution of the orders placed or if COMPANY suffers any financial loss due
to this, then COMPANY will be forfeited Security Deposit, EMD plus GST as applicable from other
orders of the same firm or by encasing the Bank Guarantee
(A) Guarantees issued by the following Banks will be accepted as SD/EMD on permanent basis.
1. All Nationalized Banks
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the period up to March-
2027 or the issuance of new Government Resolution on the same subject whichever is earlier.
The validity cut-off date in GR is with respect to date of issue of Bank Guarantee irrespective of date of
termination of Bank Guarantee.
1. Axis Bank
2. AU Small finance bank
3. Bandhan bank
4. City union bank
5. CSB bank
6. DBS Bank Indiia limited
7. DCB Bank
8. Dhanlaxmi Bank
9. Equitas Small Finance Bank
10. FEDERAL Bank
11. HDFC Bank
12. HSBC Bank
13. ICICI Bank
14. IDBI bank
15. IDFC First bank
16. Indusland Bank
17. Jammu & Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka bank
20. Karur Vysya bank
21. Kotak Mahindra Bank
22. RBL Bank
23. South Indian Bank
24. Standard Charterd Bank
25. Tamilnadu Mercantile Bank
26. Ujjivan small finance bank
27. Yes Bank
28. Ahmedabad Mercantile Co-Op. Bank
29. Nutan Nagrik sahkari Bank ltd.
30. Rajkot Nagrik sahkari Bank ltd.
31. Saraswat Co-operartive bank
32. SBPP Co op bank
33. SVC Co-operative Bank Ltd.
34. The Cosmo Co op Bank
35. The Gujarat State co-operative bank
36. Surat District Co-op bank
37 Surat people’s Co-op. bank
38. Baroda Central Co-Operative Bank
39. Panchmahal Dist Co-Op Bank
40. Kalupur commercial Bank
41. Rajkot commercial Co-op Bank
42. Banaskatha Mercantile Co-Op Bank
43. Gujarat Gramin bank
8.4 No interest will be allowed on amount of Security deposit.
8.5 The Security Deposit- total shall be kept deposited up to completion of work finalization of final bill. The
same shall be return on receipt of N.O.C. by the concerned DE after observing GETCO’s procedure.
8.6 This security deposit is for the performance of contract and the same is liable to be forfeited by the
GETCO in event of non-fulfillment of the term and conditions of this contract by the contractor.
8.7 Corporate Guarantees are not admissible.
8.8 The ‘Signing of Contract ‘ and ‘ Contract Agreements’ will be done as per prevalent GETCO Terms and
Conditions.
9.0 GUARANTEE PERIOD:
Total work executed shall be covered under guarantee period against any defect in poor workmanship
etc. for a period of one year from the date of commissioning.
10.0 PENALTY FOR DELAY:
10.1 The tenderer should note that the completion time allowed for carrying out the work should be strictly
observed. Any delay that may take place in supply and erection beyond Contractual cutoff date stated
as per stipulated delivery period shall be subject to the penalty at the rate of ½ % of the contract value
per week plus GST of delayed work or part thereof, with a ceiling of 10 % of the total contract value
10.2 The penalty will be deducted from bills payable either against this contract or from any Bank
Guarantee or any other amount payable under any other contract with the GETCO.
10.3 If the contractor fails to complete the job in stipulated time period/leaves the site with incomplete work,
GETCO will get the remaining work executed at the risk & cost of contractor.
11.0 COMPLETION PERIOD
11.1 Overall period for this Contract will be 120 days from the date of commencement.
11.2 No mobilization period, idling or stoppage period will be allowed during this period of the Contract.
11.3 The completion date will be deemed to be the date on which all works on the Contract are
demonstrated to be complete to the satisfaction of the GETCO/Engineer and is complete in all respects
as per the terms and conditions of this Contract.
12.0 Presentation of Bills for s/s work
12.1 Monthly RA bills for 90% value of the supplied tower material and work executed including cost of
material consumed is to be prepared in triplicate and submitted to Site Engineers in-charge of the
work, for necessary payment. These bills shall be serially numbered with suffix SE-I.
12.2 Balance 10% payment shall be released only after finalization of material account and passing of final
bill. The contractor has to submit the final bill along with the material consumption statement and other
required data of the work carried out within 3 months from the date of completion of work. These bills
shall be serially numbered with suffix SE-I.
12.3 All the bills in accordance with the above clauses must be submitted with the following information:
a) Item wise work done during billing period.
b) Item wise cumulative work done.
c) Account for material consumed and balance stock.
12.4 For non-submission or part submission of above information, an additional 5% amount of the
respective RA bill shall be withheld and shall only be released at the time of final bill.
12.A Presentation of Bills for line work
12.A.1 Bills for 90% value of the erection work carried out during each calendar month as per above
Clause shall be submitted in triplicate to Deputy Engineer (Const), In charge of the works at the
end of that particular month, who will in turn process the same and forward to Executive Engineer
(Const), In charge of the works, for necessary payment. These bills shall be serially numbered with
Suffix-E-1.
12.A.2 Bills for 10% value of the erection work done as per above clause shall be submitted to Deputy
Engineer (Const), in charge of the works, who will in turn process them and forward them to
Executive Engineer (Const). I/C of the work for necessary payment. These bills shall be serially
numbered with Suffix-E-2.
12.A.3 The Contractor has to submit the final bill along with all required data of works carried out within
months from the date of commissioning of the line. The concern Dy.Engr /Ex.Engr (Const) must
record and process the final bill along with complete material account. The material account shall
include the credit of dismantled materials.
12.A.4 All the bills (in accordance with above Clauses) must be submitted with following informations:
a. Item wise work done during billing period i.e., respective month.
b. Item wise cumulative work done.
c. Account for tower materials & bolts-nuts, accessories consumed and balance stock.
d. Account of line materials consumed, wastages and balance stock.
For non-submission OR part submission of above information an additional 5% amount of the
respective RA. Bill will be withheld and released only after passing of final bill.
13.0 Terms of Payment
The payment for work done shall be made as under only after execution of the contract
documents/furnishing of Security Deposit and on execution of substation erection work in scope of
work order.
13.1 For erection works of s/s.
(i) 90% payment of amount claimed covering various activity such as structure, equipment
erection, earthing installation, control wiring, battery charging etc. works against R.A. bills duly
certified by EIC within 60 days from the date of R.A. bill.
(ii) Balance 10% of erection value shall be paid against completion of work only after settlement of
material account statement of items used, erected and successful commissioning of
transmission line the same amount will be release in final bill only and payment will be made
only after passing of final bill.
13.A For erection works of line
13.A.1 Payment shall be made as under:
Up to 90% of the total value of the erection work done will be paid against monthly running account
bills to be submitted to the Engineer-in-Charge of the Construction Division concerned.
Balance 10% payment due will be made at the end of 12 months from the date of handing over of
the line or 18 months after completion of the line to the satisfaction of the Superintending Engineer
(Trans), Bharuch at his absolute discretion whichever is earlier only after passing of final bill.
13.A.2 The payment of above balance 10% amount due will be made only after a material account
statement of items received and used or returned to stores is settled and passing of final bill. The
contractor must settle final bill within 3 Months from the completion date. Any discrepancy in the
quantities will have to be made good by the contractor or deduction of its cost as per The GETCO's
ledger value or market value whichever is higher, plus 15% supervision charges will be made while
settling the balance payment. This value of materials shall be prevailing on the date of submission
of the final material account to the GETCO.
13.2 PAYMENT TERMS UNDER MSME ACT:
(1) You have to update your MSME detail on GETCO’s website by following link
https://getco.co.in/msme/ (and intimate to concern bill submitting office with copy to this office).
(2) The payment will be made within 45 days from the *date of acceptance or the **date of as deemed
acceptance of goods or services i.e After submission of all required documents as per at terms &
time to time circular issued by GETCO’s corporate office as well as statutory requirement to
process the bill.
*Date of acceptance means-
(a) The day of actual delivery of goods or the rendering services or
(b) Where any objection is made in writing by the buyer regarding acceptance of goods Or services, the
day on which such objection is removed by the supplier.
** Date of deemed acceptance” means-
where no objection is made in writing by the buyer regarding acceptance of goods or services within
fifteen days to the delivery of the goods or the rendering of
services, the day of the actual delivery of goods or the rendering or services.
14.0 TAKING DELIVERY AND INSURANCE:
14.1 The contractor has to take delivery from Transmission store of S/S equipment and materials and keep
in safe custody and transport to the respective sites and will be fully responsible for any damage to or
loss of all materials at any stage during transportation or erection or taking over of the S/S by GETCO.
14.2 The Contractor has to open site store and ensure for safe custody of all the stored materials at his own
14.3 The Contractor shall have total responsibility for the entire materials stored, loose, semi assembled
and/or erected by him at site in his custody. The Contractor shall make suitable security
arrangements at his own cost to ensure the protection of all materials, equipment and works from theft,
fire pilferage and any other damages and loss. It shall be the responsibility of the contractor to arrange
for security till the works are finally taken over by the GETCO.
14.4 STORAGE-CUM-ERECTION INSURANCE: The contractor shall take suitable storage-cum-erection
insurance cover at his cost to the extent of 100 % cost of S/S materials, which are required to complete
the work. Bidder shall have to take the comprehensive Marine cum erection (MCE) insurance policy
against any loss, damage, theft, pilferage, fire etc. for the complete period of storage, erection and
commissioning up to the time of taking over of the work by GETCO. However, if the work is not
completed within the stipulated time limit as mentioned into work order, the MCE shall be
extended by the contractor up to the work completion and taking over of the line or S/S by
GETCO. Moreover, the charge for extension of insurance shall be borne by contractor if the
delay is attributed to the contractor. The charge for extension of insurance shall be reimbursed
by GETCO to the contractor on production of proof for extension of MCE if the delay is
attributed on the part of GETCO
The Contractor shall deal directly and pursue the claim with the Insurance Company and shall be
responsible in regard to maintenance of all insurance coverage as well as for settlement of claim. The
proof of insurance policy taken by the successful Contractor shall be furnished/submitted to Engineer-
In-Charge of GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance policy. The risk
shall be covered for lifting of materials from store to final handing over to GETCO. Further, in
absence of the above insurance policy, R.A. Bill payment will be withheld.
The approximate amount of the material required whose insurance is to be taken to complete the scope of
work is Rs. LAKHS
14.5 In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to lodge,
pursue and settle all the claims with the Insurance Company for all items, materials and the GETCO
shall be kept informed about it. Contractor shall replace the lost / damaged materials / items promptly
irrespective of the settlement of the claims by underwriter and ensure that the work progress is as per
agreed schedule. The loss, if any, such replacement will have to be borne by the Contractor and
GETCO will not entertain any claim / representation in this regard. However, it will be contractor's
responsibility to insure the entire project till the S/S is taken over by the GETCO.
15.0 LABOUR LAWS:
15.0.1 Persons below the age of 18 years shall not be employed for the work. No female worker shall be
employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
15.0.2 Contractor shall maintain a valid labour license under the contract Labour (Regulation and abolition)
Act for employing necessary manpower required by him. In the absence of such license, the contract
shall be liable to be terminated without assigning any reason thereof.
15.0.3 The Contractor shall at his own expenses comply with all labour laws and keep the GETCO
indemnified in respect thereof. Some of the major liabilities under various labour and industrial laws
which the Contractor shall comply with, are as under:
i) Payment of contribution by way of Employer’s Contribution towards provident Fund, Family
Pension Scheme, Deposit Linked Insurance Scheme, Administrative charges, etc. at the rates
made applicable from time to time by the Government of Gujarat / Government of India or
other Statutory Authority.
ii) Payment of deposit in respect of each contract labour at the rate of Rs. 30/- or later prevailing
rate with the Office of Commissioner of Labour as per the Contract Labour (Regulation and
Abolition) Act.
iii) License fee as prescribed under the Contract Labour (Regulation and Abolition) Act and Rules
framed there under depending upon the number of workmen.
iv) Paid leave facility and wages as per the provision of the Factories Act at the rate of one day for
every 20 days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed thereto, for
identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per Industrial
Dispute Act. Any payment to the Contractor’s employee arising out of any claim of disputes
under the Industrial Disputes Act 1947 or any other Labour Laws.
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities prescribed
under the various labour laws, in force from time to time, from Statutory Authorities like State
Government/ Government o India, which the Contractor shall have to comply with.
15.1 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding deduction against
employees Provident Fund and Family Pension Scheme in respect of each concerned employee.
Provident Fund and Family pension Scheme at the rate of 18% (or at the rate made applicable by the
Government from time to time of the wages. The Contractor’s contribution and his workers contribution
towards Provident Fund and Family Pension Scheme shall be deposited by the Contractor with
Regional Provident Fund Commissioner, Ahmedabad.
15.2 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is a member of the
Provident Fund, as the contribution to the Deposit Linked Insurance Scheme with Regional Provident
Fund Commissioner, Ahmedabad.
15.3 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by the Contractor
with Regional Provident Fund Commissioner, Ahmedabad at the rates applicable.
15.4 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract Labour, shall
be provided by the Contractor to his workers. He shall maintain Leave Records, Leave Cards, for
individual labourer, which shall be duly verified, approved and certified by the authorized Officer of the
15.5 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and under the
liability insurance. The purchaser shall not be responsible for any payments of compensation to the
workers/supervisor of the contractor for fatal or non-fatal accidents during the pendency of the contract.
15.6 The contractor shall employ adequate number of experienced skilled at site for daily supervision and
for maintenance of various registers and records required under the law and contract. No payment for
supervision shall be admissible.
15.7 CONTRCTOR TO INDEMNIFY THE GETCO:
The Contractor shall Indemnify the GETCO and every member officer and employees of the GETCO
also, Engineer-in-Charge and his staff against all actions, proceedings, claims, demands, costs and
expenses whatsoever, arising out of or in connection with the matters referred herein above elsewhere
and against all actions, proceedings, claims, demands, costs and expenses which may be made
against the GETCO or Government for or in respect of performance of his obligation under the contract
documents. The GETCO shall not be liable for intervention of authority Government for or in respect of
performance of his obligation under the contract documents. The GETCO shall not be liable for or in
respect of or in consequence of any accident or injury to any workman or other person in the
employment of the Contractor or his Sub-Contractor and the contractor shall indemnify and keep
indemnified the GETCO against all claims, demands, proceedings, cost, charges and expenses
whatsoever in respect thereof or in relation thereto.
15.8 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employee engages in the performance of this
contract. If any of the work is sublet, the Contractor shall require the Sub-Contractor to provide
workmen’s employer’s liability insurance for the latter’s employees, such employees shall be covered
under the Contractor’s Insurance.
15.9 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labours/ Workers as per rates fixed
under the minimum wages act. The wages of every Contract Labour employed by him under
this contract shall also be paid by him before the expiry of 7th day of the last day of the month
in respect of the wages are payable (i.e. wages of a month have to be paid by him in the first
week of the next month). Any default will result in cancellation of contract forthwith or else the
contractor shall be punishable to the extent of Rs. 100/- per each day or as per the prevailing
rules of labour laws.
b) The Contractor shall give his Telephone Number and Address to the GETCO, so that, in case
of labour trouble etc. the Contractor can be contacted. The Contractor shall arrange to have
his office outside the factory work premises and the Contractor shall arrange to have his office
outside the factory work premises and the Contractor shall keep himself present throughout
the working hours.
15.10 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken by contractor.
ii) If the contractor does not possess separate P.F. code number of RPFC, his tender will not be
considered for acceptance.
iii) The contractor should mention separate P.F. code number allotted by PPFC, along with the
15.11 Termination of Contract:
In case of contractor fails to deliver the stocks or any consignment thereof within contractual
period of delivery or in case the stores are found not in accordance with prescribed specification
and/or the approved sample, the GETCO shall exercise its discretionary power either:
15.11.1 To recover, from the contractor as agreed, by way of penalty clause above, or
15.11.2 To purchase from elsewhere after giving due notice to the contractor on account and at the risk of
the contractor for such stores not so delivered or other similar description without canceling the
contract in respect of the consignment not yet due for delivery or
15.12 To cancel the contract.
In the event of the risk purchase of stores of similar description, the opinion of the GETCO shall be
final. In the event of action taken under clause (A) or (B) above, the contractor shall be liable to
pay for any loss which the GETCO may sustain on that account, but the contractor shall not be
entitled to have any saving on such purchases made against default.
The decision of the GETCO shall be final as regards to the acceptability of stores supplied by the
contractor and the GETCO shall not be required to give any reason in writing or otherwise at any
time for rejection of the stores.
15.12.1 MATCHING OF END COST:
In case the GETCO decides to award contract on matching end-cost basis, the bidder has to
reduce all the quoted rates proportionately. The reduction on overall basis will not be accepted
(i.e. all unit rates of erection schedule shall be reduced proportionately by difference in
percentage). The confirmation for matching end cost shall be given within 7 (seven) days from the
letter from GETCO.
16.0 VENDOR REGISTRATION:
REGISTRATION AS A CONTRACTOR:
Registration with GETCO is pre requisite for participating in tender. It is required to furnish
documents of registration along with offer in Technical bid and the details at appropriate place in
confirmation of details of bidder shall be given by the contractor
17.0 Placing Vendors/Contractors for Purchase/Works in a Stop deal/Banned for business
dealing/blacklisting:
1.1. Stop deal / banned for business dealing / blacklist means debarment of parties from
participating in the tendering process.
1.1.1. Firm will mean Bidder / Licensor / Tenderer / Consultant / Vendor / Contractor.
1.1.2. Reasons for Putting a Firm on Stop deal / banned for business dealing /
blacklisting, is to protect the GUVNL and its subsidiary Companies from dealing with
undesirable firm.
1.2. The list of indicative reasons for placing the firm in a Stop deal / banned for business dealing /
blacklist are as Under.
A Firm will be placed in a Stop deal / banned for business dealing / blacklist, if the Firm-
1.2.1. Has submitted fake, false or forged documents / certificates,
1.2.2. Has revised / withdrawn price bid after opening of Techno – commercial bid,
until and unless it is sought for,
1.2.3. Has tampered with the stipulated tendering procedure.
1.2.4. Has refused to accept letter of Acceptance / purchase Order / Work Order after the same is
issued by the Company within the validity period and as per agreed terms and conditions,
1.2.5. Has committed breach of contract or has failed to perform a contract or has
abandoned the contract,
1.2.6. Has failed to provide suitable expertise for the work as per per-scheduled
1.2.7. Has failed to submit all the necessary tests reports / documents within time schedule/ as per
company’s time limit, as mentioned in the LOI, if the letter of Acceptance (LOA) is placed
subject to submission of type reports / documents to the firm.
1.2.8. Has indulged in construction and erection of defective works.
1.2.9. Has supplied inferior quality / defective materials and refused to replace with stipulated time
frame, as specified by the company,
1.2.10. Has substituted materials in lieu of materials supplied by the company or has not returned or has
short returned or has unauthorisely disposed of materials / documents / drawings / tools or
plants or equipment supplied by the Company,
1.2.11. Has involved in malpractices such as bribery, corruption, fraud, canvassing and pilferage,
1.2.12. Has unauthorisely obtained official company information or copies of
documents, in relation the tender / Contract.
1.2.13. Has failed to follow the stipulated mode of communication, if specified by the tendering
authority / purchaser.
1.2.14. Has parted with, leaked or provided confidential / proprietary information of the Company given
to the firm only for its use (in discharge of its obligation against an order) to any third party
without prior consent of the Company,
1.2.15. Any other ground for which in opinion of the company makes it undesirable to Deal with the
1.2.16. In case the State Government directs the Company to place a firm in stop
dealing / banned for business dealing / banned for business dealing /
blacklisting.
1.3. Every bidder should at the time of submission of bid, give a declaration that bidder and / or
proprietor / partner / Director of the firm has not been placed on stop dealing / banned for
business dealing / blacklisting by GUVNL and It’s any subsidiary Companies as per Revised
ANNEXURE-14
18.0 CERTIFICATE
Sub.: Work of erection of 66KV equipment, Structures, Control wiring, Yard Lighting, Control-
Room, Staff-Quarter Electrification & Supply of Furniture etc at 66 KV Achhod S/S &
associated Line S/S under construction Division Bharuch
In connection with above subject, I / we confirm the following:
a) I/ we, the undersigned, have read and understand the Tender No. TCBRH/26-27/2612
For Work of erection of 66KV equipment, Structures, Control wiring, Yard Lighting, Control-Room,
Staff-Quarter Electrification & Supply of Furniture etc at 66 KV Achhod S/S & associated Line S/S
under construction Division Bharuch complete with all the tender Terms and Conditions.
b) The price in the bid is firm prices in line with Tender Specifications and shall stand valid till completion of
the Contract, if awarded.
c) I/We declare that our bid is strictly in line with Tender Specifications and there is no deviation. Further, I /
we also agree that additional conditions / deviations, if any found in bid, the offer shall be out rightly
rejected without assigning any reason thereof.
Signature of Authorized representative
of Company / Agency
STATUS: ______________________
Name of BIDDER
19. The GETCO reserves the rights of interchanging and dismissing any person employed for the work if there
is complaint against his misbehavior, misconduct or disloyalty towards job.
20. Terms and conditions regarding industrial laws and other related matters shall be complied by the
contractor in all respect.
21. The contractor shall ensure that all persons have provided safety tools, shoes, hamlets etc. as may be
required for safety point of view and all his persons shall follow the instructions issued by the GETCO from
time to time in concern with the safety and security as the work to be carried out.
CONFIRMATION OF DETAILS OF BIDDER
Bidders are required to furnish following information & should place on top of technical bid specifying
1) Whether the Bid is on percentage basis as called for. Yes / No
2) Whether rebate furnished is in percentage basis as called for. Yes / No
3) Whether the Bid is submitted by RPAD/Speed post. Yes / No
4) Whether all pages of Bid Specifications are sealed and signed by Yes / No
the Bidder.
5) a) Whether the Bidder is registered with GETCO Yes / No
b) In case of “Yes”, please furnish following details:
i) Registration Letter No. & date.
ii) Class of Registration
Iii) Validity
c) Whether Bidder is having PF Code No. Yes / No
6) a) Whether EMD paid. ( DD / BG ) Yes / No
b) In case “Yes”, furnish details
7) Whether following documents as specified are submitted.
a) Human Resources detail. Yes / No
b) Availability of tools, equipments etc. Yes / No
c) Details of orders executed / on hand Yes / No
d) Financial capability. Yes / No
e) Experience as specified. Yes / No
f) Latest Income-tax certificate Yes / No
g) Company's Articles Of Association Yes / No
h) Details Of Partners / Directors Yes / No
i) B.R./P.A. Authorizing Person Yes / No
j) Power of Attorney of Consortium Members Yes / No
8) GST [IN PERCENTAGE] Yes/ No
Please quote your GST Registration No. & Date.
9) PENALTY TERMS AGREE Yes/ No
10) SECURITY TERMS AGREE Yes/ No
11) PAYMENT TERMS AGREE Yes/ No
12) Completion Period Agreed Yes/ No
13) TELEPHONE NOS. & FAX NO. & e-mail ID
14) AUTHORISED PERSON OF THE FIRM:
15) NAME OF THE PROPRIETOR, PARTNERS, DIRECTORS
[AS THE CASE MAY BE], ALONG WITH ADDRESS, TELEPHONE, FAX NO. etc.
Signature of Authorized Representative of
Company/Agency
STATUS:________________
Name of tendering company
PART – II
TECHNICAL PARTICULARS FOR ERECTION OF EQUIPMENT AT SUB-STATION
3.1 SCOPE:
3.1.1 The scope for erection works covered under this section consist of :
i) Taking delivery of equipments and other material from the Board’s stores, checking them,
transporting to site's stores and keeping in safe custody by contractor.
ii) To take suitable storage-cum-erection insurance of equipments/materials issued by the
iii) Distribution of all materials to erection site at 66kv Sub Station.
iv) Structure/Equipment erection including fixing of attachments, accessories and tack-welding
of structures.,
v) Stringing of ACSR/AAAC Panther conductor bus with fixing of insulators, Hardware,
dampers, spacers etc.
vi) Workmanship guarantee of all the activities carried out from (i) to (v).
3.1.2 The successful Contractor shall carry out all addition/alteration required to complete the transformer
for commissioning.
3.1.3 The Board will supply equipments, structure materials, bolts-nuts, structure accessories/attachments,
insulators, insulator-hard wares, conductor, accessories, ground wire, ground wire accessories,
Control cable etc. required for erection of equipments and other associated works.
3.1.4 All works shall be carried out in accordance with the revised and latest
Provisions under Indian Electricity Act and Rules made hereunder.
3.1.5 The contractor at his own cost shall arrange all the erection tools required during execution of work.
The Contractor solely is responsible for any damage and / or loss of his erection tools.
3.1.6 The Contractor shall be fully responsible for completing all the above works till the complete
transformer is taken over by the Board, and thereafter up till guarantee period.
3.1.7 The methods of erection are not dealt with in detail but are left to the Contractor who shall exercise his
own judgment with regards to actual handling of equipments & materials and in deciding upon the best
methods to be adopted for all the erection activities.
3.1.8 The successful bidder shall carryout all the erection works in accordance with structural drawings, and
other erection drawings etc. provided by the Board.
3.2 LAYOUT OF SUB STATION
3..2.1 The proposed layout of the substation is available with concerned field office. The bidders are
presumed to have acquainted themselves with the site before submitting their offer.
3.2.2 The successful bidder has to collect from concerned field office the detailed layout drawing along with
the following drawings for the substation duly approved by the Board immediately on receipt of the
Order. He shall also arrange visit of proposed site jointly with Board’s representative for important
marks coming across the scope of works under the contract. Structural drawings of 66 KV Structures
listed at Schedule –B
TECHNICAL INSTRUCTIONS TO THE BIDDER
3.3.1. The works shall be carried out strictly as per the erection manuals and shall fully comply with the
relevant Indian Standard. The IE rules and Acts in force from time to time shall also be applicable
during pendancy of the contract.
3.4. ERECTION AND COMMISSIONING TOOLS & TACKLES.
3.4.1 The contractor shall provide all tools/tackles, jigs and fixtures, winches, alignment tools, welding
sets, , breaker handling devices, all consumable items and Transmission equipment as required to
install the equipments and to complete the work in all respects and shall necessarily include (but not
limited to ) bolts, nuts, rivets, welding rods, shims, wedges, packing sheets, packing compounds, oil
installation and protection of individual equipment in storage and during erection.
3.4.2 This shall also cover proper alignment, tack welding tagging, laying marking of and connection of
cables, fabrication supply and installation of all support structures for installation of various electrical
equipment and cables
3.4.3 Provision of cable glands, ferrules, and cable lugs tags sealing kit (for HT cables) shall also be
arranged by the contractor.
3.4.4. Erection of various equipment shall be done strictly as per manufacturer's instructions
3.4.6 All additional iron framework erected to put the equipment in operational condition shall be provided
with two coats of primer and two topcoats of finish paint.
3.4.7 Special care shall be taken to make the enclosed equipment protected against entry of rates, lizard,
and creeping reptiles, which may create electrical short circuits.
3.5.0. COMPLETION OF ERECTION (GENERAL)
3.5.1. Equipment shall be considered to have been completely erected when the following
activities have been completed.
3.5.2 Moving of all equipments to the respective foundations
3.5.3. Fixing of anchor bolts or tack welding as required.
3.5.4 Leveling and alignment of equipment.
3.5.5 Assembling of all accessories such as relays, CTs, PTs, meters instruments etc. as
described in the job specifications.
3.5.6. Drying of equipment as required and testing of oil for dielectric strength.
3.5.7 Filtration and filling of oil as required.
3.5.8. Cable laying, termination with continuity checks.
3.5.9. Applying of finishing coat of pain wherever required.
3.5.10. Mounting of lighting fixtures & connections.
3.511. Testing of all system with operation of all protection system.
3.60 ERECTION OF SWITCHYARD STRUCTURES.
3.6.1. Erection of switchyard structure shall mean erection of gantry column, beams, equipment support
structure and lighting mast, VHF masts, watch and ward observation posts if any.
3.6.2 The foundation work of switchyard structure is not in the scope of this tender. The foundation with
concreted anchor bolts shall be made available by GETCO well in time to enable the contractor of
this work to get a clear working front.
3.6.3. The switchyard structure shall be made available to the contractor in the knocked down condition
either at site or from any other store of GETCO in the radius of 100 KMs. Small parts like cleat, plate
fasteners step bolts and other accessories (if any) shall also be supplied as above separately
3.6.4. Before commencement of the erection work, the contractor shall check cast foundations and anchor
bolts for their individual and mutual distances and also for the correctness of concreted bolts in terms
of number and verticality. In case of any disagreement with the lay out drawing, the matter may be
referred to Engineer in charge for remedial measures who in turn will arrange such remedial
measures. However, the contractor shall also render necessary assistance in the matter.
3.6.5. The erection of structure shall be done strictly as per the approved set of structural drawings to be
given by the GETCO. The erected column for bringing the structure in alignment or bringing the
structure in plumb shall be allowed.
3.6.6. The erection of column/beams shall be done in phased manner on already erected column. The
elevation faces of the beam should be first fastened to the column one by one and thereafter plan
bracings should provide one by one to complete the beam geocentric Pre-stressing of beam member
for alignment should be avoided. In case of difficulty in fabricated material or otherwise, the Engineer
in charge should be contacted for remedial measures who in turn will take necessary action.
However, the contractor shall also render necessary assistance in this work to Engineer in charge
for speedy completion of work. The load points rings bracing shall also be provided as per drawings.
3.6.7. The Cross-connected beams should be perfectly at right angle and matching with respective faces of
the column. No column or beam shall be erected with missing members.
3.6.8. The method of erection is not being dealt with in detail here. However, while making the rigging
arrangement, it should be ensured that no column beam or part thereof is damaged due to
misjudgment. All the members, plates, cleats, bolts, buts and other accessories should be fitted to
the column, beam support structure as per the approved drawing.
3.6.9. After the erection of beam and column, the bolt nuts should be properly tightened and center
punched. The thread protruding bolt should be dented in the contact surface of nut at 3 point
degrees apart to eliminate loosening of bolt due to vibration. The stringing of bus bar conductor be
done only after getting certificate from Engr. in charge that all bolts &nuts are provided as per
approved drawings and tightened.
3.6.10. The equipment support structure should also be erected like gantry column. They should well be in
plumb with all members fitted as per approved drawings and bolt nuts properly tightened. The
contractor shall also take care to see that the alignment of foundation of equipment support structure
is well done. The equipment support structures shall be erected as per the approved drawings.
3.7 GANTRY STRINGING (BUS BAR STRINGING)
3.7.1 After the erection of gantry structure and equipment support structure is over, the contractor shall
take up bus bar and line gantry structure stringing.
3.7.2. The configuration of bus contractor shall obtain type of conductor to be used from the purchaser well
in advance. The sag and tension of the bus bar conductor and line conductor shall be coordinated
with the help of EIC so that a mutual distances of the strung conductor and the ground clearance of
the strung conductor does not cross the limit set out in the electricity rules and acts.
3.7..4. The method of handling the conductor accessories is not dealt in details, however, contractor can
himself get informed about the same and see that conductor and other material is handed over
properly and is string scratch free to the extent possible. No joint or use of repair sleeve will be
permitted in the bus bar and line gantry stringing. While stringing between twin and quadruple bundle
conductor, care shall be taken to keep tension in all sub conductors equally. Adjustment in the sag
shall be carried out by sag adjustment plate if provided in the tension insulator strings.
3.7.5 All the insulator strings to be used on the structure shall be properly cleaned with the cloth.
Compression dead end joints of the conductor shall be made after proper marking. There should not
be any difference in the position of dead end compression joints amongst the sub conductors of a
twin or quadruple bundle conductors. All the tension insulator string shall be double tension type. The
pilot insulator string or a guide insulator string shall be single suspension type. The corona control
ring space clamp and other accessories if any on insulator stringing shall also erected as per the
3.7.6. The earth wire to shield the conductors from lighting stroke shall be provided along the column in
each bay of the switchyard and across, as per the switchyard layout and sectional view drawing and
as per the instruction of Engineer in charge. the earth wire shall be fitted with all accessories like
suspension clamp, tension clamp cross by clips, copper earth bold etc. completed. No mid span joint
shall be permitted in the switchyard earth wire stringing.
3.7.7. After the bus bar and line gantry stringing work is over, the contractor shall provide droppers for the
equipment connection to bus bar or line conductors by using prescribed clamps and connectors the
configuration of dropper shall be obtained by contractor from the GETCO as per requirement. The
dropper is to be provided with ACSR Panther conductor.
3.8 ERECTON OF SECONDARY EQUIPMENTS.
3. 8.1. The secondary equipments like PI, CT, CVT, PT, LA (Surge arrestors) wave trap etc. shall be
procured by the contractor from the site store centre or other store centers of the GETCO and
transported to the site at the cost of contractor. The contractor shall also do loading and unloading of
the equipment.
3.8.2 After the arrival of equipment at site, packing shall be gently removed without causing any damage to
the equipment. The equipment shall be checked for its correctness of dimension, make etc. as per
the approved drawing. The equipment then shall be cleaned by a piece of cloth and made ready for
3.8.3. The equipment shall be mounted on the ready pedestal (of masonry) or steel structure as the case
may be and checked the same for its verticality. Transmission of masonry pedestal is not in the
scope of this work.
3.8.4 In case of CT, PT and CVT, the junction box or terminal box of the equipment shall be opened,
cleaned and all their connections should be checked.
3.8.5 The arcing horns or corona control rings shall be provided as per the approved drawing. Similarly all
fittings etc. shall also be provided as per the approved drawings
3.8.6 The electrical connection of the equipments through jumpers or through 4" aluminum pipe shall be
carried out along with the cable connection of respective equipment to the marshalling kiosk or to the
control relay panels. The connection of high voltage terminal of equipment shall not be resorted to,
unless secondary connection or cabling work to control equipment is over. Testing of equipment shall
also be done to ensure the correct wiring sequence of the equipment and continuity before
energizing equipment by EHV
3.8.7. Polarity of the equipment to be connected on HV side should be checked prior to erection. The oil
level (if any) of the equipment should be checked for its totality. If level is found to be inadequate,
topping filling of oil should be resorted. The GETCO will supply the quantity of oil required.
3.8.8 Fuse, links, etc provided in the secondary box of the equipment shall be checked for their position
and continuity and any lacuna observed will be set right before taking the equipment for commercial
3.9 ERECTION OF CIRCUIT BREAKER :
3.9.1 The circuit breaker shall be taken delivery from the site/other stores of GETCO and transported to the
work place well in time on loading/unloading. The crates containing the insulators and important parts
and accessories shall be opened carefully keeping them in their proper position. Insulator parts and
other accessories shall be thoroughly cleaned for any deposits of dust or other particles.
3.10. The breaker shall be brought on the pedestal of masonry or steel frame as the case may be) in
upright position without any inclination. The main parts of the equipment’s shall be assembled as per
approved drawing to be submitted by GETCO. The GETCO arrange Service of commissioning
engineer of circuit breaker manufacturer. However, the contractor will not remain contended with the
instruction and guidelines given by the commissioning engineer and shall also use his own judgment
in better erection of commissioning practice of circuit breaker.
3.11 After the placement of circuit breaker in position the kiosk of the breaker shall be thoroughly
inspected and any lacuna found shall be reported to the EIC of the work. The HT terminal connection
shall be done only after the terminals of the equipment kiosk are made to the marshalling kiosk and
or to the control/relay panels. Polarity of the equipment’s shall also be ensured before physical
3.11.1 The method of erection of breaker is not dealt with in details; however, it is recommended that
breaker poles shall be erected only by using telescopic crane or other suitable mechanical
arrangement. The rigging should be tool proof.
3.12 The operating mechanism in the breaker Kiosk and contacts as well as the power supply circuits
(AC/DC) shall be properly checked for its operation worthines. All piping for gas/air shall be laid as
per the approved drawing. The air receiver or compressor shall be positioned as per the relevant
drawing. Minor fittings and fabrication or grouting work required to place these articles or accessories
shall be done by the contractor without any extra cost to the purchaser. In case of breakers with
spring mechanism the trials of the mechanism by actuating should be done to ensure its' line
worthiness.
3.12.1 EHV side of the breaker should be aligned to a incoming and outgoing bus conductor. While erecting
the breaker, the operating mechanism without the porcelain insulator should be laid perfectly to avoid
any mal functioning of the breaker.
3.12.2 Earthing points of the breaker as well as attached Kiosk shall be connected to earth grid by means of
risers already available nearby the equipment. Any other erection checks and pre-cautions indicated
in the Manual furnished by the respective supplier of the equipment shall be studied well by the
contractor and the provisions there of shall be implemented as far as possible.
3.13. ERECTION OF POWER TRANSFORMER
3.13.1 The purchaser laid readily on the rails and plinth shall make a power transformer of appropriate
capacity available. However, the contractor using proper tools shall do minor adjustment or shifting
requirement for proper alignment of the equipment and tackles jacks taking due care.
3.13.2 Bushing of HV, LV, and IV side shall be picked up from the site or other store of the purchaser and
shall be made open by removing the casing/covers and packing whatsoever may be. The bushing
shall be cleaned by the cloth. The bushing shall be handled very carefully and preferably should be
opened and erected in presence of the Engineer in charge or his authorized representative. Before
taking up the erection work of bushing and accessories, conservator tank and the transformer tank
should be thoroughly cleaned from outside to remove all dust and other material deposited on it.
3.13.3. For fixing the bushing, the opening provided on the transformer tank/turret shall be removed and
bushing should be connected to it. The current transformer and other accessories in the turret should
be carefully handled while erecting bushings.
3.13.4 The radiators should be mounted on the pedestals already available at site. The proper leveling and
alignment of the radiator should be done. Any minor nature of civil or foundation work, if required
should be done by the contractor at his cost. However, if already provided pedestal are totally
misaligned and it is not possible to erect radiators upon it with slight modifications, the matter should
be brought to the notice of Engineer in charge who will take appropriate action to remove the
anomaly. As a matter of fact, the contractor may, before taking up the erection work on hand, satisfy
himself that the alignments of pedestal provided for various radiator and piping headers are as per
the approved drawing from the respective supplier of transformer and remedial measures should be
taken much ahead of actual erection work.
3.13.5 The Kiosk of the equipment shall be inspected for its internal wiring fuse, link temperature indicator,
de-humid fire power connection, control circuits etc. If any deviation compared to the approved
drawing is observed, the matter should be brought to the notice of Engineer in charge and if it is of
trivial nature, corrective measures should be taken by the contractor himself. All the piping or wiring
from various measuring points to the Kiosk should be checked for its trueness and continuity.
3.13.6 Buchholz relay will be erected on the transformer tank as per the standard practice.
3.13.7 After the erection of various accessories indicated above, filling of oil under vacuum should be
started. If required random sampling and testing of oil being filled in should be carried out. The oil
level in the conservator tank, condenser bushing etc. should be checked for its desired mark. After
the oil filling work is over, final filtration of oil to obtain desirable low PPM should be done. Filter
machine of 1000 GPH capacity having one pass facility of reputed make approved by Engineer in
charge for filling and filtration work shall be brought by the contractor himself.
3.13.8 Internal testing on the transformer and its accessories for operation worthiness shall be done
following oil filtration work. However, the commissioning of the transformer either from LV or HV side
should be done only after the installation of control panels in the control room, its connections to the
transformer and complete unit testing of transformer. The commissioning work should be done as per
the instruction of Engineer in charge or his authorized representative.
3.14.0 ERECTION OF ISOLATORS.
3.14.1 Isolators of the switchyard shall be with or without earth blade type centre breaks type etc. The
isolators shall be procured by the contractor from the site stores of the GETCO and transported
to the work site. All the spare parts shall be properly unpacked cleaned and made ready for
3.14.2 Before erection, the contractor shall obtain copies of approved drawing of respective equipments.
The isolators shall be erected on the ready galvanized structures. However, foundation for them
will be available readily the respective points in the switchyard.
3.14.3 The contractor shall check the erected support structure for their alignment vertically and tightness
of fasteners before mounting the isolators parts on them. The contractor shall also verify the
mounting arrangement for the operating mechanism on this structure and suitable for the same. In
case of any shortcoming the matter may be reported to engineer in charge. Any modification of
trivial nature for the structure of fixtures shall be carried out free of cost.
3.14.4 The parts of the isolators, fixed and moving contacts earthing rode etc. shall be handled very
carefully to avoid breakage or distortions. The erection shall be carried out using mechanized
erection tools. The polarity of the isolator polls shall be properly identified and also the direction of
the opening should be pre-determined. It should be ensured that in the entire switchyard the
isolator open and close uniformly (direction point)
3.14.5 The operating mechanism for the line contacts shall be thoroughly checked for their accessories
as per approved drawing and it should be ensured that all the connection fuses links dehumidifiers
lighting sockets electric motors are in their proper position. Any deviation from the approved
drawing should be got sat right with the help of engineer in charge. Position. Any deviation from
the approved drawing should be got set right with the help of Engineer-in-Charge.
3.14.6 While erecting the isolator, it should be ensured that it should be properly aligned with respect to
bus conductors or line conductors bus provided In the switchyard: The erected Isolator shall be
within the plumb. The operating mechanism rods, pole and rotating insulators shall be checked for
their proper function. The testing of the wiring to the kiosk should also be done to ensure its
operation worthiness. The final commissioning of the isolator should be done only after connection
to control panel is affected. However, prior to that it should be ensured that the physical
movement of the fixed and moving contacts and reach of them is within the prescribed limit.
3.15.0 ERECTION OF CONTROL AND RELAY PANELS.
3.15.1 The contractor shall procure the control and relay. panel from site store or any other stores of the
GETCO and transport the same to the erection site. The cases containing the panel shall be
unpacked carefully and shall be nicely cleaned. In case any of external damage is observed,
same shall be brought to the notice of Engineer In-charge. The panel shall be unpacked in upside
up position. After an external visual inspection, the panel door shall be opened and checked for
the circuit connection, terminal connector, dehumidifier, power connection etc.
3.15.2 A front side of the panel shall be checked for any damage to the meter indicator, hooter,
semaphore indicators
3.15.3 Any lacuna in the equipments, circuits, fittings, dimensions etc. observed shall be brought to the
notice of Engineer in charge who will try to impose remedial measures
3.15.4 The relay panel should also be checked for type, of schemes adopted for protection, internal
connection, fascia indicator etc. Any difference observed should be brought to the notice of
Engineer in charge who will take necessary action.
3.15.5 The panel shall be erected along cut outs provided in the slab concrete, in the order, it is decided,
by Engineer in charge or which is approved by authorized drawing.
3.15.6 The size and number of cores of cables be brought from the equipment to control panel, control
panel to relay panel and back to equipment shall be pre-determined by study.
3.15.7 After the erection of control panel and relay, panel, all the equipments, accessories indicators etc.
along with the internal wiring and other accessories provided with the kiosk of the panels.
3.16.0 LAYING OF CONTROL CABLES AND TERMINATIONS THEREOF
3.16.1 Laying and termination of control Cable work shall generally includes following:
a) Control and power cable from individual equipments kiosk to the field kiosk.
b) Laying and termination of Control and L.T power cable from field -kiosk to control room equipment
(i.e. LT switchgear, DC battery and control panel/relay panel.)
c) Laying and termination of Cable from the transformer kiosk to transformer panel and upto AC/DC
supply source.
d) Laying & termination of Control cables from control panel to relay panel and vice a versa.
e) Laying & Termination of cable from DC/AC source, battery room L/T switch gear room to
control/relay panel.
g) Laying & termination of cable from 11KV/400 V Distribution transformer to LT switch gear room.
h) Laying & termination of cables from Station transformer to distribution transformer in the
switchyard as well as in the residential. quarter area.
I) Laying & termination of LT power cable from station transformer to fire protection system kiosk (If
required).
3.16.2 GETCO will provide the cable schedule for the various control schemes, protection schemes and
metering scheme as well as communication, scheme etc.
3.16.3 ‘The contractor shall transport the required size of control and power cable from the purchaser’s
site store to any other stores from where the same allotted and transport it to its site store.
3.16.4 The control cables shall be terminated using correct type of lugs and further prodded with ferules
giving the identification number of various cores of the cable. Correct type of tools for termination
shall be used to secure a rigid connection of the cable tray along with the cable trenches.
Normally mild steel, racks and cable trays are provided in the cable trench. However, the
purchaser may it its’ own discretion prefers to utilize fiber reinforced poly propylene (FRP) cable
racks and trays. In such an event, the racks and trays, will be supplied by the Purchaser to the
contractor in a knocked down condition. The contractor shall assemble the rack and provide trays
on them as per the approved drawing given by the purchaser. If FRP trays and racks are to be
utilized, the contractor will have to take extra care while laying the cable through different layer
and racks to avoid any displacement or distortion of the FRP racks. However, if the laying of
pre-fabricated FRP racks and trays fall in the scope or FRP rack/tray supplier, the contractor shall
co-ordinate and synchronize his cable laying activities with respective supplier of FRP rack/trays.
3.16.5 Utmost care shall be taken by the contractor to prevent damage to outer insulation and the armors
of the cables. No joint to the cable shall be permitted. unless situation so warrants and Engineer in
charge permits the same.
3.16.6 After laying, all the ‘power and control cable shall be properly identified giving the serial either a
number and details of end connections.
3.17.0 ERECTION OF BATTERY AND BATTERY CHARGER
3.17.1 The contractor shall procure the material required for installation of batteries sets and battery
charger from the site store or any other stores of the Purchaser and transport this material to the
work site.
3.17.2 All the container/packing of the battery and battery charger shall be opened carefully to prevent
any damage to the equipment. The equipment than shall be cleaned to remove any dust or other
un-warranted deposition. The battery rack shall be placed in such a fashion that rows of battery
cell can be conveniently connected to each other. The contractor shall obtain the drawing of
arrangement of battery racks and its connection to floats charger and boost charger with reference
to the floor space. The battery cells shall be filled with requisite amount of electrolyte with proper
specific gravity and up to the mark of maximum-level indicated on the battery cells. All the cells
shall be connected in the series to obtain total voltage of the 224V AC. However, individual cell
shall also be checked for their voltage across terminal before series connection.
3.17.3 The battery rack shall be provided with bottom insulating material to prevent any leakage of
current to the earth. Similarly, individual battery cell shall be provided with insulation supports to
wooden rack to prevent any body leakage. The purchaser shall supply wooden racks and acid
distilled water etc.
3.17.4 The connection. of the battery shall be done through a cable. and same shall be terminated in the
LV room (AC/DC) before commissioning of the battery and battery charger. The entire battery
room shall be completely cleaned. Similarly racks and. battery cells shall also be cleaned for any
deposits of electrolyte and other particles.
3.17.5 A connection of boost charger shall be secured from the AC supply provided in the LT switchgear
3.17.6 All the accessories supplied for measuring the specific gravity and testing etc. provided by the
supplier shall be return to the Engineer in charge or shall be placed at proper place in the battery
room under intimation to Engineer in charge.
3.17.7 Load test on the commissioned battery sets shall be taken as per the instruction of the Engineer in
charge and performance of the battery cells float boost charger shall be observed for few hours.
Test load then shall be removed and battery shall be ultimately connected to the LV room for its
onwards utilization in control indication and protection circuits.
3.17.8 The following checks are recommended for battery
(i) Checking of completion of civil/ventilation requirement of battery room.
(ii) Checking of adequacy of charger output/requirement with respect to current required
for battery charging as per the manual.
(iii) Checking for availability of safety devices, water and first aid box.
(iv) Checking the polarity of connections between battery and charger.
(v) Visual inspection test for level and leakages.
(vi) Checking of layout as per approved drawing.
(vii) Checking of IR value from positive to earth and negative to earth.
(viii) Checking of voltage per cell and total voltage between positive negative and earth
to positive/negative,
(ix) Checking of tightness of connectors on each cell.
(x) Checking of capacity test and hourly measurement of specific gravity and voltage for
each cell.
(xi) Charging-discharging cycle as per standard practice, and as per instruction of
Engineer-in-charge.
3.17.9 The following checks are recommended for battery charger.
(i) IR test
(ii) Checking for charging mode of batteries, constant current and constant voltage mode.
(iii) Load test on charges by running of DC drives (if there and by liquid resistance
(iv) Checking of thickness of earthling connections.
(v) Check for functional operation of charger, auto manual change over from float to boost
to float etc.
(vi) Check for AC ripple in boost and float made after charging.
(vii) Check and polarity of cables connected to battery
3.18.0. EARTHING ARRANGEMENTS: (TECHNICAL TERMS & CONDITIONS)
Standard Guidelines & Recommendations for Earthing System for EHV Sub-station issued
vide Circular R & M/3 dtd.5.11.12 & CE(TR) Circular 36 dtd. 23.9.08 to be followed.
The General notes for Earthing system & drawings for earthing the equipments (including
welding joints) are compiled in Drg. No. GETCO/E/STD/P-012 sheet 1 to 24 (available in SOR
3.18.1 The earthing work shall include laying of the earth mat in the switchyard as per the approved
drawing making special earth pits for outdoor equipments and control room equipments, providing
risers from the earth mat up to the equipment structure plinth, driving earth electrode in the soil as
per the approved drawing and connecting it by welding covering maximum area to the earth mat.
3.18.2 All the materials required for laying earth mat and driving the earth electrode as well as shall be
supplied by the contractor which includes earth mat MS spikes/ bars for electrodes etc.
3.18.3 The other materials like Maintenance free treated earth electrodes, backfill compound, form boxes
etc shall also be supplied by the contractor.
3.18.4 The pits for laying earth mat includes excavation and back filling shall be made as per design in the
entire switchyard and buried at the depth as per approved design. The earth electrodes shall be
driven into the soil, cable trench by driven making the holes etc. as per the approved drawing. The
connection of electrode to the earth mat shall be done as per the drawing enclosed.
3.18.5 The junctions of earth mat (along and across) shall be done with full double welding. At the joints
bending whichever require painting anti corrosive leakage bituminous compound provided by the
Contractor. The welding shall be capable of withstanding the thermal stresses developed due to
high fault current passing through the grid. The connection of risers to the earth grid shall be
secured as per the instructions of Site Engineer. After the laying of earth mat is over, the same shall
be covered by the excavated earth. All the consumables such as welding electrodes, bolt nuts,
blare bituminous compound layers, the contractor at his own cost shall procure test link etc. The
welding machine shall also be arranged by the contractor. The metered power supply shall be made
available to the contractor as per the prevailing rates, terms and conditions of supply of the Board.
The contractor at his own cost shall do the fabrication of earth mats as per the site requirement. All
the surplus steel materials shall be retained to the purchaser after the work is over.
3.18.6 The individual earth pit as per the appended drawing shall be prepared. The minimum depth of the pit
excavation shall be 2.5 mtr. The earthing pipe shall project 150 mm above the ground. The earthing
leads for connecting the earth electrode and earth mat to the equipments shall be done as shown in
the drawing. Earthing strip lying by digging 600 mm depth and 450 mm vide trench by joint with
providing 2 Nos. G.I bolt nuts and welding and apply the blue bituminous compound anti corrosive
and as per instruction of Engineer-in-charge. The earthing flat where required to be connected on
structure or equipment shall be fastened with not less than two G.I bolts & done as per aesthetic
view and bend in right angle properly with equipment. After making the pit and providing the layers
of backfill compound as shown in the drawing the pit shall be watered and back filling should also
be done along with the watering. The excess earth after the filling of the earth pit shall be removed
from the site and shall be stacked away as per the instruction of engineer in charge. The top of the
electrode shall be covered and the cast iron cover shall be provided on the top of the chamber by
the Contractor. The resistance of the earth pit should be measured before and after earth filling
work to ensure its power worthiness. If the earth resistance is not less than prescribed value,
remedial measures shall be taken as per the instruction of engineer in charge at no extra labour
cost to the Board. All he readings of the earth pit resistance taken shall be recorded in the register
and counter signed by the representatives of the contractor and the Board.
3.18.7 The installation of earth pit done as per drawings in pits the tentative quantity of backfill compound
shall be 2 bags.
3.18.8 The earth pit shall be serially numbered as per the instructions of engineer in charge on 125 mm x
mm 1.6 mm thick mild steel plate with red letters in white background. Numbered plate shall be
fitted on 70 cm galvanized angle of 25 x 25 x 3 mm with GI bolt & nuts. The Contractor shall supply
the materials required for this. Item includes drilling of the holes, fixing of bolt nuts and painting and
lettering shall be done by the contractor.
3.19 GENERAL :
3.19.1 The Contractor shall ensure that at the end of each sub-activity the Surplus materials are immediately
removed from the work-site and the surplus excavated earth is spreader around to avoid loss or injury
to the public/equipments.
3.19.2 The Contractor has to return all surplus materials after reconciliation of material account in good and
useable condition. The contractor shall settle the final bill including signature on all relevant papers
required for passing of final bill, excess/saving statement and time limit extension proposal. If any
within three months from the date of charging/commissioning or taking over by the Board of the Sub
3.19.3. Most of all equipments should be erected in presence of the concerned engineer from OEM/GETCO
After complete erection and operation, contractor's supervisor should attend the site whenever called
3.19.4. from GETCO for further testing commissioning of equipments/panels etc.
3.20 Erection:
1. All erection work is to be carried out as per the manual of OEM (Original equipment manufacturer)
and instruction of engineer-in-charge.
2. All equipment erection charges are inclusive of shifting dragging handling of the respective
equipment up to S/s erection site from its S/s site store.
3. Contractor has to ensure safe shifting dragging erection of all equipments to comply with labour
laws I.E. rules etc.
4. All erection charges are inclusive of fixing of clamp connectors, all necessary accessories to the
respective equipment.
5. Transformer erection charges cover shifting dragging, handling etc. for its bushings radiators
conservator tank and allied accessories.
6. All erection work includes erection insurance to be arranged by the contractor at his cost.
7. All the required tools and tackles like conductor, earth wire compression, jointing machine, cutting
machine, welding set etc, are to be arranged by the contractor at his cost.
8. For electrical lighting work prevailing SOR of Electrical work of R&B of GOG is to be followed.
3.21 Dismantling:
3.21.1 To ensure safety & Technical parameters in safe guard during dismantling, in person of
concerned Engineer in charge. Also to stack the materials at safe
place in proper stacking manner.
Signature of Contractor Superintending-Engineer (TR)
GETCO, CO, Bharuch
MAINTENANCE FREE TREATED EARTHPIT
The bidder shall have to do the entire work of earth pits required for equipment earthing and for the pits at the
corners of earth mat.
The product and the equipment covered by this specification shall, unless otherwise specified be in line with
the requirement of any of the latest applicable standards and will apply in order of priority as listed below: -
a) Indian Standards
b) IEEE
c) ANSI (American National Standards)
d) BS (British Standards)
EARTH PITS
All the Earth pit shill be with special Ground electrodes supplied by Reputed Manufacturer. These
special electrodes are provided with Ground enhancement material.
A. EARTHING PRODUCT COMPONENT SPECS
- The Earthing System should be based on use of Copper Bonded Earth Rods/ pipe electrode /PIP
electrode (for corrosion resistance) and Ground enhancement material (to reduce Soil Resistivity).
- It should be capable of providing any ohmic value as specified by the client, by inter-connection of ground
rods to form a Grid.
- The system shall be totally maintenance free and require no periodic or scheduled maintenance for a
period of at least 30 years.
- There shall be no requirement to add water or any other chemical any time after initial installation.
- There should be no requirement to have a inspection/maintenance chamber- The system shall provide
constant low ohmic value for entire life cycle without any consideration for moisture or temperature
conditions.
- The system shall be in use worldwide for period of at least 20 years.
- The manufacturer shall be a company of international repute engaged in the field of Facility Electrical
protection work.
B. ELECTRODE:
(1) COPPER BONDED EARTH RODS
- The Earth Rods shall have a nominal (actual) dia of 20mm (Min) and length of 3 M.
- The Rods shall have a steel core with molecular bonding of 250 micron of copper as per
international standards.
- A nickel layer is applied to steel core (and subsequently copper) by an electrolytic
process forming a metallurgical bond between the three.
- The copper used shall be type DHP alloy No. 122 CDA and rated at 99.95% copper. The
thickness of copper layer shall be uniform 250 micron.
- The Rods should be manufactured by a company of high repute to ensure quality of
Copper Bonding.
- The Rods should have been subjected to long term study to verify the claims of
corrosion resistivity made by the manufacturers
(2) PIPE or PIP (Pipe-In-Pipe) ELECTRODE
- It shall be capable to carry out the fault current as per GETCO standard considerations.
- It should have been subjected to long term study to verify the claims of corrosion resistivity made by the
manufacturers.
C. GROUND ENHANCEMENT MATERIAL / BACK FILL / GROUNDING COMPOUND
- Ground Enhancement Material / Backfill /Grounding compound shall be permanent and maintenance free.
(No re- charging with salts or any other chemicals) and shall maintain its earth resistance with time.
- Ground Enhancement Material / Backfill / Grounding compound shall confirm IEEE 80-2000 Clause
- It must set up firmly and not dissolve or decompose or otherwise pollute the soil or the local water table.
- It shall be suitable for use in dry form or slurry form.
- The Ground Enhancement Material/Backfill/Grounding compound shall not depend on the continuous
presence of water to maintain its Conductivity.
- Ground Enhancement Material / Backfill / Grounding compound in its set form shall have resistivity of not
more than 0.12 ohm-m
- The material should have been subjected to long term study to verify the claims made by manufacturers
about its soil resistivity reducing qualities.
- The material shall have been tested in a reputed laboratory for not containing any hazardous chemicals
as per EPA Chapter-7.
- The material shall be carbon based conductive concrete and shall not contain bentonite in any form.
The bottom 300 mm of the bore hole shall be filled with good quality preferably black cotton soil. The
balance length of the bore shall be filled entirely with the backfill compound in pure form without mixing
with soil. The compound shall bond tightly with the electrode and become a solid mass.
- Each Earth rod/pipe must be provided with a suitable clamp to facilitate inter – connection of rods and
connection to Equipment Earth Bar using appropriate copper/GI strip or conductor.
The product shall be guaranteed for trouble free operation for a period of 30 years from date of
commission or arrival at site whichever is later. Any defect discovered during this period shall be rectified
free of charge.
The pits shall be drawn with the help of a boring machine, an auger or any other means as required by
site conditions and nature of ground strata.
Drawing No. GETCO/ E/ STD/P-021(1 of 2 & 2 of 2), DTD. 30.07.14 shall be used for reference.
Important Note:
Terms “CI Pipe Electrode” and “Treated Electrode” shall be replaced by “Maintenance free Treated Earth
pit” wherever written in Earthling Philosophy as well as applicable equipment earthling drawings.
SIGNATURE AND SEAL OF THE BIDDER
TYPICAL LAP WELDING STANDARD DEISGN
4.19 TESTING AND COMMISSIONING:
4.19.1 The Contractor after completion of erection work will ensure that all works connected with line have
been completed. These works shall be done correctly as per Indian Electricity Rules and
Procedures. Any extra cost involved due to incompleteness of work or bad workmanship found out
subsequently shall be set right forth with by the Contractor at his cost.
4.19.2 After the erection is completed in all respects, the line should be thoroughly patrolled and checked
for continuity and clearances. The line should be meggered to check its insulation level. Afterwards
a written confirmation should be given to the Engineer-in-Charge that the men, materials, tools and
earthings (if any) are removed and the line is safe for charging. On charging the line, if it does not
hold and trips, the contractor should arrange to patrol the line and find out the causes for the
tripping and rectify the defect at no extra cost to the GETCO.
4.20 HANDING OVER OF LINE DOCUMENTS:
4.20.1 On completion of all erection activities, the contractor has to furnish following informations along
with technical details to concerned Engineer-in-Charge of the work in triplicate duly bound: -
a. Approved surveyed route with permanent marks, (To be obtained from the GETCO)
b. Approved copy of profiles with tower schedule, (To be obtained from the GETCO except for
portion where any change is approved)
c. Location wise soil strata details of each pit excavated, type of foundation executed, volumes of
excavation & concrete and RCC steel weights,
d. Details of revetment, retaining walls, etc., work done for protection of tower footing and their
approved drawing copies,
e. Approved copies of stringing charts,
f. Value of tower footing resistance before & after providing earthing and type of earthing
g. Details of spans and phase where mid span joint, repair sleeve used,
h. Location wise type and numbers of insulators, insulator hardwares, earthwire hardwares,
conductor accessories, etc., provided,
i. Separate detail of each crossing like road, river, railway, power line, P&T Line, etc and details
of clearance as per Indian Electricity Rules.
4.21 GENERAL:
4.21.1 The Contractor shall ensure that at the end of each sub-activity the surplus materials are
immediately removed from the work-site to avoid loss and injury to the public.
4.21.2 The Contractor has to return all surplus materials after reconciliation of material account in good
and useable condition and settle final bill including signature in all relevant papers required for
passing of final bill within three month from the date of charging / commissioning of line.
4.21.3 The contractor has to return empty Conductor / Earth wire Drums if it is Steel Drum. For wooden
Drums, contractor has not to return the empty Conductor/Earth wire Drums for the conductor/ E.W
used for this line.
4.21.4 If contractor does not complete the work in specified time with GETCO’s specification or leave the site
with incomplete work, GETCO will get the remaining work executed at the risk and cost of
contractor.
4.21.5 If at any time, before the security deposit is refunded to the contractor, it shall appear to the Executive
Engineer or his subordinate in charge of the work that any work has been executed with unsound,
imperfect or unskillful workmanship or with materials of inferior quality or that any materials or
articles provided by him for the execution of the work are unsound or of an inferior quality to that
contracted for or are otherwise not in accordance with the contract, it shall be lawful for Engineer-
in-charge to intimate this fact in writing to the contractor and then no withstanding the fact that the
work, materials or articles complained of, may have been inadvertently passed, certified and paid
for, the contractor shall be bound forthwith to rectify or remove and reconstruct the work so
specified in whole or any part, as the case may require or if so required shall remove the materials
or articles so specified and provided other suitable materials or articles at his own charge and cost,
and in the event of his failing to do so within a period to be specified by the Engineer-in-charge in
the written intimation aforesaid the contractor shall be liable to pay compensation at the rate of one
percent on the amount of the estimate for every day, not exceeding ten days during which the
failure so continue and in the event of any such failure as aforesaid the Engineer-in-charge may
rectify or remove and re-execute the work or remove and replace the materials or articles
complained of, as the case may be, at the risk and expense in all respects of contractor should the
Engineer-in-charge consider that any such inferior work or materials as described above may be
accepted, or made use of, it shall be within his discretion to accept the same as such reduced
rates as he may fix thereof. Provided that in the case of any work of which visible check is not
possible, if the Engineer-in - charge or his subordinate in charge of the work feels that such work
has been executed with unsound, imperfect or unskillful workmanship or with materials of inferior
quality, he shall take sample tests at random, cost of which shall have to be borne by the
contractor and if after taking such test, part of such work is found to be defective in any respect or
to have been executed with materials of inferior quality, then the contractor shall be paid for the
whole work such amount as may be fixed by the office of the Engineer-in-charge on the basis of
the lowest quality of work found by him in such samples tests.
4.21.6 If the contractor fails to complete the job in stipulated time period/leaves the site with incomplete work,
GETCO will get the remaining work executed at the risk & cost of contractor.
4.22 PROGRESS REPORT:
4.22.1 Daily progress report in duplicate shall be regularly submitted to the Executive Engineer (Const.),
with a copy to Supdt. Engineer (Trans). The Contractor shall also maintain register as per
Schedule of Section E-IV.
4.23 SITE VISIT:
4.23.1 The Engineer-in-Charge of the works or his representative will be free to visit the contractor's
works, their site stores and erection site and also verify the purchasers materials in the custody of
the contractor, as and when required.
4.24 WARRANTY:
4.24.1 The erection work will be covered under warranty period against any defect arising from erection
workmanship for a period of 18 months from the date of completion of line or 12 months from the
date of handing over of the line to the satisfaction of Superintending Engineer (Trans), at his sole
discretion, whichever is earlier.
4.25 QUANTITIES:
4.25.1 Quantities given in the Schedule-B are to be executed by the contractor at the rate accepted by the
GETCO in the A/T. In case of any deviation/tower quantity /type of tower/ length of line,
excavation/ concreting resulting in an increase in which event the field officer shall obtain prior
approval of the competent authority of GETCO and excess quantity shall be paid only at accepted
rate of the A/T.
Design / drawings for any other item to be executed, if required shall be prepared and submitted to
the GETCO for approval by the successful contractor at no extra cost to the GETCO and in time to
avoid delay in completion period. Payment for such Items executed shall be made on the basis of
quantities of approved designs and rates accepted in the A/T.
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Bharuch
TECHNICAL PARTICULARS FOR ERECTION, TESTING AND COMMISSIONING OF
TRANSMISSION LINES ON D/C-M/C TOWERS:
4.1 The scope for erection works covered under this section consist of:
I. Check survey with minor survey work and if required, original survey and profiling.
taking delivery of structure and line material from the carrier/ The GETCO, checking them, transporting
to contractor's stores and keeping in safe custody,
II. to take suitable storage-cum-erection insurance,
III. distribution of all materials to erection site,
IV. Excavation, stub-setting, concreting etc. complete work for foundation including dewatering, shoring &
shuttering, cutting of stubs, fabrication and supply of chimney material and form boxes etc.
V. Tower erection including fixing of attachments, accessories and tack welding,
VI. Stringing of AAA/ACSR conductor/s and ground wires with providing jumpers etc. upto sub-station
gantries at both ends and making LILO arrangement including dismantling work with one circuit in
live condition wherever applicable and if the item is included in Schedule B. De-stringing of existing
66kV D/C line including grounding of insulator string, clamping, grounding of earth wire/conductor
crediting to The GETCO’s store.
VII. Testing, commissioning and guarantee of all the activities carried out from (I) to (VII).
3.1.2 The successful Contractor shall carry out all addition/alteration required to complete the line for
commissioning.
3.1.3 The GETCO will supply structure materials, bolts-nuts, attachments, insulators, insulator-
hardwares, conductor, accessories, ground wire, ground wire accessories, etc. required for
erection of transmission line.
3.1.4 All works shall be carried out in accordance with the revised and latest provisions under Indian
Electricity Act and Rules made there under.
3.1.5 All the erection tools required during construction of line shall be arranged by the contractor at his
own cost. The Contractor shall only be responsible for damage and / or loss of his erection tools.
3.1.6 The Contractor shall be fully responsible for completing all the above works till the complete line is
taken over by the GETCO.
4.2 ROUTE:
4.2.1 The proposed route of the line is available with concerned field office. The tenderers are presumed
to have acquainted themselves with the route of line before submitting their offer.
4.2.2 The successful bidder has to collect from concerned field office the detailed route on topographic
sheet duly approved by the GETCO immediately on receipt of the Order. He shall also arrange visit
of proposed line route jointly with The GETCO's representative for important marks coming along
with the route.
4.3 SURVEY:
4.3.1 On completion of final survey (check survey), the contractor should return the copy of original
profiles along with copies of final survey to the Engineer-in-Charge of the work, before
commencement of digging of pits. If, any subsequent alteration is found necessary i.e. during
check survey, the contractor shall have to submit full details of such alteration with justification and
obtain approval of the Superintending Engineer (TR) before carrying out the work. The contractor
will be responsible for any inaccuracies that may arise due to incorrect survey / spotting of tower
etc. and should rectify such inaccuracies at his own cost. The approval of check survey shall be
obtained from the S.E. (Trans) concerned.
4.3.2 For important crossing like major road, railways, rivers, power line, telecommunication lines etc.
the clearances shall be provided in accordance with the prevailing rules of the concerned authority.
4.3.3 Tension towers with double tension hardware shall be located on either side for railway and power
line crossings depending on the merits of each case. Necessary copies of finally approved
drawings required for approval of concerned authority shall be supplied by the Contractor free of
4.3.4 The angle of crossing shall be maintained at 90 Deg. as far as possible for crossings like river,
railway, power line and P&T crossings but never less than
4.3.5 The crossing towers with double suspension hardware and dead end type anchor towers shall be
located for major river crossings.
4.4 TAKING DELIVERY AND DISTRIBUTION OF MATERIALS:
4.4.1 The Contractor has to take delivery of tower materials/ Girders directly from the GETCO's store.
The line materials that will be issued by the GETCO will be in “as is where is" condition at the
stores centre of the GETCO in that area during working hours of working days. The Contractor will
be fully responsible for any damage to or loss of all materials at any stage during transportation or
4.4.2 The Contractor has to open site store immediately nearby the line route and ensure for safe custody of
all the materials stored at his own cost.
4.5 WAY LEAVE, TREE CUTTING AND OTHER OBSTRUCTIONS:
4.5.1 The contractor will arrange for right of way and for tree clearance. Proposals in this connection will
have to be prepared and submitted by the Contractor well in time. It will also be necessary on the
part of contractor to instruct his labourers and staff to use minimum area while doing the work
where there are standing crops. No person of the contractor should pick any items from standing
crops or fruits. The contractor should take all possible steps to avoid or minimize damage to
standing crops, etc.
4.5.2 The contractor should immediately notify any obstructions or hindrance from local villagers or the
local authorities in the execution of the work to the concerned Engineer-in-Charge but should not
deal directly in the matter. The Engineer -in-Charge will arrange to remove the obstacles as soon
as possible.
4.5.3 For the clearances, permissions, removal of obstructions in way leave etc. the Contractor shall not
remain contended by simply informing the GETCO, but shall invariably assist and arrange for
personal follow up to overcome the difficulties in the interest of progress of the work.
4.5.4 METHODOLOGY FOR COMPENSATION TOWARDS ROW: Methodology for compensation towards
Right of Way (ROW)/Way leave clearance/Tree crop damages etc during construction of this line
will be made as per GOG Tharav No. Date-04.07.26.
4.6 ACCESS TO LOCATIONS:
4.6.1 It will be the Contractor’s sole responsibility to take the materials upto the location. Any path way,
temporary road, temporary bridge required will have to be provided by the Contractor at his own
cost.1f, for any reasons the above is not feasible, the Contractor at his own cost shall have to
arrange transportation by head loads.
The contractor will be deemed to be very well familiar with the route of the transmission line before giving
the offer. Notwithstanding the difficulties of terrain, location approaches, way leave and other
obstructions the price quoted for all the items of erection in the Schedule of Section-E-IV shall not
undergo any change at any stage or granted by the GETCO for any special rates/consideration.
SHORING, SHUTTERING AND DEWATERING:
The Contractor has to arrange for shoring, shuttering and dewatering work during activities of
excavation, stub setting and concreting. These shall be done at his own cost.
4.7 EXCAVATION FOR FOUNDATIONS:
4.7.1 On finalization of location, the Contractor shall make a trial pit on all four legs of tower having width
of 900 mm x 900 mm and depth according to following alternatives:
Alternative-I: If the rock is encountered within the depth of 1.5 mtr, the excavation of trial pit shall be
restricted to l.5 mtr. During such excavation, it should be ensured that the depth of rock
encountered shall meet with the concrete plug height of respective rock type foundation
design. Otherwise, the excavation depth be increased in such a manner that depth of rock
encountered shall meet the concrete block height of respective rock type foundation
design. The total depth of excavated pit shall be limited to 3.5 mtrs for adopting suitable
foundation design.
Alternative-II: When the rock is not encountered up to 3 / 3.5 mtr, the excavation shall be stopped and
depending upon the soil strata of excavated pits, the classification of foundation type to be
adopted be obtained.
4.7.2 After the excavation of all the four pits for the tower, as indicated in 3.7.1 above, the Engineer-in-
Charge of the work (Elect. & Civil) or Engineer nominated by the Chief Engineer (Proj), Head
Office shall examine the type of soil and foundation to be adopted for the particular location. For
this purpose, Contractor shall offer at least 10 (Ten) locations at a time. The decision given by the
Engineer-in-Charge of works (Elect. & Civil) or Engineer nominated by Chief Engineer (Proj) for
adopting type of foundation at particular location shall be binding to the Contractor.
4.7.3 After the decision of foundation type to be adopted, the excavation dimensions of trial pits shall be
increased to the respective approved foundation design, if required. For the excavation done in
excess of determined volumes (according to approved foundation design), the contractor has to fill
the extra excavation by 1:2:4 mix. concrete at his own cost.
4.7.4 The details of strata found during the trial excavation, decision about the foundation to be adopted
and the final actual excavation volumes shall then be recorded in the register to be maintained for
this purpose, with proper authentications of the engineers of the Contractor.
4.7.5 The payment of excavation will be limited to the volumes as per approved excavation drawings even
though the Contractor may excavate more for the sake of his own convenience or for any reasons.
If the excavated dimension/s is/are more than the dimension/s shown in the approved drawing, the
additional excavated volume should be filled in with 1:2:4 mixture concrete at Contractors cost in
respect of materials, labours etc.
4.7.6 In case of rock soil, the extra excavated rock portion on all sides shall be filled with 1:2:4 mix
concrete at his own cost in respect of materials, labours etc.
4.7.7 The rates indicated in schedule for excavation work in each soil shall be applicable to all the
locations as per actual condition of the soil strata irrespective of classification of type of foundation.
4.7.8 The rates for excavation indicated in schedule shall also be applicable for benching work, if
4.7.9 Definition of Soils:
The soil to be excavated for tower foundations are classified as under:
a) Normal dry Soil:
The soil readily removable with ordinary spades and shovels viz. murram / hard murram etc.
and to be used for location in normal dry cohesive or non-cohesive soils of any colour or
soil containing loose boulders.
b) Black Cotton Soil:
The clayey soil which can be removable with ordinary spades, shovels, pick, axes etc. and
swells when wet and shrinkes when dry, but not necessarily black in colour.
c) Soft Rock:
The rock like hard gravel, kankar, limia stone, fissured rock and other types with similar
nature, which gets decomposed and can be quarried or split with crow bar or pick or axe.
d) Hard Rock:
The rock which can be removed by chieselling, drilling, blasting.
e) Sandy Soil:
The normal / black cotton soil which contains more than 50 % sand OR complete sand.
f) Wet Soil:
The normal / black cotton soil having long standing surface water for more than 6 months
and with water penetration not exceeding one meter below ground level e.g. paddy field.
g) Submerged Soil:
The normal / black cotton soils met with sub soil water which requires dewatering.
Note: For rock, it may be ensured that it is the parent soil strata and not the isolated local boulders.
4.7.10 Guideline for adopting various types of foundations: (All dimension are in mm)
Layer depth from ground level in mm.
Sr. Type of foundation to
Type of soil
No. be adopted
1. Normal Dry Soil (NDS) Dry B.C. G.L. 500 m.m.
NDS DBC 3500 m.m.
Layer at 1(a)
NDS G.L. 3500 m.m.
2. Partially Submerged Soil strata as at (1) / (5) but with soil water table available below
Normal (PSN) m.m. from G.L. to 3500 m.m.
3. Fully Submerged Normal Soil strata as at (1) / (5) but with soil water table available within
soil m.m. from G.L. to 3500 m.m.
4. Wet Normal Soil Soil strata as at (1) but surface water logged for more than 6 months
(WNS) and penetrating upto 1000 m.m from ground level.
5. Partially Dry Black DBC G.L. More than
Cotton m.m. & upto
(PDBC) 1500m.m.
NDS DBC 3500m.m.
Layer at 5(a)
6. Fully Dry Black Cotton DBC G.L. More than
(FDBC) m.m. and upto
Layer at 6(a)
7. Partially Submerged Partially Soil strata as at (6) but with sub soil water table available
Black Cotton m.m. from G.L. upto 3500 m.m.
Layer depth from ground level in mm.
Sr. Type of foundation to
Type of soil
No. be adopted
8. Fully Submerged Black Soil strata as at (6) but with sub soil water table available within
Cotton m.m. from Ground Level upto 3500 m.m.
9. Wet Black Cotton Soil strata as at (5) or (6) but surface water logged for more than
months and penetrating upto 1000 m.m. from ground Level.
10. Soft Rock (SR) Dry B.C. or NDS G.L. Rock
DBC/NDS layer at 1500 m.m. within
10(a) (within 3500m.m.
11. Hard Rock (H R) Dry B.C. or NDS G.L. Rock
DBC/NDS layer at 1500/within
11(a) (within 3500m.m.
12. Sandy Dry B.C. or NDS Mixed with sand upto 3500 mm. (more
than 50% Sandy)
Sand Within 1500mm. 3500 m.m.
4.7.11 For very complicated soil strata other than indicated above like soft rock-cum submerged or hard rock-
cum-submerged, normal-clayee-sandy soil etc., the matter should be referred to Chief Engineer
(Trans) for decision regarding the type of foundation to be adopted, giving details of strata of soils in
all the four of the location along with proposal recommended. The proposal shall be submitted in
consultation with the Engineer-in- Charge (Civil & Electrical).
4.7.12 Precautionary Measures:
a. During excavation of rock (by chiseling or blasting or drilling) extra care should be taken, so that
excavation dimensions required for rock portion is maintained almost equal to but never less than
approved foundation design. The rock surface shall be as rough as possible for proper bondage
between rock and concrete. In case of extra excavation in rock, the same shall be filled with 1:2:4
mix concrete at Contractor's own cost i.e. the concrete shall be filled in the gap for the desired
height of the concrete plug. The Contractor shall arrange for required blasting materials at his own
cost and will be responsible for storage and use of such materials.
b. Whenever dewatering is necessary during excavation for smooth execution of the work, manual
dewatering will be resorted to in case of little water otherwise mechanical or power driven
dewatering shall be deployed at Contractors own cost.
c. In case of collapsible soil shoring and shuttering shall be provided by the Contractor at his own cost.
No extra charge shall be admissible for removal of collapsed soil in the pit.
d. Whenever necessary, the leveling of soil shall be done.
e. For shallow foundation, the stub shall bee cut to proper length at contractor’s own cost and record
shall be maintained for such locations in terms of cut lengths.
4.8 STUB SETTING:
4.8.1 The Contractor shall be fully responsible for correct setting of stubs in accordance with approved
methods of the exact locations and alignments and in precisely correct level. Stub-setting
templates to be supplied by the GETCO should be used for proper, setting of stubs.
4.8.2 The rates for stub setting are inclusive of cutting of stubs (if any), setting of stubs, levelling at correct
level, dismantling of template after concrete, back-filling etc. work.
4.8.3 Above rates shall be on per MT basis for normal, extensions upto 21 meters and special/river
crossing towers.
4.8.4 The weights payable for stub-setting item shall be comprising the weight of stub and its respective
stub setting template.
4.8.5 The Contractor shall invariably return the stub setting templates with bolt-nuts in good condition to
the GETCO on completion of foundation work. The templates shall be returned duly painted with
red oxide, if ungalvanised and marked with its number.
4.9 CONCRETE:
4.9.1 Form boxes made out of M.S. sheet for chimney and steps or pyramids shall be prepared by the
contractor as per approved foundation design, drawings at his own cost.
4.9.2 The cement required shall be arranged by the contractor from his own stock or by purchasing from
the market. (Please see the Special condition for use of cement).
4.9.3 The cement consumption for different types of concrete shall be considered as follows:
1:1.5:3 mix. – 8.2 Bags, per Cu. metre. (M 20)
1:2:4 mix. - 6.5 Bags, per Cu. metre. (M 15)
1:3:6 mix. - 4.5 Bags, per Cu. metre. (M 10)
4.9.4 The sand shall be of the best quality containing hard siliceous materials, clean and of sharp
angular grit type and free from earth or organic matter or salts and to the satisfaction of the
Engineer-in-Charge. The sand shall be washed before use. No saltish or brakish water shall be
used for concreting.
4.9.5 The mixture of concrete to be used shall be such as to produce a sound, compact and water-proof
concrete. The mixture shall not be weaker than the ratio to be prepared. The stone metal shall not
be in size bigger than 40 m.m. The concrete for chimney shall be prepared with 20 mm stone
metal and the concrete for pyramid/step/pad shall be prepared with 20 mm or 40 mm stone metal.
The mixture shall be prepared using mixing machine only. It should also be free from grit and dirt.
The concrete shall be mixed as stiff as required for placing the concrete in the form of moulds with
ease and degree to which concrete resists segregation will permit. Hence, the quantity of water
used should not be too much.
4.9.6 Proper form or moulds adequately braced to retain proper shape while concreting, should be used
for chimney, pyramid and slab portions. Form boxes should be water tight so as not to allow
cement cream to come out leaving only sand and gully to form honey combs in concrete. Form
boxes should be cleaned and oiled before using for concreting.
4.9.7 All sub-merged locations must be kept completely dewatered both during the placing of concrete
and for 24 hours after completion. There should be no disturbance of concrete by water during this
4.9.8 Form boxes should not be removed before 24 hours, after concreting. Concrete surfaces where
required should be set right with rich cement and mortar after removal of the forms.
4.9.9 The Superintending Engineer (Trans), Bharuch or Engineer appointed by him at his sole
desecration may uncover any cast foundation to find out the workmanship of foundation.
Contractor shall render necessary assistance during such fact finding operation and shall comply
with the report of the investigating officer.
4.9.10 The tor steel bars required for RCC type foundation shall be procured by the contractor in advance
to avoid delay in the work.
4.9.11 The contractor will be responsible for constructing the foundations in accordance with the design of
each type of foundation supplied by the GETCO.
4.9.12 The rates indicated in schedule for concrete work shall be applicable to all the locations irrespective
of soil strata and type of foundation adopted.
4.9.13 The tor steel bars required for RCC type foundation shall be procured by the Contractor in advance
to avoid delay in the work.
4.9.14 The empty cement bag shall be retained by the Contractor.
4.9.15 No wastage is permitted for reinforcement steel as reinforcement steel is to be procured by the
contractor at his own cost. NO over lapping of RCC is permitted in foundation work.
4.9.16 The GETCO reserves right to test the quality of steel and cement procured by the contractor at any
Govt. recognized Laboratory and intended to be used for the tower foundation works. The test
results shall be binding to the Contractor.
4.10 CURING AND BACK-FILLING:
4.10.1 After 24 hours of pouring, the concrete should be cured by keeping it continuously wet for 14 days.
from grass, dung, wooden waste, postures and fodder woods, shrubs, thorn etc.) sprinkled with
necessary amount of water and well compressed and consolidated in layers not exceeding
mm. If the excavated soil consists of large boulders/stone, the same shall be broken to maximum
size of 80 mm and mixed with soil to be back filled. At the locations where borrowed earth is
required for back filling, this shall be done by the Contractor at his own cost, irrespective of
transportation from any lead. Thereafter, the exposed top end the fill shall be kept wet for the
remainder of above prescribed curing period. The uncovered portion of concrete chimney above
the back filled earth shall be kept wet by providing empty gunny bags fully wrapped around the
concrete chimney for curing and ensure that the bags are kept wet by frequent pouring of water on
4.10.2 Extra ordinary care be taken during back-filling. The Contractor and The GETCO's Engineers at
site shall ensure that back-filling is done in the manner referred above, so that back-filled earth
becomes homogeneous with surrounding parent soil with the passage of the time.
4.10.3 The site engineer of the contractor shall record the day / date of curing, back-filling etc. and sign in
the register for its correctness along with The GETCO's representative.
4.10.4 The rates of stub setting are including the work of back filling of excavated pit. The large stones /
boulders shall be broken to maximum 80 mm size before used for back-filling at no extra cost to the
4.10.5 The quantity of excavated earth obtained from a particular location shall generally be utilized in
back filling work in tower footing of same location, unless it is unsuitable for such purpose. In the
later case, the back-filling shall be done with borrowed earth of suitable quality irrespective of lead
at no extra cost to the GETCO.
4.11 PROTECTION OF TOWER FOOTING:/ ‘H’ FRAME FOOTING.
4.11.1 The work shall include all necessary stone revetment, concreting and earth filling above ground
level and the clearance from stacking on the site of all surplus excavated soil, special measures for
protection of foundation close to or in nallas, river bed hilly/undulated terrain etc. by providing
suitable revetment. The top seal cover of the stone revetment shall be done with M150 concrete
(1:2:4 mix). The Contractor shall furnish in the profile itself the recommendations for providing
protection at these locations wherever required. However, the work shall be executed as per
approved drawings only.
4.11.2 The quantity of excavated earth obtained from a particular location shall generally be utilized in
back filling work in protection of tower footing of same location, unless it is unsuitable for such
purpose. In the later case, the back filling shall be done with borrowed earth of suitable quality
irrespective of lead and the consolidation of earth shall also be done free of cost.
4.11.3 Quantities of various protection work like stone revetment, concrete revetment, brick masonry and
random stone masonry to the foundations are to be executed by the successful contractor if
indicated in the schedule- B and payment for such quantity shall be as per unit rates accepted.
4.12 ERECTION OF TOWERS:
4.12.1 The super-structure of towers should be erected on foundations after 14 days of concreting.
However, the method adopted for erection of tower is left to the discretion of the contractor subject
to the condition that he takes responsibility for any damage to materials. No tower member should
get strained or bent during erection. The towers must be truly vertical after erection and no
straining would be allowed to bring it in alignment. Maximum tolerance in verticality that will be
permitted is ONE mm per 360mm of tower height. The bolt head shall be on outside faces and
nuts and washers on inside faces of the tower. All bolts & nuts shall be made fully tight and finally
the bolt threads shall be centre punched to avoid nuts getting loose. Punching of bolts shall be
made by chamfering the threads with centre punch atleast at three places equally spaced on
contact surface of bolts and nuts.
4.12.2 Complete tower erection shall include erection of all accessories like danger plate, number plate,
phase plate, C.I. Plate, Anti-climbing devices and fittings including attachments like step bolts,
ladders, platforms, 'U' bolts, shackles, hangers, strain plates etc.
4.12.3 Suitable tower extension shall be erected to get desired ground clearance whenever required, as
determined at the time of survey and profiles.
4.12.4 To avoid pilferage of bolts and nuts and tower members, the bolts of the two bottom most panels
(say upto 10 meters) shall be tack welded at three places on the nuts diametrically. The zinc rich
paint shall be procured by the Contractor at his own cost and shall be applied immediately
following the tack welding.
4.12.5 The contractor shall arrange for all the equipments for tack-welding purpose. The rates shall be
inclusive of supply and application of zinc rich paint on it. The tack welding of nuts with bolts for two
bottom – most panels shall be carried as per the instruction of E.I.C.
4.13 GROUNDING:
4.13.1 It is necessary that in no case, tower footing resistance should be more than 10 Ohms during dry
weather. The Contractor shall arrange required equipments for measurement of soil and tower
footing resistance. The payment shall be released only after receipt of final soil resistance details of
providing earthing at each location.
4.13.2 After erection of towers, the Contractor shall measure the footing resistance of each location and
prepare the record for submission and approval of Engineer-in-Charge for deciding the type of
grounding to be provided.
4.13.3 Pipe Type Earthing:
At locations where footing resistance does not exceed 10 Ohms., the pipe type earthing as per
appended drawing shall be provided. The contractor will have to supply all the materials required
for grounding like pipe, flat, bolt- nuts, salt, fine broken coke/charcoal etc. The earthing is to be
done by making a bore hole for insertion of pipe away from the tower leg excavation line.
4.13.4 Counterpoise Earthing:
At locations, where footing resistance exceeds 10 Ohms, counterpoise earthing as per appended
drawing shall be provided to bring down the tower footing resistance below 10 Ohms. The
Contractor will have to supply all the materials required for grounding like lugs, G.I. wire, bolts, nuts
etc. The counterpoise earthing shall be burried 600 mm below ground level.
4.13.5 The method for providing earthing shall be at the desecration of the Contractor.
4.13.6 The record of footing resistance shall be maintained in consultation with Engineer-in-Charge
before and after providing of suitable earthing.
4.14 INSULATOR HOISTING ON TOWERS / ‘H’ FRAME:
4.14.1 Suspension insulator strings shall be used on all tangent type towers and tension insulator strings
on all small, medium, large angle and dead end type tension towers. Technical particulars of
insulator strings are appended herewith.
4.14.2 Insulators strings shall be assembled on ground. These shall be cleaned and examined for hair
cracks, chips or defective glazing (not exceeding half centimeter square) and then hoisted by
careful handling. The work will include fixings of all hardwares and fittings in their proper places
and order.
4.15 STRINGING ON TOWERS / ‘H’ FRAME:
4.15.1 Before commencing of stringing work, contractor must obtain approval of sag tension charts (these
shall have to be supplied by the contractor) showing final sags and tension for various temperature
and spans. The stringing chart shall be prepared according to appended format only.
4.15.2 The Contractor shall be responsible and will take care of proper handling of drums from stores to
site. Sufficient numbers of aluminum snatch blocks shall be used for paving out the ACSR/AAA
Conductors. Necessary precautions shall be taken to avoid conductor rubbing on the ground by
providing adequate ground roller, rollers on supports. Additional rollers shall also be provided to
cross thorny hedges, footing and other obstructions to avoid scratching of conductor. The
conductor and ground wire shall be made to sag correctly as per stringing charts before they are
finally transferred to the hardwares for conductors and to clamps for ground wire. No joint should
be made at less than 30 metres from the tower end and no joint shall be permitted in Railway,
River, road and other important crossings spans. There shall not be more than one joint in a span
of each conductor. The sag The GETCO, if used shall be adjusted to suit the sag indicated against
actual temperature for an individual span. The thermometer shall be provided at the conductor
point during the stringing work. Dynamometers shall be used in tensioning the conductors. All
conductors shall be stressed to their maximum working load at the time of stringing, as per
approved stringing charts.
4.15.3 The minimum clearance between the lowest point of conductor and ground shall not be less than
required. All compression joints should be carefully made and a record of initial and final lengths
of the joints jointly signed by Contractor's and The GETCO's representatives should be
maintained. Check for sag should also be made at intervals when conductors are drawn up. Over
stressing, causing damage to towers should be avoided. Care should be exercised not to over
tension the conductor. An extra sag of 150 mm be allowed at all the important tension locations
like Railway/River Crossings.
4.15.4 After being pulled the conductor/ground wire shall not be allowed to hang in the stringing sheaves
for more than 72 hours, before being pulled to the specified sag. During the time the conductor /
ground wire is on the stringing sheaves before sagging-in, it shall be ensured that the conductor /
ground wire is not damaged due to wind, vibration, vehicles or other causes. Scaffolding should
be used to cross the important roads and Railway Crossing for minimum interruption to traffic.
4.15.5 The conductor shall be pulled upto desired sag and left in serial stringing sheaves for at least one
hour after which the sag shall be rechecked and adjusted, if necessary, before clipping in and
transferring the conductors from the serial stringing sheaves to the suspension clamps.
4.15.6 Conductor shall be clamped within 24 hours of sagging. The sag will be checked in the larger
spans of the section in case of sections upto eight spans and in one intermediate larger span also
for section with more than eight spans.
4.15.7 The stringing sheaves, when suspended on the transmission structure for sagging, shall be so
adjusted that the conductor will be on the sheaves at the same height as the suspension clamp to
which it is to be secured.
4.15.8 The stringing of the ground wire shall be done in accordance with the stringing charts approved by
the GETCO. The ground wire shall be strung to run continuously over the conductors. The ground
wire shall be pulled, sagged and clamped-in from tension tower to tension tower before the phase
conductors are pulled in that section.
4.15.9 All the line conductors shall be terminated at sub-station structures whose details shall be
furnished by the GETCO at the appropriate time. The contractor shall fix strain insulators on the
sub-station structures.
4.15.10 Armour rods and vibration dampers shall be fitted at each suspension tower before final clamping
of conductor with Insulator strings. Vibration damper shall be fitted at each tension tower after final
clamping of conductor with insulator strings. Vibration dampers are to be fixed using aluminium
tape with each clamping bolt and in correct vertical position in relation to conductor. Compression
type joints are to be used for jointing of conductors. Each part connected with joints shall be
perfectly cleaned by wire brush and properly greased before final compression. All the joints of
conductors and earth wire shall be made in the best workmanship manner and shall be perfectly
straight and having maximum possible strength.
4.15.11 Proper guys shall be provided to counter balance the paving out tension of conductor/ ground wire
at the tension locations, to avoid damage to towers and/or accident.
4.15.12 Stringing work shall mean, the activities of fixing of insulator and insulator hardwares, paving, jointing,
tensioning, clamping with armour-rod, providing dampers, repairing of conductors (if any) and
fixing the conductor at tension hardwares etc. De-stringing work is the part of this contract. It
includes de-clamping of the existing conductor / earth wire grounding of insulator string earth wire
/ conductor and depositing the same in the GETCO`s store.
4.15.13 The rates for any type of stringing work, out of followings are indicated in Schedule B.
o stringing of one / two ground wire/s,
o stringing of single / double circuit line with single bundle conductor/s,
o hot-line stringing of conductor,
4.15.14 The rates for stringing of conductors and ground wire for special crossings like river shall be on per
KM basis only and shall be paid according to actual work done. In case special towers are
suspension type the special shall mean major river crossing section considering the span from one
anchor tower to the other end anchor tower
4.15.15 The stringing work should be planned in such a manner in consultation with the Engineer in charge
of the work that minimum shut down of power line crossings are required. Revenue loss due to any
undue shut down i.e. after the shutdown is arranged and required to be extended on account of
contractor shall be recoverable from the contractor.
4.15.16 All members of dismantled tower and line materials shall be credited by the contractor to Const. Div.
4.15.17 The empty steel drums of conductor and earth wire shall be returned by the contractor.
4.16 TOWER ACCOUNT
4.16.1 Within the month of completion of the foundation activity of the line all the stub setting templates
shall be returned / credited to the GETCO's store as per the instruction of the Engineer-in-incharge
of the works at no extra cost to the GETCO.
4.16.2 Within the month of completion tower erection activity of the line all surplus stubs / towers /
extensions including bolts, nuts and accessories etc. shall be returned / credited to the GETCO's
store including its proper stacking as per instruction of the Engineer- in-charge of the works at no
extra cost to the GETCO. If contractor fails to do so, cost of the surplus towers i extensions / stub
setting template including bob & nuts shall be deducted from the payable amount of this or any
other work executed by the contractor.
4.16.3 So far as the accounting of unused surplus towers is concerned, the same shall be done on the
basis of complete tower only and not on per MT basis. For shortage of any part (as per BOM)
/Bolts-Nuts/Accessories to complete the tower, recovery of complete full tower shall be made from
contractor’s bill.
4.16.4 All the surplus towers as mentioned above shall be returned to the stores as per instruction of
Engineer-in-Charge of the works OR at the TOWER BANK situated at Bharuch within one month
of completion of towers erection. This includes unloading of tower material and stacking it as per
instruction of the Engineer- -in-Charge at no extra cost to the GETCO.
4.16 MATERIAL ACCOUNT:
4.17.1 On completion of the work, all surplus tower and line materials etc. and stub-templates shall be
returned by the contractor to the stores of the GETCO, as per the instructions of the Engineer-in-
charge of the works at no extra cost to the GETCO.
4.17.2 The contractor shall submit the complete materials account immediately after the work is completed
and in any case not later than 3 months from the date of completion or handing over of the line,
whichever is earlier.
4.18 WASTAGES:
4.18.1 The contractor shall make every effort to minimize the breakages, losses and wastages of line
materials/cement etc. supplied “Free of Cost” by the GETCO for line erection work.
4.18.2 The maximum ceiling for wastages permitted is as under:
Sr. No. Item % wastages permitted (Maximum)
i) Conductor and earth wire. ½% (for jumpering, sister wire & sag.)
ii) Conductor and earth wire. ½% (for credit as scrap of cut-piece length (from 10 Mtrs.
Upto 30 Mtrs.)
iii) Conductor and earth wire. And 2% (for credit in pieces as good conductor from
Mtrs. to 30 Mtrs.)
iv) Bolt-nuts Nil (No extra bolts-nuts will be supplied).
v) Insulators ¼%
4.18.3 All the wastages are accountable except for items (i) of Clause No.2.24.2. The account of
permissible wastages shall be maintained at site in the registers as prescribed by the Engineer-in-
Charge of works, which will be subjected to periodical checking by purchasers authorized
representatives.
4.18.4 The account of wastages shall also be submitted on monthly basis (with running accounts bills) to
the Engineer-in-Charge of works as per Statement-B, Appendix-I of the specification. The copy of
R.A. Bill shall also be submitted to the concerned Executive. Engineer (Const).
4.18.5 The contractor has to return empty steel conductor and earth wire drum.
4.19 TESTING AND COMMISSIONING:
4.19.1 The Contractor after completion of erection work will ensure that all works connected with line have
been completed. These works shall be done correctly as per Indian Electricity Rules and
Procedures. Any extra cost involved due to incompleteness of work or bad workmanship found out
subsequently shall be set right forth with by the Contractor at his cost.
4.19.2 After the erection is completed in all respects, the line should be thoroughly patrolled and checked
for continuity and clearances. The line should be meggered to check its insulation level. Afterwards
a written confirmation should be given to the Engineer-in-Charge that the men, materials, tools and
earthings (if any) are removed and the line is safe for charging. On charging the line, if it does not
hold and trips, the contractor should arrange to patrol the line and find out the causes for the
tripping and rectify the defect at no extra cost to the GETCO.
4.20 HANDING OVER OF LINE DOCUMENTS:
4.20.1 On completion of all erection activities, the contractor has to furnish following informations along
with technical details to concerned Engineer-in-Charge of the work in triplicate duly bound: -
j. Approved surveyed route with permanent marks, (To be obtained from the GETCO)
k. Approved copy of profiles with tower schedule, (To be obtained from the GETCO except for
portion where any change is approved)
l. Location wise soil strata details of each pit excavated, type of foundation executed, volumes of
excavation & concrete and RCC steel weights,
m. Details of revetment, retaining walls, etc., work done for protection of tower footing and their
approved drawing copies,
n. Approved copies of stringing charts,
o. Value of tower footing resistance before & after providing earthing and type of earthing
p. Details of spans and phase where mid span joint, repair sleeve used,
q. Location wise type and numbers of insulators, insulator hardwares, earthwire hardwares,
conductor accessories, etc., provided,
r. Separate detail of each crossing like road, river, railway, power line, P&T Line, etc and details
of clearance as per Indian Electricity Rules.
4.21 GENERAL:
4.21.1 The Contractor shall ensure that at the end of each sub-activity the surplus materials are
immediately removed from the work-site to avoid loss and injury to the public.
4.21.2 The Contractor has to return all surplus materials after reconciliation of material account in good
and useable condition and settle final bill including signature in all relevant papers required for
passing of final bill within three month from the date of charging / commissioning of line.
4.21.3 The contractor has to return empty Conductor / Earth wire Drums if it is Steel Drum. For wooden
Drums, contractor has not to return the empty Conductor/Earth wire Drums for the conductor/ E.W
used for this line.
4.21.4 If contractor does not complete the work in specified time with GETCO’s specification or leave the
site with incomplete work, GETCO will get the remaining work executed at the risk and cost of
contractor.
4.21.5 If at any time, before the security deposit is refunded to the contractor, it shall appear to the
Executive Engineer or his subordinate in charge of the work that any work has been executed with
unsound, imperfect or unskillful workmanship or with materials of inferior quality or that any
materials or articles provided by him for the execution of the work are unsound or of an inferior
quality to that contracted for or are otherwise not in accordance with the contract, it shall be lawful
for Engineer-in-charge to intimate this fact in writing to the contractor and then no withstanding the
fact that the work, materials or articles complained of, may have been inadvertently passed,
certified and paid for, the contractor shall be bound forthwith to rectify or remove and reconstruct
the work so specified in whole or any part, as the case may require or if so required shall remove
the materials or articles so specified and provided other suitable materials or articles at his own
charge and cost, and in the event of his failing to do so within a period to be specified by the
Engineer-in-charge in the written intimation aforesaid the contractor shall be liable to pay
compensation at the rate of one percent on the amount of the estimate for every day, not
exceeding ten days during which the failure so continue and in the event of any such failure as
aforesaid the Engineer-in-charge may rectify or remove and re-execute the work or remove and
replace the materials or articles complained of, as the case may be, at the risk and expense in all
respects of contractor should the Engineer-in-charge consider that any such inferior work or
materials as described above may be accepted, or made use of, it shall be within his discretion to
accept the same as such reduced rates as he may fix thereof. Provided that in the case of any
work of which visible check is not possible, if the Engineer-in - charge or his subordinate in charge
of the work feels that such work has been executed with unsound, imperfect or unskillful
workmanship or with materials of inferior quality, he shall take sample tests at random, cost of
which shall have to be borne by the contractor and if after taking such test, part of such work is
found to be defective in any respect or to have been executed with materials of inferior quality,
then the contractor shall be paid for the whole work such amount as may be fixed by the office of
the Engineer-in-charge on the basis of the lowest quality of work found by him in such samples
4.21.6 If the contractor fails to complete the job in stipulated time period/leaves the site with incomplete
work, GETCO will get the remaining work executed at the risk & cost of contractor.
4.22 PROGRESS REPORT:
4.22.1 Daily progress report in duplicate shall be regularly submitted to the Executive Engineer (Const.),
with a copy to Supdt. Engineer (Trans). The Contractor shall also maintain register as per
Schedule of Section E-IV.
4.23 SITE VISIT:
4.23.1 The Engineer-in-Charge of the works or his representative will be free to visit the contractor's
works, their site stores and erection site and also verify the purchasers materials in the custody of
the contractor, as and when required.
4.24 WARRANTY:
4.24.1 The erection work will be covered under warranty period against any defect arising from erection
workmanship for a period of 18 months from the date of completion of line or 12 months from the
date of handing over of the line to the satisfaction of Superintending Engineer (Trans), at his sole
discretion, whichever is earlier.
4.25 QUANTITIES:
4.25.1 Quantities given in the Schedule-B are to be executed by the contractor at the rate accepted by the
GETCO in the A/T. In case of any deviation/tower quantity /type of tower/ length of line,
excavation/ concreting resulting in an increase in which event the field officer shall obtain prior
approval of the competent authority of GETCO and excess quantity shall be paid only at accepted
rate of the A/T.
Design / drawings for any other item to be executed, if required shall be prepared and submitted to
the GETCO for approval by the successful contractor at no extra cost to the GETCO and in time to
avoid delay in completion period. Payment for such Items executed shall be made on the basis of
quantities of approved designs and rates accepted in the A/T.
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Bharuch
Penalty Clause:
1. In case if any safety related fatal Elect. / Mech. accident occurred to any employee of agency or
outsider due to negligence or non-compliance of GETCO safety norms then in addition to the
compensation and liability as per statutory requirement, contractor / agency shall be penalized as
Sr. No Amount of Contract in Rs. Penalty amount
1 Up to 1 Lac Rs.5000/- plus GST as applicable
2 Above 1 Lac to 10 Lacs Rs.40000/- plus GST as applicable
3 10 to 100 Lacs Rs.100,000/- plus GST as applicable
4 > 100 Lacs 1.0 % plus GST as applicable
Reporting:
2.1 The contractor shall inform concerned Ex. Engineer Const/TR in writing within 24 hours of
fatal/Non-fatal accident occurred to human being.
2.2 The GETCO investigating officer findings in to accident shall be final and binding to the contractor
3. Safety Requirement:
3.1 Kick off Meeting exclusively for safety shall be done in each contract in presence of contractor’s site in
charge and supervisor. Safety document shall be handed over and vital safety norms and key points
of safety related to project shall be explained and recorded for commitment by erection contractor.
Such records are mandatory for clearing first erection bill.
3.2 During site visit by GETCO official of Executive Engineer and above rank, the following checks during
execution of work shall be covered.
3.21 Safety equipments available and utilize.
(a) Helmet.
(b) Safety belt.
(c) Safety shoes.
(d) Live line Voltage detector
3.22 Safety procedure adopted.
(a) Permit to work
(b) Earthing at the place of work.
(c) Adequate supervision.
3.23 T & P physical Check. (Healthiness and Quality)
(a) P.P.rope.
(b) Wire rope and sling.
(c) Earthing rod
3.24 If above-mentioned safety requirements found violated in any of the above three conditions shall
attract penalty of Rs.1000/- plus GST per occasion. (Max.Rs.3000/--for violation of three
conditions) During subsequent visit, if violation is found, then double penalty plus GST shall be
deducted from the bill of the Contractor/Agency.
Signature of Contractor Superintending Engineer (TR)
Safety Instruction for Contractors:
Following safety guidelines are mandatory for all contractors operating in GETCO premises /on transmission
lines for Electrical, non-electrical & civil works.
1. The contractors must provide advance planning of work to concerned in-charge of substation in writing.
2. The list of workers/ lab ours with name and address must be given to S/s In charge prior to
commencement of work by the contractor.
4. The list of T&P and safety equipment (PPE) having tested and checked by GETCO officials at site.
5. The working procedure must be specified with timings of working hours indicating tea break & lunch
break period.
6. Before starting any work whether switch yard, on line or in colony “permit to allow to work” must be
taken from control room in-charge.
7. Utilizing Electrical/non- electrical equipments, safety rules must be implemented.
8. All workers /labour & supervisors must use safety equipments (PPE) during the work.
9. If the work is to be carried out on Sunday or public holiday the necessary permission must be taken in
advance, requesting in writing.
10. Unwanted person including children of labours will not be allowed at working site/ in the switchyard and
in the prohibited area.
11. Any electrical work or electrical connections to equipment for any other work must be carried out by
certified electrician/wiremen with adequate size of wire through MCB per I.E. Rule. Ensure that all
precautions are taken to prevent electrical accident & the installation /connection is certified by
Engineer in-charge.
12. No work should be done during night hours unless & until it is required under certain circumstances
with the approval next higher authority and all necessary arrangement of adequate lighting with safety
precautions is made.
13. Joint checking of line by In-charge, contractor & supervisor prior to commencement of work of any
electrical/non-electrical work.
14. Any power line crossing, river crossing & railway crossing or any other hazards must be discussed with
workers by contractor in presence of Engineer in-charge.
15. Contractors must submit list of workers with name, qualification and experience who are engaged for
line maintenance/rectification job.
16. Line clear permit must be taken on power line crossing or passing nearby for safety of workers. This
must be ensured by GETCO supervisor/in-charge of substation before starting the work.
17. Contractors must arrange for Shelter and drinking water facility for the labours /workers engaged with
the permission of S/s in charge.
18. The method of work, required T&P and manpower should be discussed between GETCO supervisor,
contractor’s supervisor and gang leaders.
19. Prior to execution of work a joint survey must be conducted by GETCO supervisor, contractor’s
supervisor and DISCOM line man in order to identity the following.
20. The contractor has to deploy minimum 8 to 10 skill labours/ fitters at site daily failing to which GETCO
shall deduct 1,000/- plus GST as applicable per day from the bill.
21. If the contractor fails to complete the job in stipulated time period, GETCO will get the remaining work
executed at the risk & cost of contractor.
22. The GETCO reserves the rights of interchanging and dismissing any person employed for the work if
there is complaint against his misbehavior, misconduct or disloyalty towards job.
23. Terms and conditions regarding industrial laws and other related matters shall be complied by the
contractor in all respect.
24. The contractor shall ensure that all persons have provided safety tools, shoes, halmets etc. as may be
required for safety point of view and all his persons shall follow the instructions issued by the GETCO
from time to time in concern with the safety and security as the work to be carried out.
25. If the Contractor defaults in execution of the orders placed or if COMPANY suffers any financial loss
due to this, then COMPANY will be forfeited Security Deposit, EMD plus GST as applicable from other
orders of the same firm or by encasing the Bank Guarantee.
26. If the contractor fails to complete the job in stipulated time period/leaves the site with incomplete work,
GETCO will get the remaining work executed at the risk & cost of contractor.
SCHEDULE –A
MATERIALS:-
Following material will be supplied by GETCO “free of cost” for Work of erection of 66KV equipment,
Structures, Control wiring, Yard Lighting, Control-Room, Staff-Quarter Electrification &
Supply of Furniture etc at 66 kV Achhod S/S & associated Line S/S under construction
Division Bharuch
1) G I Structures, accessories, attachments, bolts-nuts etc.
2) Conductor, conductor accessories, earth wire, earth wire accessories.
3) Insulators, insulator hardwares, G I strip size 75 x 10 mm & 50 x6 mm /MS
round bars size 20/25/32/40 mm dia. Except vertical 3.0 mtr long electrodes
66 KV /11KV/LT equipments with accessories and control and relay panels.
4) 110 Volt, 100 AH DC battery sets and battery chargers.
5) Various sizes of armored control cables and LT control cables.
6) PLCC equipments and PLCC panels.
Following materials / equipments will be procured / arranged by the contractor activities for 66 KV& above
class sub stations.
1) Tools tackles required for erection activities. And stringing.
2) Earthing materials, CI frame & cover, cement, sand, gravel, bricks, bolts-nuts with washers, number
plates, painted plates etc. Vertical 3.0 mtr long electrodes
3) Maintenance free earth electrodes & back fill compound
4) Filter machine, hydraulic crane and hydraulic jointing machine/welding machines.
STORE CENTRES
SUB-Station Equipment/Material will be issued from following Store Centres:
Sr. Store Centers for issue of S/s+line
No. materials/equipments.
for Work of erection of 66KV equipment, Structures,
Control wiring, Yard Lighting, Control-Room, Staff-
Quarter Electrification & Supply of Furniture etc at
1 KV Achhod S/S & associated Line SS under Bharuch/Haldarva
construction Division Bharuch
Note: Generally, all required materials will be issued form above store centre’s of GETCO. In case of non-
availability of some items, contractor shall have to collect from other nearby store centers without extra
cost to the Board.
APPENDICES
Gujarat Energy Transmission Corporation Ltd.
APPENDIX –I
TENDERER’S EXPERIENCE
A List of Similar jobs executed by the Contractor &Name with address of a Person whom reference can be
made, by the Corporation, if required necessary.
[Tenderers shall submit the information in the Format detailed here under]
Sr Description Value Constructi Actual Date Client Persons Principal
No of Work Of Work Construction Of to Features
Executed Period Completion whom
Rs. for the Reference
Completion may be
of the work made
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company
Date & place:
Gujarat Energy Transmission Corporation Ltd.
APPENDIX – II
WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand, as on the date of the Submission of this tender [Tenderers shall
submit the information in the Format detailed here under]
No location
Tender Cost of Anticipated Estimated Date Stipulated
Cost Remaining Date of Cost Date or
decision period
work Completion
Expected Completion
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company Date & place: _______________________________________________
Gujarat Energy Transmission Corporation Ltd.
APPENDIX-III
TENDERER’S DETAILS OF PERSONNEL
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Sr. Description Name Qualification Professional Remarks
Experience
No. &Details
& details of
of position
works carried
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company
Date & place: ______________________________________________
Gujarat Energy Transmission Corporation Ltd.
APPENDIX-IV
TENDERER’S DETAILS OF MACHINERY
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderer shall submit in the Format detailed here under.
Sr. Description & Details Capacity Numbers Make Remarks
No. machinery
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company
Date & place: _______________________________________________
Gujarat Energy Transmission Corporation Ltd.
APPENDIX-V
Sr. Name of Name of Qualification Designation / Remarks.
No. firm Authorized post holding in
representative of firm company.
who has visited the site.
PERFORMA, SHOWING THE DETAILS OF SITE VISIT DONE BY AGENCY BEFORE QUOTING THE
[Tenderers shall submit in the Format detailed here under]
Contractor’s Representative legible signature: ______________________
Name of the person: __________________________________________
Seal of the company
Date & place: _______________________________________________
Gujarat Energy Transmission Corporation Ltd.
APPENDIX – VI
Qualification Requirement.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
Class – with valid up to
1 Registration
3 Partnership deed/Proprietor (Notarized copy)
4 Power of Attorney (Notarized copy)
Bl. Sheet / P&L A/C, Statement of last three
Rs. Lacs issued by Bank, branch
6 Latest Solvency certificate.
7 GST Registration No.
Signature of Tenderer Company’s Round Seal
Gujarat Energy Transmission Corporation Ltd.
APPENDIX – VII
Qualification Requirement.Contractor must fill up below details
1. PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2. PENALTY TERMS AGREED
(Please Specify YES / NO.)
3. SECURITY TERMS AGREED:
(Please Specify YES / NO.)
4. TERMS AGREED:
(Please Specify YES / NO.)
5. VALIDITY Of the offer for 180 DAYS From the date of opening of
the Technical Bid: AGREED:
(Please Specify YES / NO.)
6. PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
7. MOBILE NOS., TELEPHONE NOS. & FAX NO:
8. Authorized person of the firm :
9. Name of the proprietor, partners, directors [as the case may be],
along with address, telephone, fax no. etc.
Signature of Tenderer Company’s Round Seal
SECTION – E IV
PART – B
SCHEDULE –
FINANCIAL CAPABILITY
Sr. No. Details Amount Rs. In lacs Remarks
1. Solvency A scheduled Banker’s Certificate of
present solvency be attached.
2. Annual turnover for last five
3. Price of the biggest job
carried out.
Signature of Authorized Representative
Company / Agency
STATUS: ______________________
Name of tendering
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Bharuch
SECTION – E IV
PART – B
SCHEDULE -
LATEST INCOME – TAX CLEARANCE CERTIFICATE
SECTION – E IV
PART – B
SCHEDULE –
(BANK GUARANTEE ON NON JUDICIAL STAMP PAPER OF Rs. 300/-)
BANK GUARANTEE
FOR TENDER NO: _________________________________ B.G. No. ______________________ issued on
dated: ____________
WHEREAS Messers _________________________________ (Names and address of the firm) having their
registered office at _____________________________________
_______________________________________________________ (address of firm’s registered office)
(hereinafter called the “Tenderer”) wish to participate in the Tender No.
_________________________________ (Supply / Erection / Supply and Erection / work) of
_______________________________________________________________ (Name of the material /
equipment / work) _________________________ for Gujarat Energy Transmission Corporation Ltd
(hereinafter called the “Beneficiary”) and
WHEREAS a Bank Guarantee for Rs. ______________________ (Amount of E.M.D.) valid till
___________________________________________________ (mention here date of validity of this
guarantee which will be 3 months beyond initial validity of Tenderer’s offer).
We, _______________________________________________________ (name of the Bank and address of
the Branch giving the Bank Guarantee), having our registered office at
________________________________________________ (address of Bank’s registered office) _________
hereby give this Bank Guarantee No. ________________ dated _________________ and hereby agree
unequivocal and unconditionally to pay immediately on demand in writing from the Gujarat Energy
Transmission Corporation Ltd or any officer authorized by it in this behalf any amount not exceeding Rs.
___________________ (amount of E.M.D.) (Rupees _____________________________________________
to the said Gujarat Energy Transmission Corporation Ltd on behalf of the Tenderer.
We ___________________ (Name of the Bank) ____________________ also agree that withdrawal of the
tender or part thereof by the tenderer within its validity of non-submission of Security deposit by the Tenderer
within one month from the date tender or a part thereof has been accepted by the Gujarat Energy
Transmission Corporation Ltd would constitute a default on the part of the tenderer and that this Bank
Guarantee is liable to be Invoked and encashed within its validity by the beneficiary in case of any occurrence
of a default on the part of the Tenderer and that the encashed amount is liable to be forfeited by the
beneficiary.
This agreement shall be valid and binding on this Bank upto and inclusive of
_______________________________ (mention here the date of validity of Bank Guarantee) and shall not be
terminable by notice or by change in the constitution of the Bank or the firm of Tenderer or by any reason
whatsoever and our liability hereunder shall not be impaired or discharged by any extension of time or
variations or alterations made, given, conceded with or without our acknowledge or consent by or between the
Tenderer and the Gujarat Energy Transmission Corporation Ltd.
NOTWITHSTANDING anything contrary contained in any law for time being in force or banking practice, this
guarantee shall not be assignable, transferrable by the beneficiary (i.e. GETCO). Notice or invocation by any
person such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank. Any
invocation of the guarantee can be made only by the beneficiary directly.
NOTWITHSTANDING anything contained hereinbefore our liability under this Guarantee is restricted to Rs.
___________________________ (amount of E.M.D.) (Rupees
______________________________________________________ (in words).
Our guarantee shall remain in force till ________________________________________ (date of validity of
the guarantee). Unless demands or claims under this Bank Guarantee are made to us in writing on or before
________ (date should be one month after the above validity period of BG), all rights of Beneficiary under the
Bank Guarantee shall be forfeited and we shall be released and discharged from all liabilities there under.
Complete postal address of the Signature of Bank’s
Bank with Branch code, Authorized Signatory with
Telephone and Fax Nos. Official Round seal
Note: The banks shall be the Banks recognized/notified by the Finance Department, Government
of Gujarat(GOG) from time to time.
SECTION – E IV
PART – B
SCHEDULE –
DETAILS OF PARTNERS / DIRECTORS WITH THEIR ADDRESS
Name of bidder: _______________________________________________________
Designation Name Residence (address) Working Place
Signature of Authorized Representative
Company / Agency
STATUS: ______________________
Name of tendering
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Bharuch
SECTION – E IV
PART – B
SCHEDULE –
MEMORANDOM / ARTICLE OF ASSOCIATION
CONSTITUTION OF FIRM WITH THE NAMES OF PARTNERS / DIRECTORS.
(TO BE SUBMITTED SEPARATELY WITH THE OFFER DULY SEALED AND SIGNED)
SECTION – E IV
PART – B
SCHEDULE –
ATTESTED COPY OF RESOLUTION OF THE PARTNERS / THE GETCO / AUTHORITY ACCEPTABLE BY
LAW OF THE FIRM AUTHORISING A PARTICULAR PERSON TO SIGN TENDER AND RELATED
DOCUMENTS ON BEHALF OF THE COMPANY.
(TO BE SUBMITTED SEPARATELY WITH THE OFFER DULY SEALED AND SIGNED)
SECTION – E IV
PART – C
SCHEDULE –
PROFORMA FOR AGREEMENT
(Non Judicial Stamp Paper of Rs. 300/-)
CONTRACT AGREEMENT
THIS AGREEMENT is made at BHARUCH the_____________ day of ___________ in the Christian Year two
thousand ___________ between M/s. _____________________________________ (address of office)
________________ (hereinafter referred to as “THECONTRACTOR” which expression shall unless excluded
by or repugnant to the context include its successors or permitted assigns) of the ONE PART and the
Gujarat Energy Transmission Corporation Ltd, having their Head office at Race Course, Baroda 390
(hereinafter called “The GETCO” which expression shall unless excluded by or repugnant to the context
include its successors or assigns) of the SECOND PART.
WHEREAS the aforesaid The GETCO has accepted the tender of the aforesaid contractor for work of
_________________________________________________________________________________ as per
The GETCO’s Order No. ______________________________________ _______________ hereinafter called
“the works” and more particularly described and enumerated or referred to in the specification, terms and
conditions prescribed in the order letter, covering letter and other letters and schedule of price which for the
purpose of identification have been signed by Shri ____________________________________ (authorized
signatory) on behalf of the contractors and by the Supt. Engineer (Trans), Gujarat Energy Transmission
Corporation Ltd, Vidyut Bhavan, Race Course, Baroda on behalf of the GETCO, a list whereof is made out in
the Schedule hereunder written and all of which said documents are deemed to form part of this contract and
included in the expression “The works” wherever herein used, upon the terms and subject to the conditions
hereinafter mentioned.
AND WHEREAS the GETCO has accepted the tender of contractors for the work of
for sum of Rs. ___________________ Rupees (_______________
____________________________________________) upon the terms and subject to the conditions herein
mentioned.
NOW THIS AGREEMENT WITNESSESS AND IT IS HEREBY AGREED AND DECLARED THAT.
The contractors shall do and perform all works and things in this contract mentioned and described or which are
implied therein or therefrom respectively or are reasonably necessary for the completion of the works as
mentioned and at the times, in the manner and subject to the terms and conditions and stipulations contained
in this contract, and in consideration of the due provision, executions, erection and completion of the works
agreed to by the contractor as aforesaid the GETCO doth hereby covenant with the contractor to pay all the
sums of moneys as and when they become due and payable to the contractors under the provisions of the
contract. Such payment to be made at such times and in such manner as is provided by the contract.
The conditions and covenants stipulated here-in-before in this contract are subject to and without prejudice to the
rights of the GETCO to enforce penalty for delays and / or any other rights whatsoever including the right to
reject and cancel on default or breach by the contractor of the conditions and the covenants as stipulated in the
general conditions, specifications, forms or tender schedule etc. attached with The GETCO’s Order No.
The contract value, extent of works, completion dates, specifications and other relevant matters may be altered
by mutual agreement and if so altered shall not be deemed or construed to mean or apply to affect or alter
other terms and conditions of the contract and the general conditions and the contract so altered or revised
shall be and shall always be deemed to have been subject to and without prejudice to said stipulation.
List of documents forming part of the contract:
The GETCO’s Tender Specification No. ____________ and contractor’s offer opened on dated
The GETCO’s contract booklet – “Tender & Contract of Works”.
The GETCO’s order No. Dtd. _____ / ______/
Contractor’s acceptance of order vide letter No. _______________.
Contractor’s Partnership Deed dtd. ________________.
Contractor’s Power of Attorney / The GETCO Resolution authorizing person to sign on behalf of Firm.
In witness whereof the parties hereto have set their hands and seals this day and month, year first above
Signed, sealed and delivered by
For and behalf of M/s. __________________ (Signature)
Address: _____________________________
In the presence of (Name and Address)
i) __________________________________ (Signature)
ii) __________________________________ (Signature)
Signed, sealed and delivered by for and on
behalf of Gujarat Energy Transmission Corporation Ltd
Sardar Patel Vidyut Bhavan, Race Course,
BARODA - 390
In the presence of name and address:
NOTE: 1) Copies of all documents forming part of the contract and listed in schedule (from tender
invitation to A/T and party’s acceptance letter thereof) be sealed and signed by the authorized
signatory of the firm be submitted with the agreement.
2)Attested copy of resolution of the Partners / The GETCO / Power of Attorney acceptable by law
authorizing particular person to sign on behalf of firm be invariably enclosed along with
submission of Agreement.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Doccuments E 2612.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].