| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.8 LAdmitted-Finance | -27.27% | ₹6.8 L | L1 | Admitted-Finance |
| 2 | L2₹7.3 L+₹50,430.73 (7.38%)Admitted-Finance | -21.90% | ₹7.3 L+₹50,430.73 (7.38%) | L2 | Admitted-Finance |
| 3 | L3₹7.5 L+₹63,578.40 (9.31%)Admitted-Finance | -20.50% | ₹7.5 L+₹63,578.40 (9.31%) | L3 | Admitted-Finance |
Tender Value
₹9.4 L
EMD Value
₹18,782
Closing Date
28 May 2026, 6:00 pmClosed
XEN LMC CAD K PATAN
XEN LMC CAD K PATAN
Excavation and Construction of VRB in Drainage system in Section 2nd of Sub Division K.Patan.
2026_CADKO_560724_2
CAD K PATAN NIT 02/2026-27
Open Tender
Civil Works
Percentage
BUNDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
AS PER NIT
₹18,782
Yes
1 Jun 2026
20 May 2026
29 May 2026
20 May 2026
28 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ITEMS | |||||
| 1.01 | Earthwork in excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5 m in dry or moist including dressing of excavated area dewatering wherever required complete in all respect in Hard/dense soil. | 5,621.4 | P.Cum | 79 | ₹4,44,090.6 |
| 1.02 | Centring and shuttering for slabs, beams ,lintels, columns, trough with or without caps and base including proping and remove. | 64.9 | P.Sqm | 225 | ₹14,602.5 |
| 1.03 | Supplying of MS reinforcement including labour charges for bending, binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars(IS :1786-1985) | 2,479.54 | P.kg | 78 | ₹1,93,404.12 |
| 1.04 | Providing & laying in position of Cement concrete nominal mix (1:3:6)M-10 including all leads of all construction materials including curing,compaction and finishing with rendering cement sand mortar 1:3 and making good the joints excluding the cost of centering.shuttering and reinforcement . well graded crusher broken stone aggregate of maximum size upto 20 mm. | 2.63 | P.Cum | 4,654 | ₹12,240.02 |
| 1.05 | Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 20 mm | 39.49 | P.Cum | 5,564 | ₹2,19,722.36 |
| 1.06 | Providing and Laying in position of Cement concrete Design mix M-25 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (For mix design Cement content considered 420 kg/ cum of concrete) | 8.1 | P.Cum | 5,975 | ₹48,397.5 |
| 1.07 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement.In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 47.59 | P.Cum | 140 | ₹6,662.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.54 MB
BOQ_998033.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .