Loading…
Loading…
| Sl No | Description | Qty | Unit | C K AMMED L1 | RAJAN L2 |
|---|---|---|---|---|---|
| 1.00Canal Lining | |||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 325 | sqm | 9.28 ₹3,016 Lowest | 9.54 ₹3,100.5 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 55.57 | cum | 257.9 ₹14,331.5 Lowest | 265.02 ₹14,727.16 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 27.11 | cum | 7,941.57 ₹2,15,256.25 Lowest | 8,160.89 ₹2,21,200.92 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 216.51 | sqm | 840.53 ₹1,81,981.47 Lowest | 863.73 ₹1,87,004.45 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 46.02 | cum | 8,578.5 ₹3,94,782.57 Lowest | 8,815.42 ₹4,05,685.63 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.2 | cum | 9,246.07 ₹57,325.63 Lowest | 9,501.42 ₹58,908.8 |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 177.51 | sqm | 317.66 ₹56,387.19 Lowest | 326.43 ₹57,943.94 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 29.25 | cum | 318.83 ₹9,325.78 Lowest | 327.62 ₹9,582.89 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.83 | cum | 10,500.42 ₹8,757.35 Lowest | 10,790.22 ₹8,999.04 |
Tender Value
₹8.7 L
EMD Value
₹21,715
Closing Date
18 Aug 2025, 6:55 pmClosed
Assistant Executive Engineer
O/O Assistant Executive Engineer KyIP Canal Subdivision Vadakara
GENERAL KyIP ACP Plan 2025 26 Rectification of leaked portion of Azhiyur Branch Canal near Ch 5 600 km General Civil Work
2025_Irrig_784332_1
IRR/PI/TR/2546/2025_5_4_3/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Vallikkad
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,915
Yes
₹21,715
Yes
10 Jul 2026
11 Aug 2025
20 Aug 2025
11 Aug 2025
18 Aug 2025
11 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1288383.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .