Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
3 Jul 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P and P)-CD
Replacement of damaged Drums, Bearings, Idlers, Idler Frames etc. of various Product Conveyors in Offsite area and the NP Plant, FACT CD.
2024_FACT_812172_1
04096/2024-2025/E29611
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹12,000
Yes
4 Jul 2024
18 Jun 2024
4 Jul 2024
18 Jun 2024
3 Jul 2024
18 Jun 2024
Replacement of damaged Drums, Bearings, Idlers, Idler Frames etc. of various Product Conveyors in Offsite area and the NP Plant, FACT CD.
Replacement of drive drums, tripper drums and tail drums of product conveyors at NP Plant/ Offsite Work involves: Collection and transportation of tools and tackles required for the work from Workshop/Toolcrib dept. Spare drum shall be transported to work site from Off site / stores / workshop and positioned at the required place. After getting the process clearance, the belt shall be arrested properly with belt clamps, after lifting the gravity weight. The damaged drum with Plummer block and bearings shall be dismantled and taken to Offsite Mechanical workshop. New bearings and plummer block at both side shall be fixed properly with lubricant. If required, zero speed sensor shall be provided for tail end drum. Release belt clamps, provide required gravity weight and service the conveyor on load, with out any sway. Rigging assistance shall be provided for the coupling / decoupling and alignment of drums.
Replacement of Gravity pulley, Bend pulleys and Snub pulleys etc. of product conveyors at NP Plant/ Offsite Work involves: Collection and transportation of tools and tackles required for the work from Workshop/Toolcrib dept. Spare drum shall be transported to work site from Off site / stores / workshop and positioned at the required place. After getting the process clearance, the belt shall be arrested properly with belt clamps, after lifting the gravity weight. The damaged drum with Plummer block and bearings shall be dismantled and taken to Offsite Mechanical workshop. New bearings and plummer block at both side shall be fixed properly with lubricant. Release belt clamps, provide required gravity weight and service the conveyor on load, with out any sway. Rigging assistance shall be provided for the coupling / decoupling and alignment of drums.
Removal and Refixing of the product conveyor drums for lagging purpose at NP Plant/ Offsite Work involves: Collection and transportation of tools and tackles required for the work from Workshop/Toolcrib dept. The drums to be lagged will be informed by the shift-engineer. After getting the process clearance, the belt shall be arrested properly with belt clamps, after lifting the gravity weight. The lagging damaged drum with Plummer block and bearings shall be dismantled and kept aside for the lagging purpose. The drum lagging work is not under the contractor's scope. After lagging and getting the clearance from the shift enginner for refixing the drum, the drum shall be placed in the position, inspect the bearing and both side shall be fixed properly with lubricant. If required, zero speed sensor shall be provided for tail end drum. Release belt clamps, provide required gravity weight and service the conveyor on load, with out any sway. Rigging assistance shall be provided for the alignment of drums.
Replacement of Troughing/Imapact idlers in bagging plant / product conveyors. Work involves: The required troughing/impact idlers shall be transported from Plant area / stores to site. The damaged troughing idlers of conveyors in NP offsite / bagging plant area shall be replaced, as per the instructions of Engineer - in -Charge. Damaged troughing idlers shall be transported to off site / scrap yard.
Replacement of return idlers / clamps of bagging plant / product conveyors. Work involves: The required return idlers / clamps shall be transported from Plant area / stores to site. The damaged return Idlers / clamps of conveyors in NP offsite / bagging plant area shall be replaced, as per the instructions of Engineer - in -Charge. Damaged return Idlers / clamps shall be transported to off site / scrap yard.
Replacement of Troughing Idler Frames, Impact Idlers Frames And Self Aligning Idler Frames With Rollers Of All Sizes of Product Conveyors at NP & Offsite. Work involves: Collect the required material from the store/workshop. After getting the work clearance from process dept., dismantle the defective idler frames with roller from the position in the conveyor line, clean the area properly, repair/replace the frame with rollers, and fix them back in position as per instruction. Damaged repairable frames shall be kept at the proper location as per the shift engineer's instructions, damaged unrepairable frames shall be transported to the scrapyard.
Servicing of damaged return idlers of 750mm wide bagging plant / product conveyors. Work involves : Re usable rubber disc shall be removed from the damaged return idlers. Return idlers shall be serviced / repaired by replacing the rubber discs / bearings as per the instructions of the Engineer-in -Charge. The serviced return idlers shall be kept properly at Off site area as spare.
Replacement of bearings of various conveyor drums. Work involves: The belt shall be arrested properly with belt clamps, after lifting the gravity weight. The bearing & plummer block of drum/pulley shall be replaced with new / serviced one. Bearings shall be lubricated properly with grease. The drum shall be aligned / fixed to the connecting part, as per instruction of the Engineer-in -Charge. Release belt clamps, provide required gravity weight and service the conveyor on load, with out any sway.
Servicing bearings of various conveyor drums. Work involves: The belt shall be arrested properly with belt clamps, after lifting the gravity weight whenever is required. The bearing & plummer block of drum/pulley shall be serviced. Bearing's locknut and clearance to be checked as per instruction of the Engineer-in -Charge. Bearings shall be lubricated properly with grease after the inspection. The drum shall be aligned / fixed to the connecting part, as per instruction of the Engineer-in -Charge. Release belt clamps, provide required gravity weight and service the conveyor on load, with out any sway.
BABY B
stage.html
html • 0.02 MB
finance_853531.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .