Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 CrAccepted-AOC | ₹5.1 Cr | 1 | Accepted-AOC accepted |
Tender Value
Refer Docs
Closing Date
2 Apr 2026, 3:00 pmClosed
SENTHIL KUMAR RAJENDRAN
3122 11 high mumbai
Hiring of Services on Call out basis for Kinley Valve Insertion Job in 25 Wells of Western offshore on Single tender-PAC basis for a period of 02 years for Well Services, Mumbai
2026_ONGC_270567_1
P66SS26001
Single
Miscellaneous Services
Lump-sum
730 days
mumbai offshore
3 documents required · 3 mandatory
₹0
Exempted
8 Sept 2026
12 Mar 2026
3 Apr 2026
12 Mar 2026
2 Apr 2026
13 Mar 2026
A. Mobilization and De-mobilization Charges: Currency =
Sr. No. Details Qty (set) UOM Charges inclusive of all but exclusive of GST GST (%) GST Amount Charges inclusive of GST Total
a b c d=b+c e=a*d
A.1 Mobilization charges for tools for 4-1/2" tubing size 1 Lump Sum
A.2 Mobilization charges for tools for 3-1/2" tubing size 1 Lump Sum
A.3 Mobilization charges for tools for 2-7/8" tubing size 1 Lump Sum
A.4 De-mobilization charges for tools for 4-1/2" tubing size 1 Lump Sum
A.5 De-mobilization charges for tools for 3-1/2" tubing size 1 Lump Sum
A.6 De-mobilization charges for tools for 2-7/8" tubing size 1 Lump Sum
A.7 Total of items nos A.1 to A.6 above
B. Standby Charges for Equipment:
Sr. No. Details Qty (set) No of days (Estimated) All inclusive Stand by day rate charges exclusive of GST (per day) GST (%) GST Amount Stand by day rate charges inclusive of GST (per day) Total
f g h i j=(h+i) k=f*g*j
B.1 Stand by rental charges for tools for 4-1/2" size tubing size 1
B.2 Stand by rental charges for tools for 3-1/2" size tubing size 1
B.3 Stand by rental charges for tools for 2-7/8" size tubing size 1
B.4 Total of items nos B.1 to B.3 above
C. Operating Charges for Equipment (inclusive of Day Rate, Cartridge Assembly, Check Valve, Redress Charges, spares & consumables).
Sr. No. Details Qty (set) No of days (Estimated) Operating day rate charges inclusive of all but exclusive of GST (per day) GST (%) GST Amount Operating day rate charges inclusive of GST (per day) Total
l m n o p = n+o q=l*m*p
C.1 Operating rental charges for tools for 4-1/2" tubing size 1
C.2 Operating rental charges for tools for 3-1/2" tubing size 1
C.3 Operating rental charges for tools for 2-7/8" tubing size 1
C.4 Total of items nos C.1 to C.3 above
D. Hire (day rate) Charges For Services Personnel
Sr. No. Details Qty (Person) No of days (Estimated) Manpower day rate charges inclusive of all but exclusive of GST (per day) GST (%) GST Amount Manpower day rate charges inclusive of GST (per day) Total
r s t u v=t+u w=r*s*v
D.1 Field Specialist 1
D.3 Total of items nos D.1 to D.2 above
E. Contract value
Sr. No. Details Qty (set) UoM Amount
E. 1 Total contract value for 4-1/2" tubing size 1 ∑ (A.1,A.4,B.1,C.1)+v*(m+g)
E. 2 Total contract value for 3-1/2" tubing size 1 ∑ (A.2,A.5,B.2,C.2)+v*(m+g)
E. 3 Total contract value for 2-7/8" tubing size 1 ∑ (A.3,A.3,B.3,C.3)+v*(m+g)
E.4 Total contract value of items nos E.1 to E.3 above
F. Charges in case of LIH
Sr. No. Details Qty Description Amount
F. 1 Charges towards LIH for tools for 4-1/2" tubing size 1 Lump Sum
F. 2 Charges towards LIH for tools for 3-1/2" tubing size 1 Lump Sum
F. 3 Charges towards LIH for tools for 2-7/8" tubing size 1 Lump Sum
F.4 Total of items nos F.1 to F.3 above
Notes: 1. Above quoted charges are inclusive of all applicable taxes duties for completion of services as per scope of work. 2. Above quoted charges for personnel are inclusive of associated expenditure such as airfare, Local transportation, accommodation, quarantine (if required} etc. No personnel charges will be paid for days the tool is not in working condition. 3. Above rates quoted in schedule of rates shall be firm and final for the entire duration of the contract. 4. No payment other than charges indicated in the price format, shall be payable during execution of the work. 5. Number of hire days indicated for rental tools and manpower are for evaluation purpose. Payment will be made on as per actual usage basis. 6. Above quoted charges towards LIH are indicative only and shall be paid, if applicable, as per relevant provisions of SCC and GCC. 7. Total mobilisation charges for the equipment will be limited as per clause 16.2.1 of the SCC.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
tendera.pdf
Tender Documents • 5.72 MB
PRICEFORMATFINAL1.xls
Other Document • 0.04 MB
Kinleybidextension.pdf
PDF • 0.08 MB
TechCorrigendum.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .