Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | -30.00% | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹2.7 L+₹3,791.32 (1.43%)Admitted-Finance | -29.00% | ₹2.7 L+₹3,791.32 (1.43%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 L+₹37,913.15 (14.3%)Admitted-Finance | -20.00% | ₹3.0 L+₹37,913.15 (14.3%) | L3 | Admitted-Finance |
| 4 | L4₹3.2 L+₹56,907.63 (21.4%)Admitted-Finance | -14.99% | ₹3.2 L+₹56,907.63 (21.4%) | L4 | Admitted-Finance |
| 5 | L5₹3.3 L+₹69,381.06 (26.1%)Admitted-Finance | -11.70% | ₹3.3 L+₹69,381.06 (26.1%) | L5 | Admitted-Finance |
Tender Value
₹3.8 L
EMD Value
₹7,580
Closing Date
21 Aug 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW RAJOURI
pls refer nit
2026_RDPR_320484_13
e-NIT No. 43 REW Rajouri of 2026 Dated 11-08-2026 re-tender
Open Tender
Civil Works
Percentage
90 days
RAJOURI
pls refer boq
2 documents required · 2 mandatory
₹500
Yes
Revenue Head
₹7,580
Yes
13 Sept 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations,
drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding
10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated
earth and disposal of surplus excavated earth as
directed:in all kind of soils. | 6.16 | CUm | 479.3 | ₹2,952.49 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 4.78 | CUm | 4,826.5 | ₹23,070.67 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 5.02 | CUm | 5,733.6 | ₹28,782.67 |
| 4 | Providing and laying in position cement concrete of specified grade reinforcement concrete including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.13 | CUm | 7,275.25 | ₹8,221.03 |
| 5 | Reinforced cement concrete works in wall (any thickness) incl.attachrd pilasters,buttresses,plinth and string courses,fillets columns piller piers etc. in 1:1.5:3 mix incl.curing but excluding the cost of centering and shuttering upto complete job. | 0.66 | CUm | 9,395.7 | ₹6,201.16 |
| 6 | Steel for RCC work with complete job | 145.78 | kg | 123 | ₹17,930.94 |
| 7 | Structural steel work builtup tubular (round ,square rectangular hallow tubes etc) | 688.41 | kg | 156.95 | ₹1,08,045.95 |
| 8 | Providing and fixing of precoated galvanised iron profile sheet | 49.14 | Sqm | 706.5 | ₹34,717.41 |
| 9 | Centering and shuttering including strutting, propping etc. and removal
of form for Foundations, footings, bases of columns etc. for mass
concrete | 29.66 | Sqm | 286.35 | ₹8,493.14 |
| 10 | Centering and shuttering including strutting, propping etc. and removal
of form for Foundations, footings, bases of columns etc. for mass
concrete | 8.78 | Sqm | 742.55 | ₹6,519.59 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_1068967.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .