| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹92,852.97 (0.47%)Admitted-Finance | ₹2.0 Cr+₹92,852.97 (0.47%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical 431 9 INDIRA UDHYAN MARG VIKASNAGAR DEHRADUN | - | - | Rejected-Technical As per SBD |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical GRAM POST BHETABAGDAR TEHSIL KAPKOT DISTRICT BAGESHWAR UTTARAKHAND UT | BAGESHWAR | UTTARAKHAND | 263619 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Bhawani Constructions L1 | SHREE GANPATI CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Maintenance of earthen shoulder with local soil with coolie walling after laying of top coat including supply of all material, labour and T&P etc. Required for proper completion of the work. | 10.8 | Km | 5,800 ₹62,640 Lowest | 6,000 ₹64,800 |
| 2.00 | Maintenance of unlined surface drains of average cross-sectional area 0.40 sqm include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907., Clause 307 | 9.6 | Km | 9,500 ₹91,200 Lowest | 10,000 ₹96,000 |
| 3.00 | WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform hickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 18.29 | Cum | 3,100 ₹56,699 Lowest | 3,191 ₹58,363.39 |
| 4.00 | Bituminous Macadam
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) | 15.27 | Cum | 9,900 ₹1,51,173 Lowest | 9,954 ₹1,51,997.58 |
| 5.00 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 610 | Sqm | 14 ₹8,540 Lowest | 14.4 ₹8,784 |
| 6.00 | Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (for Grading-II (bituminous binder @ 5.4 % of mix)) | 1,417.5 | Cum | 12,400 ₹1,75,77,000 Lowest | 12,440 ₹1,76,33,700 |
| 7.00 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 47,250 | Sqm | 14 ₹6,61,500 Lowest | 14.4 ₹6,80,400 |
| 8.00 | Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. | 2,520 | Sqm | 520 ₹13,10,400 Lowest | 523 ₹13,17,960 |
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
13 May 2025, 11:00 amClosed
Superintending Engineer
Office of the Superintending Engineer 6th Circle P.W.D. Uttarkashi
Under annual maintenance, renovation work by BC in Km 60, 63, 64, 65, 67, 68, 70, 74, 75, 76, 77 and 78 of Tyuni-Purola-Naugaon motor road in district Uttarkashi.
2025_pwd_82406_1
1124/56-M-06/2024-25 DT 27-03-2025
Open Tender
Civil Works - Roads
Item Rate
270 days
PUROLA
As per SBD
2 documents required · 2 mandatory
₹5,900
Executive Engineer C.D. P.W.D. Purola
₹4.7 L
24 May 2025
5 Apr 2025
13 May 2025
5 Apr 2025
13 May 2025
18 Apr 2025
Amount
Maintenance of earthen shoulder with local soil with coolie walling after laying of top coat including supply of all material, labour and T&P etc. Required for proper completion of the work.
Maintenance of unlined surface drains of average cross-sectional area 0.40 sqm include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1907., Clause 307
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform hickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Bituminous Macadam Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD)
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (for Grading-II (bituminous binder @ 5.4 % of mix))
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing and laying of hot applied thermoplastic compound of ISI Mark Approved Quality of 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
SHREE GANPATI CONSTRUCTION (BID ID -379430)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .