Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.0 LAccepted-AOC | ₹8.0 L | 1 | Accepted-AOC Lowest rate quoted |
| 2 | 2₹8.3 L+₹28,682.08 (3.60%)Rejected-AOC | ₹8.3 L+₹28,682.08 (3.60%) | 2 | Rejected-AOC Highest rate quoted |
Tender Value
₹8.4 L
EMD Value
₹21,100
Closing Date
22 May 2026, 4:00 pmClosed
Assistant Executive Engineer
Electrical Sub Division Erattupetta
Re routing and Standardization of LT line at Valakam-Kadapuzha area under Electrical Section Erattupetta
2026_KSEB_849432_1
TENDER/2026-27/5250/10 dt. 06-05-2026
Open Tender
Electrical and Maintenance Works
Percentage
90 days
Under Electrical Section Erattupetta
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,006
₹21,100
23 Jun 2026
8 May 2026
25 May 2026
8 May 2026
22 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Standardization of LT | |||||
| 1.01 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 30 | Nos | 478.82 | ₹14,364.6 |
| 1.02 | Transporting one LT PSC pole by Head load - for an average distance of one km where transportation by hand cart is not possible. (normally limited to 0.3km). | 1 | E*km | 1,395.68 | ₹1,395.68 |
| 1.03 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. | 25 | Nos | 938.82 | ₹23,470.5 |
| 1.04 | Renewal of existing damaged/old LT stay with new stay in place including excavation of stay pit, erection of new stay, backfilling pit and refitting of all items and conveyance of all materials. | 10 | Nos | 1,191.82 | ₹11,918.2 |
| 1.05 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. | 10 | Nos | 217.45 | ₹2,174.5 |
| 1.06 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. | 6 | Nos | 434.91 | ₹2,609.46 |
| 1.07 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Soft Rock. | 5 | Nos | 651.32 | ₹3,256.6 |
| 1.08 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Rock. | 5 | Nos | 1,303.68 | ₹6,518.4 |
| 1.09 | Stringing, tensioning, fitting cross arms, insulators and binding, giving jumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT single phase 2 wire line including cutting and removing
tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. | 1,800 | meter | 21.21 | ₹38,178 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1435382.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.77 MB
Tendernotice_2.pdf
PDF • 0.90 MB
coverdetails.pdf
Other Document • 0.42 MB
tenderform.pdf
Tender Documents • 0.41 MB
conditionsmala.pdf
Tender Documents • 0.81 MB
declaration.pdf
Tender Documents • 0.38 MB
BOQ_1435382.xls
BOQ • 0.31 MB
conditionseng.pdf
Tender Documents • 0.42 MB
proforma.pdf
Tender Documents • 0.40 MB
dateextension2.pdf
PDF • 0.43 MB
tenderextension1.pdf
PDF • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .