Loading…
Loading…
Tender Value
₹3.1 L
EMD Value
₹4,000
Closing Date
15 May 2026, 6:00 pmClosed
Deputy Executive Engineer
Providing G.I. Pipe Ralling To The Bridge Of Dhundhiya Pipliya Road Of Vadiya Irrigation Scheme. (3rd Attempt)
300521
1 of 2026-27.
Open
Civil - All
Amreli
13 documents required · 6 mandatory · 7 optional
₹600
Deputy Executive Engineer, Irrigation Sub Division No.4,Dhari
₹4,000
2 May 2026
2 May 2026
2 May 2026
15 May 2026
2 May 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50Cr.)
AMRELI IRRIGATIONDIVISION – AMRELI
Name of Providing G.I. Pipe Railing to The Bridge of Dhundhiya Pipliya Road of Vadiya Irrigation
MEMORANDUM SHOWING ITEMS OF WORK TO BE CARRIED OUT
Item Qty. Description of Item (with brief specification and Unit Amount
No reference to book of specifications) Estimated Rate
Earthwork / Back filling with selected earth brought
1 from out side borrow area or from excavated useful One Hundred Twelve
167.00 material incl. watering ramming, Compaction with 112.50 Rupees And Fifty Cum.
pneumatic temping and all lead and lift etc complete. Paisa Only
Providing and fixing G.I.Pipe railing ( B-class medium
duty ) as per design of 1.0 mt height, using 75x75x10
One Thousand Nine
2 mm size M.S Angle at 2.0 mt c/c for vertical posts and
150.00 1942.00 Hundred Forty Two Rmt.
38 mm dia G.I.Pipe for 4 horizontal rows incl one coat Rupees Only
of red oxide primer & two coats of oil paint etc
(Three Lakh Ten Thousand Eighty Seven Rupees And Fifty Paisa Only)
I/We am/are willing to carry out the work at .............% ..................................percent above / below (should be written in figures and words) of
the estimated rates mentioned above. Amount of my/our tender works out as under.
Estimated Amount put to tender Rs.
Estimated Amount put to tender Rs.
Deduct ............% below Rs……………………… Add ............% above Rs………...………
Net Rs…………………… .. Total Rs. Rs…………………
(Please strike out whichever is not applicable.)
All works shall be carried out as per Public Works Depart. Hand Book and other specifications of the department as directed. All the
columns in the Schedule-B should be filled in ink and the total of the entries in the last column should be struck by the contractor under his
Rates quoted include clearance of site (Prior commencement of work and at its close) in all respects and hold good for work under all
conditions of site, moisture, weather etc. complete.
Sign of Contractor:
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 of 2026 27.pdf
SBD GI Pipe.pdf
Schedule-B Gi Pipe.pdf
Download all tender documents and submit your bid