| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-AOC BANAMALIPUR AGARTALA TRIPURA WEST PIN 799001 | AGARTALA | WEST TRIPURA | TRIPURA | 799001 | ₹5.1 L | 1 | Accepted-AOC Ok |
| Sl No | Description | Qty | Unit | SUBRATA GHOSH H1 |
|---|---|---|---|---|
| 1.00 | “Dismantling & demolishing of existing school building of Ranirganj Girls H.S. School under Ranirbazar Municipal Council, West Tripura during the year 2025-26 Under RD Jirania Division”. | 18,68,443 | Sqtf | 5,10,000 ₹5.1 L |
| 2.00 | Making, providing and fitting fixing of wooden structure with
50x25mm wooden battens in frames of fascia (size-4ft height and
length as per stall size around the shed) and fixed in position with
necessary nails, screws & Gl wire covered by new dhoom cloth
(By-Colour or Tri-colour as decided by authority) as per direction
of Eng-in-charge. (After completion of the programme, agency
will be bound to dismantle the construction within 3(three) days
with his/her own cost. For that, no extra charge will be claimed by
the concerned agency. The dismantled of construction materials
will be the asset of the concerned agency) | 3,780 | Sqft | - |
| 3.00 | Hiring charges of decoration of ceiling of VIP/Audience shed &
other work, side screen, view curter etc. with new dhoom cloth
(By-Colour or Tri-colour as decided by authority) including
necessary bamboo/ wooden structure including fitting fixing
complete as per direction of Engg-in-charge. (After completion of
programme materials will be the assets of concern agencies) | 38,956.5 | Sqft | - |
| 4.00 | Hiring charges supplying and fitting fixing of POLYETHYLENE
(HDPE) TARPAULINS for shed and covering the side wall with
proper fastening system including irrection in position, fitting
fixing etc. complete as per direction of the Eng-in-charge. | 1,880 | Sqft | - |
| 5.00 | Manufacturing and decoration of Food Stall of size 4ft x 8ft by
wooden structure with 50x25mm wooden batten of table height
0.75mtr with a table top made by 6-10mm thick good quality ply
wood over necessary wooden framed structure and covered by
new dhoom dhoom cloth. The roof cover of food stall will be four
side slopping roof at a height of 2.40mtr ceiling with necessary
wooden frame structure fixed over four nos barak bamboo post
properly decorate with new dhoom cloth with necessary structure
made by 50x25mm wooden frame as per drawing and direction of
Engineer-in-Charge. (In the time of measurement only table top
area will be considered) (After completion of programme
materials will be the assets of concern agencies) | 384 | Cum | - |
| 6.00 | Repairing and maintenance of wooden Dias/Platform by changing
wooden plank of 40mm thick, frames of dais (75x50mm) and
wooden post of (100x100mm) as and where necessary including
necessary nails etc. complete as per direction of engg-in-charge. | 0.25 | No | - |
| 7.00 | Construction of temporary urinal point (size 1.2m x 1.20m x 1.80
m) at diffrernt location in mela ground by using double layer dhari
mat wall & shutter of door with split bamboo battens 40mm wide
including tying with Gl wire irrection in position, fitting fixing etc.
and 2 nos bricks for foot step with a sock pit point (size 0.9m dia
and 1.20m depth) and covered by barak bamboo and earth over
75mm to 100mm dia barak bamboo complete as per direction of
Eng-in-charge.(After completion of programme materials will be
the assets of concern agencies) | 6 | No | - |
| 8.00 | Hiring charges of temporary VIP toilet with Commode by using
6mm thick ply wood wall & floor, Wooden structure, PVC door
and irrection in position, fitting fixing and painting as per required
shed with provision for door shutter & locking arrangement etc.
and excavation of pit 0.75 m dia and 1.20m depth incl. cover of pit
by barak bamboo and earth over 75mm to 100mm dia barak
bamboo complete as per directionof Eng-in-charge.(after
completion of programme materials will be concern agencies). | 1 | Cum | - |
| 9.00 | Supplying, spreading and filling of sand (course) in the Assam
Rifles ground and Raj Bhaban wherever required as per direction
of Eng-in-Chaige. | 9 | Sqft | - |
| 10.00 | Hiring Charge of Carpet including laying and fixing in position by
maintaining proper column & rows including loading unloading
and carrying complete as per direction of Eng-in-charge. | 28,750 | sqmtr | - |
Tender Value
₹18.7 L
EMD Value
₹37,369
Closing Date
15 Dec 2025, 3:00 pmClosed
Executive Engineer, RD Jirania Division
O/o the EE, RD Jirania Division, Jirania
Dismantling and demolishing of existing school building of Ranirganj Girls H.S. School under Ranirbazar Municipal Council, West Tripura during the year 2025-26 Under RD Jirania Division
2025_CERDD_66619_3
e-DA-01/EE/JRN/RNRGNJ-HS DT-28/10/2025
Auction
Civil Works
30 days
As per DNIA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹37,369
26 Mar 2026
10 Dec 2025
15 Dec 2025
10 Dec 2025
15 Dec 2025
10 Dec 2025
“Dismantling & demolishing of existing school building of Ranirganj Girls H.S. School under Ranirbazar Municipal Council, West Tripura during the year 2025-26 Under RD Jirania Division”.
Making, providing and fitting fixing of wooden structure with 50x25mm wooden battens in frames of fascia (size-4ft height and length as per stall size around the shed) and fixed in position with necessary nails, screws & Gl wire covered by new dhoom cloth (By-Colour or Tri-colour as decided by authority) as per direction of Eng-in-charge. (After completion of the programme, agency will be bound to dismantle the construction within 3(three) days with his/her own cost. For that, no extra charge will be claimed by the concerned agency. The dismantled of construction materials will be the asset of the concerned agency)
Hiring charges of decoration of ceiling of VIP/Audience shed & other work, side screen, view curter etc. with new dhoom cloth (By-Colour or Tri-colour as decided by authority) including necessary bamboo/ wooden structure including fitting fixing complete as per direction of Engg-in-charge. (After completion of programme materials will be the assets of concern agencies)
Hiring charges supplying and fitting fixing of POLYETHYLENE (HDPE) TARPAULINS for shed and covering the side wall with proper fastening system including irrection in position, fitting fixing etc. complete as per direction of the Eng-in-charge.
Manufacturing and decoration of Food Stall of size 4ft x 8ft by wooden structure with 50x25mm wooden batten of table height 0.75mtr with a table top made by 6-10mm thick good quality ply wood over necessary wooden framed structure and covered by new dhoom dhoom cloth. The roof cover of food stall will be four side slopping roof at a height of 2.40mtr ceiling with necessary wooden frame structure fixed over four nos barak bamboo post properly decorate with new dhoom cloth with necessary structure made by 50x25mm wooden frame as per drawing and direction of Engineer-in-Charge. (In the time of measurement only table top area will be considered) (After completion of programme materials will be the assets of concern agencies)
Repairing and maintenance of wooden Dias/Platform by changing wooden plank of 40mm thick, frames of dais (75x50mm) and wooden post of (100x100mm) as and where necessary including necessary nails etc. complete as per direction of engg-in-charge.
Construction of temporary urinal point (size 1.2m x 1.20m x 1.80 m) at diffrernt location in mela ground by using double layer dhari mat wall & shutter of door with split bamboo battens 40mm wide including tying with Gl wire irrection in position, fitting fixing etc. and 2 nos bricks for foot step with a sock pit point (size 0.9m dia and 1.20m depth) and covered by barak bamboo and earth over 75mm to 100mm dia barak bamboo complete as per direction of Eng-in-charge.(After completion of programme materials will be the assets of concern agencies)
Hiring charges of temporary VIP toilet with Commode by using 6mm thick ply wood wall & floor, Wooden structure, PVC door and irrection in position, fitting fixing and painting as per required shed with provision for door shutter & locking arrangement etc. and excavation of pit 0.75 m dia and 1.20m depth incl. cover of pit by barak bamboo and earth over 75mm to 100mm dia barak bamboo complete as per directionof Eng-in-charge.(after completion of programme materials will be concern agencies).
Supplying, spreading and filling of sand (course) in the Assam Rifles ground and Raj Bhaban wherever required as per direction of Eng-in-Chaige.
Hiring Charge of Carpet including laying and fixing in position by maintaining proper column & rows including loading unloading and carrying complete as per direction of Eng-in-charge.
Hiring charges of providing and laying flat brick soling layer on prepared subgrade according to lines, rades and cross-section shown on the drawing, filling joints with fine sand free from clay , watering and rolling the same as per direction of Engg-in-charge. (After completion of programme materials will be the assets of concern agencies)
Construction of temporary single GCI sheet roof shed (Superstructure) for LED Screen of height range 20ft to 25ft and size of shed 32ft x 8ft as per instruction and one intermidite wooden platform at a height of 10ft properly braced by the wooden plank and l.50m interval intermediate post 75 mm to 100mm dia Barak bamboo post, post plate, rafter, purline top & bottom for GCI sheet roofing tying with Gl Wire/rope with one wooden or bamboo made ladder to reach upto platform including the cost of loading unloading and caring tying, fitting fixing complete as per direction of Eng- in Charge. The three side of the shed will be covered by the dark shed dhoom cloth to prevent passing light. (After completion of the programme, the agency will be bound to dismantle the construction within 3(three) days with his/her own cost. For that, extra charge will not be claimed by the concerned agency. The dismantled of construction materials will be the asset of the concerned agency)
Hiring charges of providing and fitting fixing of wooden platform & steps for stage/dias etc. of any size by using wooden post(Size- 0.10mx0.10m), runner(size- 0.076m x0.076m), wooden plank(thickness-0.04m) or 19/12mm ply wood and Nail (height as per requirement of platform)complete as per direction of Eng-incharge. (after completion of programme materials will be concern agencies).
Hiring charges of MS Steel made truss more than 25 feet clear span including including fitting-fixing in position by maintaining proper connection without leckage etc. in cluding carrying, loading-unloading complete as per direction of Eng-in-charge. (After completion programme materials will be the assets of concern agencies)
Hiring charges of providing and fitting fixing of LED light (18/20 watt) on hire basis at ceiling in position including providing electric connection with necessary wire wire (copper) as per instruction of Engg-in charge.
Hiring charges of providing and fitting fixing of LED tube light (20 watt) on hire basis at ceiling in position including providing electric connection with necessary wire wire (copper) as per instruction of Engg-in charge.
Hiring charges of Cooler including fitting-fixing in position by maintaining proper connection with wire wire (copper) without leckage etc. including carrying, loading-unloading complete as per direction of Eng-in-charge. (After completion of programme materials will be concern agencies).
Hiring charges of Ceilling Fan including fitting-fixing in position by maintaining proper connection with wire wire (copper) without leckage etc. in cluding carrying, loading-unloading complete as per direction of Eng-in-charge. (after completion of programme materials will be concern agencies).
Hiring charges of Stand Fan including fitting-fixing in position by maintaining proper connection with wire wire (copper) without leckage etc. including carrying, loading-unloading complete as per direction of Eng-in-charge. (after completion of programme materials will be concern agencies).
Hiring Charges of plastic chair with or without arm as desired by the authority including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.
Hiring Charges of TFDPC Made wooden armed chair with cushion including the cost of laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.
Hiring Charges of Executive class Sofa Set with white towel for covering the sofa set including laying in position of rows and column as desired by the tendering authority and loading, unloading, carrying and stacking complete as directed by the Engg-in-Charge.
Hiring Charges of 4ft dia round table with 19mm ply/wooden top and big umbrella including double layer decorative table cover with new good quality heavy cloth ( colour and quality of cloth as desired by the tendering authority) for covering the table including laying in position of rows and column and loading, unloading, carrying and stacking complete as directed by the Engg-in- Charge.
Fabrication/repairing charge of old rolling shutter, collapsible gate etc.
Manufacturing & supplying of MS grill incl. arrow for boundary wall as per reqd. design & specification
Manufacturing, supplying incl. fabrication of minor shed for any output unit, stand (base) for water tank, sign board and other minor structure (No materials will be issued from department)
MS hard drawn steel wire fabric (75x25mm mesh weight not less than 7.75 Kg/ sqm).
Manufacturing & supplying of complete M.S. ornamental grill with square bar of size 20mm / 25 mm.
Manufacturing & supplying of complete Steel window made with M.S. ornamental grill with square bar of size 20 / 25 mm including shutter frame but excluding shutter.
Manufacturing and supplying of MS chain link (made of GI wire, 100 mm x 100 mm , 8 G)
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
water supply
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
PNIA04.pdf
Additional Documents • 0.09 MB
DNIA01Ranirganj.pdf
Tender Documents • 0.29 MB
BOQ_69427.xls
BOQ • 0.96 MB
Download all tender documents and submit your bid