| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹3.5 L+₹15,018.71 (4.42%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | PRABHAKARAN P L1 | HARILAL T V L2 |
|---|---|---|---|---|---|
| 1.00DRINKING WATER SUPPLY SCHEME | |||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 49 | sqm | 7.65 ₹374.85 Lowest | 7.98 ₹391.02 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 26.53 | cum | 212.47 ₹5,636.19 Lowest | 221.76 ₹5,882.63 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 212.21 | cum | 107.99 ₹22,916.99 Lowest | 112.77 ₹23,931.37 |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 50 | hour | 285.34 ₹14,267 Lowest | 297.43 ₹14,871.5 |
| 1.00 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 3.21 | cum | 8,132.91 ₹26,122.91 Lowest | 8,476.4 ₹27,226.2 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 256.96 | kilogram | 92.18 ₹23,686.57 Lowest | 96.77 ₹24,866.02 |
| 1.01 | 23.8:Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine /medium/coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer- in- charge. | 3.21 | cum | 1,532.12 ₹4,921.17 Lowest | 1,596.74 ₹5,128.73 |
| 1.01 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 64.24 | sqm | 254.63 ₹16,358.45 Lowest | 265.95 ₹17,085.69 |
| 1.01 | OD513657/2024-2025:od485449/2019_2020 :Laterite masonry in CM 1:6 using neatly dressed laterite stone of size 35x20x20 cm for
foundation and basement including all cost of maretrials labour charges etc complete for foudation and
basement | 18.87 | cum | 5,020.4 ₹94,744.99 Lowest | 5,232.26 ₹98,743.21 |
Tender Value
₹3.9 L
EMD Value
₹9,686
Closing Date
1 Oct 2026, 6:00 pmClosed
ae lsgd
AELSGD KCGP
Annual Plan-Pro.No.313/2025-26 Palathera Comprehensive Drinking water Project -Well construction in Kayyur cheemeni gp- General Civil
2026_LSGD_871328_24
AE/LSGD/KCGP/TEN/01/26-27
Open Tender
Civil Works - Others
Item Rate
60 days
Cheemeni
Please refer Tender documents.
8 documents required · 8 mandatory
₹855
Yes
₹9,686
Yes
7 Oct 2026
24 Sept 2026
3 Oct 2026
24 Sept 2026
1 Oct 2026
24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DRINKING WATER SUPPLY SCHEME | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 49 | sqm | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 26.53 | cum | - | - |
| 1.003 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 212.21 | cum | - | - |
| 1.004 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 50 | hour | - | - |
| 1.005 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 3.21 | cum | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 256.96 | kilogram | - | - |
| 1.007 | 23.8:Gravel packing in tube well construction in accordance with IS: 4097, including providing gravel fine /medium/coarse, in required grading & sizes as per actual requirement, all complete as per direction of Engineer- in- charge. | 3.21 | cum | - | - |
| 1.008 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 64.24 | sqm | - | - |
| 1.009 | OD513657/2024-2025:od485449/2019_2020 :Laterite masonry in CM 1:6 using neatly dressed laterite stone of size 35x20x20 cm for
foundation and basement including all cost of maretrials labour charges etc complete for foudation and
basement | 18.87 | cum | - | - |
stage.html
html • 0.02 MB
finance_1479848.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_1479848.xls
BOQ • 0.31 MB
biddoc.pdf
Tender Documents • 1.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .