| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC | ₹8.5 L Quoted ₹8.7 L | L1 | Accepted-AOC Agreement Executed |
| 2 | L2₹8.8 LRejected-Finance | ₹8.8 L | L2 | Rejected-Finance L2.Rejected |
| Sl No | Description | Qty | Unit | ABDUL KHADER V P L2 | K.M MUJEEB RAHIMAN L1 |
|---|---|---|---|---|---|
| 1.00CC Drain &Foot Path | |||||
| 1.00 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 82.95 | cum | 84.27 ₹6,990.20 | 83.5 ₹6,926.33 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 17.27 | cum | 7,606.17 ₹1.3 L | 7,537.02 ₹1.3 L |
| 1.00 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 22.8 | cum | 8,804.4 ₹2.0 L | 8,724.36 ₹2.0 L |
| 1.00 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 13.3 | cum | 9,562.96 ₹1.3 L | 9,476.02 ₹1.3 L |
| 1.00 | 13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications | 0.65 | MT | 1,04,693 ₹67,841.06 | 1,03,741.3 ₹67,224.36 |
| 1.01 | 8.1.A:Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC Using Concrete Mixer on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409 | 80 | metre | 495.37 ₹39,629.60 | 490.87 ₹39,269.60 |
| 1.01 | 8.21:Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8 metres high (Tubular Steel Railing on Precast RCC Posts, 1.2 m High Above Ground Level) with 3 holes 50 mm dia for pipe, fixed 2 metres centre to, complete as per approved drawing | 60 | metre | 3,029.18 ₹1.8 L | 3,001.64 ₹1.8 L |
| 2.00Appendix B | |||||
| 2.00 | 11.20.2:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Medium shade pigment using 50% white cement 50 % Grey cement | 80 | sqm | 1,505.24 ₹1.2 L | 1,491.56 ₹1.2 L |
Tender Value
₹8.0 L
EMD Value
₹19,907
Closing Date
29 Sept 2025, 5:00 pmClosed
Assistant Executive Engineer
AssistantExecutive Engineer, PWD Roads SubDivision, Kasaragod
GENERAL- Construction of foot paths in Arikady -Puthige Road B/W chainage 5/000 to 10/000 as per WP(C) No. 30062/2022(Suo Moto Case) under roads section Manjeshwar in Manjeshwar Constituency.-2023-24-General Civil Work
2025_PWD_799599_1
D1/TD/2/etender/2025-26
Open Tender
Civil Works - Roads
180 days
PWD Kasaragod
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,760
₹19,907
4 Mar 2026
19 Sept 2025
3 Oct 2025
19 Sept 2025
29 Sept 2025
19 Sept 2025
Amount
CC Drain &Foot Path
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
8.1.A:Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC Using Concrete Mixer on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
8.21:Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast M20 grade RCC vertical posts1.8 metres high (Tubular Steel Railing on Precast RCC Posts, 1.2 m High Above Ground Level) with 3 holes 50 mm dia for pipe, fixed 2 metres centre to, complete as per approved drawing
Appendix B
11.20.2:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Medium shade pigment using 50% white cement 50 % Grey cement
ABDUL KHADER V P (BID ID -2362436)
Bidder Name
ABDUL KHADER V P
K.M MUJEEB RAHIMAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid