Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | ₹8.0 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | MANSOOR P.A L1 |
|---|---|---|---|---|
| 1.00Construction of water tank | ||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 6.91 | cum | 359.72 ₹2,486.38 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.58 | cum | 7,932.89 ₹4,569.34 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.3 | cum | 10,488.77 ₹34,654.90 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.29 | cum | 12,772.18 ₹1.3 L |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.51 | cum | 13,442.14 ₹47,168.47 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 7.2 | sqm | 386.16 ₹2,780.35 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 22.1 | sqm | 961.24 ₹21,243.40 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 84 | sqm | 1,008.55 ₹84,718.20 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,098.74 | kilogram | 112.43 ₹2.4 L |
Tender Value
₹8.0 L
EMD Value
₹20,122
Closing Date
11 Nov 2025, 4:00 pmClosed
AE Erattupetta Municipality
O/o the AE LID EW Erattupetta Municipality
Annual Plan-Erattupetta Municipality PRO NO 173/2025-26-CONSTRUCTION OF WATER TANK ANNIPADI DRINKING WATER PROJECT IN WARD 25 - Retender
2025_LSGD_812394_2
E2-2508771/25 Dt 21-10-2025
Open Tender
Civil Works - Water Works
180 days
Erattupetta Municipality
Please refer Tender documents.
12 documents required · 12 mandatory
₹1,775
Yes
₹20,122
Yes
16 May 2026
4 Nov 2025
12 Nov 2025
4 Nov 2025
11 Nov 2025
4 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
TenderDoc.pdf
Tender Documents • 3.13 MB
viewsbd.pdf
Tender Documents • 1.73 MB
BOQ_1370957.xls
BOQ • 0.31 MB
viewnit.pdf
Additional Documents • 0.03 MB
Download all tender documents and submit your bid