Loading…
Loading…
Tender ID
Tender Value
₹12.3 L
EMD Value
₹13,000
Closing Date
7 Feb 2026, 6:00 pmClosed
Executive Engineer, Und Irrigation Division, Jamnagar
RUPAREL WATER RESOURCES PROJECT Dewatering of Spillway Bucket of Ruparel WRP for Inspection.
269342
14 of 2025-26
Open
Civil - All
Works
Jamnagar
4 documents required · 3 mandatory · 1 optional
₹900
Yes
EXECUTIVE ENGINEER UND IRRIGATION DIVISION JAMNAGAR
₹13,000
Yes
24 Jan 2026
24 Jan 2026
24 Jan 2026
7 Feb 2026
24 Jan 2026
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 10 Cr. )
Name of Work :- Ruparel Water Resources Project
Dewatering of Spillway Bucket of Ruparel WRP for Inspection.
Item Description of Item (with brief Quantity Unit Rate In Amount
No. specification and reference to book of figures
specifications)
1 Dewatering for Earthen Dam and allied works, 41600.00 Hp. 27.00
foundation areas, pits, trenches etc. incl. cost of Hr.
pumping machineries, pipelines, labours diesel /
electricity / DG Set, etc. complete.
2 Desilting of various structures of canal and 360.00 Cum. 296.00
distribution system including depositing the same
as directed with all lift and lead for canal syphone,
air vent, Turn Out Kundies etc complete.
I am/we are willing to carry out the work at ____________________ % below/above percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of
My/Our tender works out as under :-
Estimated Amount Rs. 12,29,760=00 Estimated Amount Rs. 12,29,760=00
Put to Tender Rs. Put to Tender Rs.
Deduct _______% Below Rs. __________ Add _______% Above Rs. __________
Net Rs. Net Rs.
(Rupees in words) ________________________ (Rupees in words) ________________________
1. The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2. The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3. GST and Income tax TDS will be deducted at a source while making payments of bills
4. In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt.G.R.:PRC-10/2017CementConsumption/16/CDate:11/05/2017as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender. DELETED
5. The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other
levies except GST payable by the contractor under the contract.
Executive Engineer
Signature of Contractor Und Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice No.14.pdf
5.pdf
price bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .