| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.2 CrAccepted-AOC | ₹11.2 Cr | 1 | Accepted-AOC As per term and condition. |
| 2 | 2₹11.3 Cr+₹2.0 L (0.18%)Rejected-AOC | ₹11.3 Cr+₹2.0 L (0.18%) | 2 | Rejected-AOC As per term and condition. |
| 3 | 3₹13.1 Cr+₹1.9 Cr (16.8%)Rejected-AOC | ₹13.1 Cr+₹1.9 Cr (16.8%) | 3 | Rejected-AOC As per term and condition. |
| 4 | 4₹13.7 Cr+₹2.4 Cr (21.5%)Rejected-AOC | ₹13.7 Cr+₹2.4 Cr (21.5%) | 4 | Rejected-AOC As per term and condition. |
| 5 | 5₹14.2 Cr+₹3.0 Cr (26.3%)Rejected-AOC D NO 8 2 334 K 1 5TH FLOOR 503 AND 504 ADITYA COURT ROAD NO 05 BANJARA HILLS HYDERABAD 500034 TELANGANA HYDERABAD TELANGANA 500034 | HYDERABAD | TELANGANA | 500034 | ₹14.2 Cr+₹3.0 Cr (26.3%) | 5 | Rejected-AOC As per term and condition. |
Tender Value
₹11.6 Cr
EMD Value
₹20 L
Closing Date
22 Feb 2025, 12:00 pmClosed
ED
ED HEEP and CFFP, Haridwar
Design, Fabrication, Supply and Erection / Commissioning of Pre-Engineered Building (PEB) Structure, Replacement of old Fabrication and Assembly Roof sheds and its EOT Crane Rail under DABG Expansion Project Phase-III in HEEP, BHEL, Haridwar
2025_BHEL_44280_1
BHEL/HEEP/WEX/202403191 Dt.23.01.2025
Open Tender
Civil Works
Percentage
420 days
HEEP-Haridwar
Design, Fabrication, Supply and Erection / Commissioning of Pre-Engineered Building (PEB) Structure, Replacement of old Fabrication and Assembly Roof sheds and its EOT Crane Rail under DABG Expansion Project Phase-III in HEEP, BHEL, Haridwar
3 documents required · 3 mandatory
₹0
₹20 L
FCX office
11 Jun 2025
23 Jan 2025
22 Feb 2025
23 Jan 2025
22 Feb 2025
23 Jan 2025
3 Feb 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of materials by mechanical transport including loading, unloading and stacking: Lime, moorum, building rubbish:3 km Unit:cum ( S.l.No. : 1.1.1.3) Page No.: 62 | 20 | cum | 1 | ₹19.98 |
| 2 | Carriage of materials by mechanical transport including loading, unloading and stacking: Steel:3 km Unit:tonne ( S.l.No. : 1.1.11.3) Page No.: 63 | 58 | tonne | 1 | ₹57.94 |
| 3 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Unit:kg ( S.l.No. : 10.2) Page No.: 176 | 10,000 | kg | 66.5 | ₹6,65,000 |
| 4 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.:In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete Unit: kg ( S.l.No. : 10.25.1 ) Page No.: 179 | 14,000 | kg | 67.2 | ₹9,40,800 |
| 5 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.:In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works Unit: kg ( S.l.No. : 10.25.2) Page No.: 179 | 5,000 | kg | 77.9 | ₹3,89,500 |
| 6 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. :On steel work Unit:Sqm ( S.l.No. : 13.52.1) Page No.: 226 | 436 | Sqm | - | - |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : :Two or more coats on new work. Unit:Sqm ( S.l.No. : 13.61.1) Page No.: 227 | 436 | Sqm | 53.85 | ₹23,478.6 |
| 8 | Painting with aluminium paint of approved brand and manufacture to give an even shade . :Two or more coats on new work Unit:Sqm ( S.l.No. : 13.63.1) Page No.: 227 | 2,805 | Sqm | - | - |
| 9 | Refixing old glass panes with putty and nails Unit:Sqm ( S.l.No. : 14.1) Page No.: 238 | 2,405 | Sqm | 224.45 | ₹5,39,802.25 |
| 10 | Taking out wind ties from roof including cutting out rusted bolts, nuts etc. and removing materials to any distance within compound and stacking. Unit:Kg ( S.l.No. : 14.19) Page No.: 239 | 8,545 | Kg | - | - |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tenderdocument.pdf
Tender Documents • 1.48 MB
BOQ.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .