| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹66.4 LAdmitted-Finance | -13.35% | ₹66.4 L | L1 | Admitted-Finance |
| 2 | L2₹71.9 L+₹5.5 L (8.36%)Admitted-Finance | -6.11% | ₹71.9 L+₹5.5 L (8.36%) | L2 | Admitted-Finance |
| 3 | L3₹72.4 L+₹6.0 L (9.06%)Admitted-Finance | -5.50% | ₹72.4 L+₹6.0 L (9.06%) | L3 | Admitted-Finance |
| 4 | L4₹75.8 L+₹9.5 L (14.3%)Admitted-Finance | -1.00% | ₹75.8 L+₹9.5 L (14.3%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹76.6 L
EMD Value
₹1.8 L
Closing Date
9 Apr 2026, 5:00 pmClosed
DIRECTOR(H)
SECTOR-39, NOIDA
D/o Parks Construction of Gazebo Hut in the SDF sector-15A, Khargosh parks sector -54 and different parks of sector-20, 15, 16, 27. NOida
2026_NOIDA_1130835_1
40/D(H)/DD(H)-I/2025-26
Open Tender
Civil Works - Others
Fixed-rate
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,832
NOIDA
₹1.8 L
7 Aug 2026
27 Mar 2026
10 Apr 2026
27 Mar 2026
9 Apr 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m, as directed by Engineer-in-charge. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. (DSR Code No.-2.6.1) AOR | - | Cum. | - | - |
| - | Earth work in excavation by mechanical means (hydraulic excavater)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 Sqm. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. All kinds of soil. (DSR Code No.-2.8.1) AOR | - | Cum. | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) (DSR Code No.-4.1.8) AOR | - | Cum. | - | - |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) (DSR Code No.-5.1.2) AOR | - | Cum. | - | - |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars (DSR Code No.-5.22.3) AOR | - | Kg. | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete (DSR-18/ Item Code.No-5.9.1) AOR | - | Sqm. | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers (DSR Code No.-5.9.5) AOR | - | Sqm | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts (DSR-18 Code.No-5.9.6) AOR | - | Sqm. | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform (DSR Code No.-5.9.3) AOR | - | Sqm. | - | - |
| - | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in : Cement mortar 1:4 (1 cement : 4 coarse sand) (DSR Code No.-6.1.1) AOR | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_2109676.xls
BOQ • 0.36 MB
40.pdf
Tender Documents • 5.70 MB
NITspecialconditions2026.pdf
Additional Documents • 2.52 MB
Capability_C2026.xls
Additional Documents • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .