| Sl No | Description | Qty | Unit | K SARAVANAN L2 | P. Jaisankar L1 |
|---|---|---|---|---|---|
| 1.00 | Strengthening of the road From Eragudi to Reddiyappatti Road in Eragudi Panchayat ( Km 0 / 0 - 1/00 - Maintenance & Km 1/00 - 3/230 - Strengthening ) ( R - 87 PUR ) Clearing the Scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by the departmental officers including all incidental charges etc., complete. Km 0/0 - 3/230 | 3,156 | Sqm | 8 ₹25,248 | 6.3 ₹19,882.8 Lowest |
| 2.00 | Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers | 2,783.87 | Sqm | 25 ₹69,596.75 | 23.3 ₹64,864.17 Lowest |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A Km 0/0 - 3/230 | 709.71 | Cum | 155 ₹1,10,005.05 | 140.45 ₹99,678.77 Lowest |
| 4.00 | Providing and laying including cost and conveyance of Gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content Km 0/0 - 1/0 | 1,089.15 | Cum | 385 ₹4,19,322.75 | 368.4 ₹4,01,242.86 Lowest |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. Km 1/0 - 3/230 | 1,252.75 | Cum | 2,800 ₹35,07,700 | 2,644.5 ₹33,12,897.38 Lowest |
| 6.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site Km 0/0 - 1/00 | 9.19 | Cum | 4,300 ₹39,517 | 4,233.5 ₹38,905.87 Lowest |
| 7.00 | Providing BT Patch work using 13.20 mm metal 25mm thick and 44 Kg of Bitumen per 1 Cum of Metal including cost and conveyance of all materials and all labour charges etc complete Km 0/0 - 1/00 | 4.17 | Cum | 4,925 ₹20,537.25 | 4,916.5 ₹20,501.81 Lowest |
| 8.00 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. Km 0/0 - 1/00 | 3,750 | Sqm | 38 ₹1,42,500 | 34.25 ₹1,28,437.5 Lowest |
| 9.00 | Providing and laying of Prime Coat using Emulsion (SS1) at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. Km 1/0 - 3/230 | 8,351.62 | Cum | 90 ₹7,51,645.8 | 86.4 ₹7,21,579.97 Lowest |
| 10.00 | Providing and laying Tack coat over WMM surface using 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.marea including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat Km 0/0 - 3/230 | 12,112.5 | Cum | 25 ₹3,02,812.5 | 20.19 ₹2,44,551.38 Lowest |
Tender Value
₹1.8 Cr
EMD Value
₹1.8 L
Closing Date
3 Sept 2025, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening of Eragudi to Reddiyarpatti road 0/0-3/2300 in Uppliyapuram Block, Tiruchirappalli District under MGSMT - 2025-26 (PHASE - III),pkg 14
2025_RDTN_593820_14
DIPR/4437/TENDER/2025
Open Tender
Civil Works - Roads
Item Wise
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.8 L
DRDA Tiruchirappalli
20 Nov 2025
18 Aug 2025
3 Sept 2025
18 Aug 2025
3 Sept 2025
18 Aug 2025
26 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .