Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L | L1 | Accepted-AOC First lowest |
| 2 | L2₹7.9 LRejected-AOC | ₹7.9 L | L2 | Rejected-AOC Second lowest |
| Sl No | Description | Qty | Unit | Alathur Labour Contract Co Operative Society Ltd L2 | SUKESH.S L1 |
|---|---|---|---|---|---|
| 1.00ROAD | |||||
| 1.00 | 2.7.B:Dismantling Stone Masonry as per Technical Specification Clause 202.<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.<br>(B) Rubble Stone Masonry in Cement Mortar | 6.4 | cum | 694.33 ₹4,443.71 | 647 ₹4,140.80 |
| 1.00 | OD189264/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains ( not exceeding 1.50 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.50 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil | 34.98 | cum | 341.03 ₹11,929.23 | 317 ₹11,088.66 |
| 1.00 | OD189267/2025-2026:DRY RUBBLE MASONRY - Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site | 79.37 | cum | 3,785.8 ₹3.0 L | 3,527 ₹2.8 L |
| 1.00 | OD216334/2025-2026:DR with departmental stone-Dry rubble masonry- Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels labour charges etc. complete as per direction of departmental officers at site. | 3.84 | cum | 1,626.65 ₹6,246.34 | 1,515 ₹5,817.60 |
| 1.00 | 11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III. P.C.C. grade M 20 (i) Nominal mix (1:2:4) | 3.18 | cum | 8,658.19 ₹27,533.04 | 8,068 ₹25,656.24 |
| 1.01 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.08 | tonne | 91,397.95 ₹7,311.84 | 85,170 ₹6,813.60 |
| 1.01 | OD215732/2025-2026:Filling with contractors own earth ( excluding rock ) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.50 m as per direction of site engineer- in-charge. | 34.98 | cum | 422.53 ₹14,780.10 | 393 ₹13,747.14 |
| 1.01 | OD215648/2025-2026:Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.50 m in all kinds of soil. | 285 | sqm | 33.44 ₹9,530.40 | 31 ₹8,835 |
| 1.01 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | 28.5 | cum | 3,037.47 ₹86,567.90 | 2,830 ₹80,655 |
Tender Value
₹9.3 L
EMD Value
₹23,169
Closing Date
12 Sept 2025, 5:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, LID And EW Sub Division, Alathur Block Panchayath
Alathur Block Panchayath-Annual Plan-2025-26-Kallattapparambu Gramam Road ,Side Protection-Proj No 82 in Kavassery Grama Panchayath
2025_LSGD_794065_1
07/AEE/ABP/2025-26
Open Tender
Civil Works - Roads
240 days
Alathur Block Panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,045
Yes
₹23,169
Yes
26 Dec 2025
3 Sept 2025
15 Sept 2025
3 Sept 2025
12 Sept 2025
3 Sept 2025
Amount
2.7.B:Dismantling Stone Masonry as per Technical Specification Clause 202.<br> Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.<br>(B) Rubble Stone Masonry in Cement Mortar
OD189264/2025-2026:Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains ( not exceeding 1.50 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.50 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
OD189267/2025-2026:DRY RUBBLE MASONRY - Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site
OD216334/2025-2026:DR with departmental stone-Dry rubble masonry- Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels labour charges etc. complete as per direction of departmental officers at site.
11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br>III. P.C.C. grade M 20 (i) Nominal mix (1:2:4)
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
OD215732/2025-2026:Filling with contractors own earth ( excluding rock ) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.50 m as per direction of site engineer- in-charge.
OD215648/2025-2026:Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.50 m in all kinds of soil.
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
10.3.B:Direction and place indentification signs up to 0.9 sqm size board <br> B. Semi-Reflective Traffic signs <br> Providing and erecting direction and place identifications of semi reflective sign boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. Supported and welded on 47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundations with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701
Alathur Labour Contract Co Operative Society Ltd (BID ID -2328472)
Bidder Name
SUKESH.S
Alathur Labour Contract Co Operative Society Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid