Tender Value
₹10.9 Cr
EMD Value
₹21.7 L
Closing Date
12 Oct 2026, 11:30 am
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (RSP)
Above/Below/Par
SNT PROJEC
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-I, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Any Work in connection with Signaling Installation. The work shall include indoor wiring component also if tendered work involves indoor wiring alteration in the existing system. Note 1: Tenderer may be required to submit the schedule of those works, Completion/Performance Certificates of which have been submitted by him/her in support of 30/40/60 % (as the case may be) criterion of similar nature of work.
31 conditions · 22 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Upload filled & signed Annexure-D:"Declaration regarding constitution of firm".(Copy attached with Vol-I of tender document)
Upload filled and signed Annexure-M:"Mandatory Certificate to be submitted by tenderer alongwith the tender documents.". (Copy attached with Vol-I of tender document).
Upload filled & Signed Annexure-H: Work in Hand - in support of Bid Capacity (Mandatorily for tender value more than Rs.20 crore) (copy of format available in Vol-I of Tender Document).
Upload filled and signed Annexure-I:Detail of Contractual Payment received in previous three financial years and the current financial year.(Copy of format available in Vol-I of tender document)
Upload filled & signed Annexure-J:Real Time Gross Saving (RTGS)/National Electronic Fund Transfer(NEFT) Model Mandate Form (copy of format available in Vol-I of tender document)
Upload filled & signed Annexure-L: Completion Certificate(copy of format available in Vol-I of tender document)
Upload filled & signed Annexure-N: Contractual payment received in last three years - in support of Bid Capacity (Mandatorily for tender value more than Rs. 20 crore).(Copy of format available under Vol-I of tender document)
Upload filled & signed Annexure-Q: Mandatory undertaking Regarding Employment/ Partnership of Retired Railway Employees.(copy of format available in Vol-I of tender document).
Upload filled & signed Annexure K-3 & K-4: If tender submitted on behalf of Partnership Firm, relevant Annexures K-3 and K-4 as Declaration to be submitted by the tenderer alongwith tender document.
Upload filled & signed Annexure-D:"Declaration regarding constitution of firm".(Copy attached with Vol-I of tender document)
Upload filled and signed Annexure-M:"Mandatory Certificate to be submitted by tenderer alongwith the tender documents.". (Copy attached with Vol-I of tender document).
Upload filled & Signed Annexure-H: Work in Hand - in support of Bid Capacity (Mandatorily for tender value more than Rs.20 crore) (copy of format available in Vol-I of Tender Document).
Upload filled and signed Annexure-I:Detail of Contractual Payment received in previous three financial years and the current financial year.(Copy of format available in Vol-I of tender document)
Upload filled & signed Annexure-J:Real Time Gross Saving (RTGS)/National Electronic Fund Transfer(NEFT) Model Mandate Form (copy of format available in Vol-I of tender document)
Upload filled & signed Annexure-L: Completion Certificate(copy of format available in Vol-I of tender document)
Upload filled & signed Annexure-N: Contractual payment received in last three years - in support of Bid Capacity (Mandatorily for tender value more than Rs. 20 crore).(Copy of format available under Vol-I of tender document)
Upload filled & signed Annexure-Q: Mandatory undertaking Regarding Employment/ Partnership of Retired Railway Employees.(copy of format available in Vol-I of tender document).
Upload filled & signed Annexure K-3 & K-4: If tender submitted on behalf of Partnership Firm, relevant Annexures K-3 and K-4 as Declaration to be submitted by the tenderer alongwith tender document.
Upload filled & signed Annexure-D:"Declaration regarding constitution of firm".(Copy attached with Vol-I of tender document)
Upload filled & signed Annexure-D:"Declaration regarding constitution of firm".(Copy attached with Vol-I of tender document)
Upload filled and signed Annexure-M:"Mandatory Certificate to be submitted by tenderer alongwith the tender documents.". (Copy attached with Vol-I of tender document).
Upload filled & Signed Annexure-H: Work in Hand - in support of Bid Capacity (Mandatorily for tender value more than Rs.20 crore) (copy of format available in Vol-I of Tender Document).
Upload filled and signed Annexure-I:Detail of Contractual Payment received in previous three financial years and the current financial year.(Copy of format available in Vol-I of tender document)
Upload filled & signed Annexure-J:Real Time Gross Saving (RTGS)/National Electronic Fund Transfer(NEFT) Model Mandate Form (copy of format available in Vol-I of tender document)
Upload filled & signed Annexure-L: Completion Certificate(copy of format available in Vol-I of tender document)
Upload filled & signed Annexure-N: Contractual payment received in last three years - in support of Bid Capacity (Mandatorily for tender value more than Rs. 20 crore).(Copy of format available under Vol-I of tender document)
Upload filled & signed Annexure-Q: Mandatory undertaking Regarding Employment/ Partnership of Retired Railway Employees.(copy of format available in Vol-I of tender document).
Upload filled & signed Annexure K-3 & K-4: If tender submitted on behalf of Partnership Firm, relevant Annexures K-3 and K-4 as Declaration to be submitted by the tenderer alongwith tender document.
"S&T work for Interlocking of 28 Nos Non-Interlocked LC gates having TVU >20000 and < 50000 over Firozpur Division". List of LC-Gates:- ASR-KEMK Section 1 LC Gate (C-13), ASR-PTK Section 3 LC Gate (C-15,C-16,C-21), LDH-FZR Section 14 LC Gates (A-21,B1-30,A-41,B1-45,B2-49,B2-51,A-66,C-67,C-70,C-72,C-73,C-78,C-81,C- 84), JUC-FZR 2 LC Gates (C-4,C-5), BTI-FZR Section 4 LC Gates (C-45,C-51,C-56,C- 57), KKP-FKA Section 4 LC Gates (C-3,C-28,C-33,C-58).
01-SnT-PROJ-UMB-2026-27~NR
01-SnT-PROJ-UMB-2026-27
Open
Works - General
12 Months
Unknown (Unspecified Location)
₹0
₹21.7 L
18 Sept 2026
18 Sept 2026
28 Sept 2026
127 items across 4 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 11,14,326.92 | ||
| Design and preparation of wiring diagram for Level-Xing MACLS on the basis of approved interlocking plan,typical circuit diagram and as per Railway practice and latest rules prescribed by the Railway and obtaining approval of the competent authority. Designing , preparation of locking table, selection table, circuit diagram,contact analysis chart, relay rack chart etc, preparation of operating & indication panel Domino type diagram, (circuit shall be designed by the contractor with the use of Q series relays on the basis of approved signal Interlocking plan and obtaining approval of Competent Authority). The operating & indication panel may have addition & alteration to an extent of 5% variation in number of Domino. Designing should be as per Railway specifications and as per latest rules prescribed by Rly. This also includes preparation of cable route plan,Cable core chart,Station working rule diagram,Power supply arrangement,Cable termination chart in relay room and location boxes,Location wiring plan,Cable insulation chart,Fuse analysis,Indoor circuit diagram,Track circuit jumper plan,Terminal and Contact analysis chart,Outdoor circuits and other outdoor diagrams and obtaining approval of the engineer as per following :-Supply of 6 copies of complete set of superior quality paper including one set laminated,properly bound in file with cushioned cover. Software backup of complete set in the form of CD (2 Nos.) One complete set of tracings Design through CAD. Drawings in A-3 size & plan in bigger size papers. (six sets). (Inspection: JE/SSE/P/D&D). | — | — | — | 11,14,326.92 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TENDERDOCUMENTS28LCFZR.pdf TENDER DOCUMENT
ATTACHMENT
TypicalDrawingsofLCGates.pdf
ATTACHMENT
TENDERDOCUMENTS28LCFZR.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .