Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | L1 | Accepted-AOC Lower Side | |
| 2 | L2₹8.4 L+₹38,380 (4.79%)Rejected-Finance | L2 | Rejected-Finance Higher Side | |
| 3 | L3₹8.5 L+₹52,430 (6.54%)Rejected-Finance | L3 | Rejected-Finance Higher Side | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6.3 L
EMD Value
₹12,700
Closing Date
18 Jul 2020, 10:30 amClosed
Executive Engineer HPPWD Division Baijnath
Executive Engineer HPPWD Division Baijnath
Portion Barot to Nalhota Km 0/0 to 16/0 (SH Providing and Fixing Crash Barrier for Improvement of black spot at RD 4/195 to 4/395.)
2020_PWD_38572_1
PWD-BD-NIT-2019-20-4384-4425
Open Tender
Civil Works - Roads
Item Rate
60 days
Baijnath
Please refer Tender documents.
11 documents required · 11 mandatory
₹350
EE HPPWD Baijnath
₹12,700
11 Aug 2020
3 Jul 2020
18 Jul 2020
3 Jul 2020
18 Jul 2020
3 Jul 2020
Amount
Earth work in excavation for structures in all depths as per drawing and M.O.R.D.technical specification section 300 & 1600 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated Suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge, hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner, filling of unevenness and finishing the road to specified dimension or as directed by the Enginer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage, rain and other causes it shall be removed by suitable diversion, bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor which shall have to be duly compensated by him at his own cost .The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government.
Providing and laying mechanically mixed and vibrated reinforced cement concrete in open foundation of plain cement concrete of Grade M-20 (M-Twenty) designed mix with minimum cement contents of 350 kgs (Three hundred fifty kilogramms) per cubic meter with 20 mm (Twenty Milimeters) nominal size graded crushed/ broken stone aggregate and curing complete including the cost of form work complete as per drawings and MORD technical specifications Clause 802, 803,1202 & 1203 and as per the direction of Engineer-in-Charge including carriage of material within all leads and lifts and other incidentals .The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government.
Providing and erecting a “W” metal beam crash barrier comprising of 3mm thick corrugated sheet metal beam rail, 70cm above road / ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5mm spaced 2m centre to centre, 1.8m high, 1.1m below ground / road level, all steel parts and fitments to be galvanished by hot dip process, all fittings to conform to IS: 1367 and IS 1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150x75x5mm, 330 mm long complete as per clause 810 as per the direction of Engineer-in-charge including entire carriage of materials within all leads and lifts and other incidentals. The rate including of octroi, royality, Malkana, tolltax, Sale Tax or other taxes imposed by the government.
JAGBIR SINGH
Sangita Abrol
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .