| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.6 LAccepted-AOC | L1 | Accepted-AOC L1 bidder |
Tender Value
₹61.9 L
EMD Value
₹50,000
Closing Date
20 Jul 2024, 3:00 pmClosed
The Chief Engineer, Sports Kerala Foundation
Jimmy George Indoor Stadium, Vellayambalam, Thiruvananthapuram
Ground development work, Ground Protection Work and name board
2024_SKF_644196_5
152/SKF/CE/2023-24
Open Tender
Civil Works - Others
Item Rate
120 days
Thiruvananthapuram
Please refer Tender documents
6 documents required · 6 mandatory
₹2,950
₹50,000
19 Oct 2024
8 Jul 2024
22 Jul 2024
8 Jul 2024
20 Jul 2024
8 Jul 2024
Amount
Ground development work & Mud Football Court
2.28.1 : Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od199695/2023_2024 : Filling with contractor's own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering and rolling every 3rd and top most layer with power roller of minimum 8 tonnes, for all leads including all lifts involved as per the direction of site Engineer-in-charge. (Based on DSR Item No. 50.2.26.1 and 2.2.1)
od301802/2023_2024 : Sieving excavated Sand through sieve of I.S. designation 4.75 mm and collecting good quality sand for measurement including stacking. (Based on DSR 30.2.4.3)
od169566/2023_2024 : SKF_OD 7/2022-2023 Supplying and stacking for measurement sieved red earth at site including royalty and carriage upto 5 k.m. lead,all labour charges for stacking, loading and unloading etc complete.( Based on CPWD 30.2.2 & 30.2.4.3)
od169568/2023_2024 : SKF_OD 2/2022-2023 Mixing earth and sand in the required proportion specified or directed by the Officer-in-charge including all cost of labour charges,hire charges of machineries etc complete.(Based on CPWD 30.2.9)
od169569/2023_2024 : SKF_OD 3/2022-2023 Spreading of earth and sand in required thickness as per direction of officer-in-charge including all cost of labour charges, hire charges of machineries etc complete. (cost of earth and jamuna sand to be paid separately).( Based on CPWD 30.2.8)
od169570/2023_2024 : SKF_OD 10/2022-2023 Consolidation of sub grade with power road roller of 8 to 12 tonne capacity with road roller including making good the undulations etc. including all cost of labour, hire charges, fuel, oil, etc. complete. (Based on CPWD 16.1)
od169375/2023_2024 : Supply and installing Movable type premium quality outdoor Football Goal Post of size 24x8 feet made with heavy duty MS Pipe of size 4" dia for main frame with supports Back frame with PU finishing including all fittings such as premium quality Nylon net, Hooks, solid wheels etc. for elevens court.
Ground Protection Work & name board
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
7.1.1 : Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.10.1 : Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
10.25.2 : Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.61.1 : Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.71 : Lettering with black Japan pint of approved brand and manufacture
Bidder Name
SUNIL
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1057208.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .