Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.9 LAccepted-AOC | ₹36.9 L Quoted ₹31.3 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹31.4 L+₹5,839.34 (0.19%)Rejected-Finance | ₹31.4 L+₹5,839.34 (0.19%) | L2 | Rejected-Finance ok |
| 3 | L3₹31.4 L+₹12,002.34 (0.38%)Rejected-Finance VILLAGE BHITRALI PO HATHIPAON DISTT DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹31.4 L+₹12,002.34 (0.38%) | L3 | Rejected-Finance ok |
| Sl No | Description | Qty | Unit | MAHENDRA SINGH L3 | AVTAR SINGH FARSWAN L2 | kali ram L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation of soil,stone,boulders | 156.32 | cum | 467 ₹73,001.44 | 467 ₹73,001.44 | 450 ₹70,344 Lowest |
| 2.00 | R.R.Stone Masonary in 1:6 cement & sand mortar | 106.36 | cum | 4,303.3 ₹4,57,698.99 | 4,303 ₹4,57,667.08 | 4,300 ₹4,57,348 Lowest |
| 3.00 | RCC M-20 1:1.5:3 | 104.35 | cum | 8,346.36 ₹8,70,942.67 | 8,346 ₹8,70,905.1 | 8,300 ₹8,66,105 Lowest |
| 4.00 | Supplying, Fitting and Placing HYSD/TMT reinforcement in foundation complete as per drawing and technical specifications Clauses 1000 and 1202 | 81.91 | Qtl. | 6,898.8 ₹5,65,080.71 | 6,898 ₹5,65,015.18 | 6,890 ₹5,64,359.9 Lowest |
| 5.00 | Hand Packed stone filling | 3.6 | cum | 1,123.9 ₹4,046.04 | 1,120 ₹4,032 Lowest | 1,120 ₹4,032 Lowest |
| 6.00 | Dewatering from Foundation & abutments and wing walls(with pump capacity 4000 letter per Hr.) | 120 | hrs. | 291.3 ₹34,956 | 291 ₹34,920 | 290 ₹34,800 Lowest |
| 7.00 | Cement Plum concrete with 40% & 60%1:3:6 cement concrete including supply of all material labour T&P etc. Required for propar completion of the work as per drawing and techanical specification clause 802 803 1202 & 1203 of MORD Specification. | 13.5 | cum | 4,658.2 ₹62,885.7 | 4,658 ₹62,883 | 4,657 ₹62,869.5 Lowest |
| 8.00 | P/L Wire Crates with G.I wire size(3.00X1.50X1.50) | 67.5 | cum | 2,269.2 ₹1,53,171 | 2,269 ₹1,53,157.5 Lowest | 2,269 ₹1,53,157.5 Lowest |
| 9.00 | Plastering with cement mortar (1:4) 15 mm thick | 130.52 | sqm | 239.61 ₹31,273.9 | 239 ₹31,194.28 | 238 ₹31,063.76 Lowest |
| 10.00 | Providing and laying of HDPE Pipe 90 MM Dia | 1,470 | Rmt. | 564 ₹8,29,080 | 560 ₹8,23,200 Lowest | 562 ₹8,26,140 |
Tender Value
₹38.4 L
EMD Value
₹77,000
Closing Date
27 Feb 2026, 12:00 pmClosed
EE (MI)
EE (MI) Gopeshwar
C/O Check Dam and WDC Kaligaad Gadera SC Basti Pana , Dasholi
2026_MI_91498_2
E-Tender06/2025-26
Open Tender
Civil Works - Water Works
Item Wise
Gopeshwar
Please refer Tender documents.
1 document required · 1 mandatory
₹2,500
EE(MI) Division Gopeshwar
₹77,000
4 Apr 2026
16 Feb 2026
27 Feb 2026
16 Feb 2026
27 Feb 2026
16 Feb 2026
Excavation of soil,stone,boulders
R.R.Stone Masonary in 1:6 cement & sand mortar
Supplying, Fitting and Placing HYSD/TMT reinforcement in foundation complete as per drawing and technical specifications Clauses 1000 and 1202
Hand Packed stone filling
Dewatering from Foundation & abutments and wing walls(with pump capacity 4000 letter per Hr.)
Cement Plum concrete with 40% & 60%1:3:6 cement concrete including supply of all material labour T&P etc. Required for propar completion of the work as per drawing and techanical specification clause 802 803 1202 & 1203 of MORD Specification.
P/L Wire Crates with G.I wire size(3.00X1.50X1.50)
Plastering with cement mortar (1:4) 15 mm thick
Providing and laying of HDPE Pipe 90 MM Dia
100 mm HDPE Pipe Elbow (Compression)
100 mm HDPE Pipe TEE (Compression)
100 mm HDPE Pipe End (Compression)
Sighnboard & Photography
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_108742.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.68 MB
BOQ_108742.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .