| 1 | L1₹27.7 LAccepted-Finance | ₹27.7 L | L1 | Accepted-Finance Quoted L1 Rate |
| 2 | L2₹28.3 LRejected-Finance | ₹28.3 L | L2 | Rejected-Finance Quoted L2 Rate |
| 3 | L3₹29.6 LRejected-Finance | ₹29.6 L | L3 | Rejected-Finance Quoted L3 Rate |
| Sl No | Description | Qty | Unit | D S M AND CO L1 | MANOHARAN AND CO L3 | K SURESH L2 |
|---|---|---|---|---|---|---|
| 1.00 | Ricemill to School at Ullur Village in Veliyanur Panchayat KM 0/0-0/8 Picking the existing mettaled surface and sectioning including all labour charges etc, complete. | 962.5 | Sqm | 23.3 ₹22,426.25 | 50 ₹48,125 | 30 ₹28,875 |
| 2.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms KM - 0/0-1/0 | 46.2 | Cum | 367.8 ₹16,992.36 | 450 ₹20,790 | 375.16 ₹17,332.39 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 360.94 | Cum | 3,053.96 ₹11.0 L | 3,000 ₹10.8 L | 3,115.04 ₹11.2 L |
| 4.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 2,887.5 | Sqm | 87.6 ₹2.5 L | 100 ₹2.9 L | 89.35 ₹2.6 L |
| 5.00 | Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete | 2,887.5 | Sqm | 20.63 ₹59,569.13 | 50 ₹1.4 L | 21.04 ₹60,753 |
| 6.00 | Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 72.19 | Cum | 12,134.42 ₹8.8 L | 12,500 ₹9.0 L | 12,377.11 ₹8.9 L |
| 7.00 | Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete | 3 | Nos | 573.78 ₹1,721.34 | 890 ₹2,670 | 585.26 ₹1,755.78 |
| 8.00 | Provision for 60cm Wquilateral Triangle Cautionary Board | 3 | Nos | 4,991.5 ₹14,974.50 | 5,500 ₹16,500 | 5,091.33 ₹15,273.99 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount | 4,22,444 ₹4.2 L | 4,51,153 ₹4.5 L | 4,31,970 ₹4.3 L |
Updated dates
Tender Value
₹28.4 L
EMD Value
₹29,000
Closing Date
27 Jan 2026, 3:00 pmClosed
Project Director
DRDA, Tiruchirappalli
Strenthening of the Road From Ricemill to School at Ullur Village in Veliyanur Panchayat Km 0/0 - 0/800. Musiri Block, Tiruchirappalli Dist under Savings fund 25-26, pkg 6
2026_RDTN_641095_6
E1/4185/2025, dt.08.01.2026
Open Tender
Civil Works - Roads
180 days
Tiruchirappalli
Enclosed
5 documents required · 5 mandatory
₹0
₹29,000
12.01.2026
23 Feb 2026
9 Jan 2026
27 Jan 2026
9 Jan 2026
27 Jan 2026
9 Jan 2026
12 Jan 2026
Ricemill to School at Ullur Village in Veliyanur Panchayat KM 0/0-0/8 Picking the existing mettaled surface and sectioning including all labour charges etc, complete.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms KM - 0/0-1/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Provision for 60cm Wquilateral Triangle Cautionary Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.24 MB
TechBid06.pdf
Tender Documents • 0.66 MB
PriceBid06.pdf
Additional Documents • 0.29 MB
BOQ_767951.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid