Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹47.3 L+₹11.2 L (30.9%)Admitted-Finance DUNIYAGANJ DUNIYAGANJ PHULPUR PHULPUR ALLAHABAD UTTAR PRADESH 212402 | PRAYAGRAJ | UTTAR PRADESH | 212402 | L2 | Admitted-Finance | |
| 3 | L3₹47.8 L+₹11.7 L (32.2%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹47.9 L+₹11.8 L (32.5%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹49.2 L+₹13.0 L (36.0%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Kunwar Construction L5 | M/S DEEPAK KUMAR SINHA L7 | M/s friend enterprises L4 | M/s Ramgarh Raj Construction Pvt Ltd L9 | upadhyay engineers and consultant L10 | M/S Parmar Construction L6 | ABJ Pest Control L1 | M/s Popatlal A Rathod L3 | SHUBHAM CONSTRUCTION COMPANY L2 | simplex infra project L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster on brick wall or concrete surface etc including raking out joints hacking for key scrubbing down with water etc & removing the debris from the premises upto 500 m from the MOD land complete all as specified and directed | 290 | Sqm | 115 ₹33,350 | 80 ₹23,200 | 50 ₹14,500 | 108 ₹31,320 | 100 ₹29,000 | 106 ₹30,740 | 40 ₹11,600 Lowest | 65 ₹18,850 | 94 ₹27,260 | 50 ₹14,500 |
| 2.00 | M & L for chipping removing carefully concrete work by low impact hammer, breakar without damaging the structure & cleaning and disposal of debries out side the premises etc complete all as specified and directed by Engr-in Charge. Hard concrete should not be removed by force. | 80 | Sqm | 110 ₹8,800 | 80 ₹6,400 | 100 ₹8,000 | 112 ₹8,960 | 105 ₹8,400 | 109 ₹8,720 | 100 ₹8,000 | 50 ₹4,000 Lowest | 97 ₹7,760 | 200 ₹16,000 |
| 3.00 | M&L for Clean existing reinforcement with wire/ rotary wire brush making the surfaces free from loose material dirt etc complete, Applying two coats of alkaline rust converting primer FEOVERT of Krishna conchem or Dr. Fixit equivalent confirming to ASTM-B-117 on the rebars, including cleaning the reinforcement, wire brushing to remove loose rust spalls, with time interval of 6 hour between the coats and applying protective coating IPNET-RB complete all as specified and directed by Engr-in Charge. | 80 | Sqm | 180 ₹14,400 | 300 ₹24,000 | 180 ₹14,400 | 178 ₹14,240 | 175 ₹14,000 | 177 ₹14,160 | 150 ₹12,000 Lowest | 300 ₹24,000 | 158 ₹12,640 | 400 ₹32,000 |
| 4.00 | M&L Carry out application of 'Bi-polar migratory corrosion inhibitor' EPCO-KP-100 or equivalent on concrete surface.complete all as specified and directed by Engr-in Charge. | 80 | Sqm | 170 ₹13,600 | 350 ₹28,000 | 150 ₹12,000 Lowest | 170 ₹13,600 | 180 ₹14,400 | 168 ₹13,440 | 200 ₹16,000 | 300 ₹24,000 | 150 ₹12,000 Lowest | 400 ₹32,000 |
| 5.00 | M&L for Providing and applying structural grade EPIBOND-21-LP prior to application of any type of mortar plaster conferming to ASTM-C-882-91 (Arizona Slant Shear Test) to ensure bond between old concrete and new concrete. | 80 | Sqm | 415 ₹33,200 | 450 ₹36,000 | 400 ₹32,000 | 418 ₹33,440 | 420 ₹33,600 | 414 ₹33,120 | 200 ₹16,000 Lowest | 300 ₹24,000 | 360 ₹28,800 | 500 ₹40,000 |
| 6.00 | M&L for Building up the profile of structural members by using latex additives(MONOBOND) modified air cured mortar system (Polymer modified mortar) (1:5:15 =1-MONOBOND, 5-Cement, 15-Sand) in damaged areas in 20mm thickness including leveling profiling etc complete all as specified and directed by Engr-in Charge. | 40 | Sqm | 850 ₹34,000 | 550 ₹22,000 | 850 ₹34,000 | 850 ₹34,000 | 850 ₹34,000 | 846 ₹33,840 | 300 ₹12,000 Lowest | 600 ₹24,000 | 750 ₹30,000 | 400 ₹16,000 |
| 7.00 | M&L for Building up the profile of structural members by using latex additives(MONOBOND) modified air cured mortar system (Polymer modified mortar) (1:5:15 =1-MONOBOND, 5-Cement, 15-Sand) in damaged areas in 40mm thickness in two layers including leveling profiling etc complete all as specified and directed by Engr-in Charge. | 40 | Sqm | 1,490 ₹59,600 | 550 ₹22,000 | 1,500 ₹60,000 | 1,493 ₹59,720 | 1,500 ₹60,000 | 1,489 ₹59,560 | 400 ₹16,000 Lowest | 800 ₹32,000 | 1,330 ₹53,200 | 500 ₹20,000 |
| 8.00 | M & L for replacement of steel reinforcement with TMT bars of appropriate size where 20% of cross section is reduced including dismantling of rusted steel including application of rust converter FEOVERT and applying protective coating IPNET-RB complete all as specified and directed by Engr-in-Charge. | 130 | Kg | 135 ₹17,550 | 140 ₹18,200 | 120 ₹15,600 | 120 ₹15,600 | 125 ₹16,250 | 122 ₹15,860 | 100 ₹13,000 Lowest | 160 ₹20,800 | 109 ₹14,170 | 120 ₹15,600 |
| 9.00 | M&L for rendering 15 mm thick on brick masonry/concrete surface etc in cement mortar (1:4) surface finished even & smooth without using extra cement complete all as specified and directed. | 150 | Sqm | 350 ₹52,500 | 350 ₹52,500 | 300 ₹45,000 | 340 ₹51,000 | 350 ₹52,500 | 345 ₹51,750 | 200 ₹30,000 Lowest | 330 ₹49,500 | 304 ₹45,600 | 250 ₹37,500 |
| 10.00 | M&L for rendering 15 mm thick cement plastering on fair face of brick masonry /concrete surface etc in cement mortar (1:6) surface finished even & smooth without using extra cement complete all as specified and directed. | 80 | Sqm | 215 ₹17,200 | 300 ₹24,000 | 250 ₹20,000 | 220 ₹17,600 | 220 ₹17,600 | 212 ₹16,960 | 200 ₹16,000 | 300 ₹24,000 | 185 ₹14,800 Lowest | 250 ₹20,000 |
Tender Value
₹48.1 L
EMD Value
₹96,132
Closing Date
11 Jul 2026, 6:00 pmClosed
GE RAMGARH CANTT
RAMGARH CANTT
SPECIAL REPAIR TO BLDG NO P-95 OFFRS MESS (EXCLUDING ROOF TREATMENT AND NEWLY ADDN/ALTN PORTION) AT SRC, RAMGARH CANTT
2026_MES_772101_1
8300/3385/E8
Open Tender
Civil Works
Item Rate
180 days
RAMGARH CANTT
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GE RAMGARH CANTT
₹96,132
Yes
30 Jul 2026
13 Jun 2026
18 Jul 2026
13 Jun 2026
11 Jul 2026
4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down cement plaster on brick wall or concrete surface etc including raking out joints hacking for key scrubbing down with water etc & removing the debris from the premises upto 500 m from the MOD land complete all as specified and directed | 290 | Sqm | 100 | ₹29,000 |
| 2 | M & L for chipping removing carefully concrete work by low impact hammer, breakar without damaging the structure & cleaning and disposal of debries out side the premises etc complete all as specified and directed by Engr-in Charge. Hard concrete should not be removed by force. | 80 | Sqm | 100 | ₹8,000 |
| 3 | M&L for Clean existing reinforcement with wire/ rotary wire brush making the surfaces free from loose material dirt etc complete, Applying two coats of alkaline rust converting primer FEOVERT of Krishna conchem or Dr. Fixit equivalent confirming to ASTM-B-117 on the rebars, including cleaning the reinforcement, wire brushing to remove loose rust spalls, with time interval of 6 hour between the coats and applying protective coating IPNET-RB complete all as specified and directed by Engr-in Charge. | 80 | Sqm | 10 | ₹800 |
| 4 | M&L Carry out application of 'Bi-polar migratory corrosion inhibitor' EPCO-KP-100 or equivalent on concrete surface.complete all as specified and directed by Engr-in Charge. | 80 | Sqm | 10 | ₹800 |
| 5 | M&L for Providing and applying structural grade EPIBOND-21-LP prior to application of any type of mortar plaster conferming to ASTM-C-882-91 (Arizona Slant Shear Test) to ensure bond between old concrete and new concrete. | 80 | Sqm | 10 | ₹800 |
| 6 | M&L for Building up the profile of structural members by using latex additives(MONOBOND) modified air cured mortar system (Polymer modified mortar) (1:5:15 =1-MONOBOND, 5-Cement, 15-Sand) in damaged areas in 20mm thickness including leveling profiling etc complete all as specified and directed by Engr-in Charge. | 40 | Sqm | 10 | ₹400 |
| 7 | M&L for Building up the profile of structural members by using latex additives(MONOBOND) modified air cured mortar system (Polymer modified mortar) (1:5:15 =1-MONOBOND, 5-Cement, 15-Sand) in damaged areas in 40mm thickness in two layers including leveling profiling etc complete all as specified and directed by Engr-in Charge. | 40 | Sqm | 10 | ₹400 |
| 8 | M & L for replacement of steel reinforcement with TMT bars of appropriate size where 20% of cross section is reduced including dismantling of rusted steel including application of rust converter FEOVERT and applying protective coating IPNET-RB complete all as specified and directed by Engr-in-Charge. | 130 | Kg | - | - |
| 9 | M&L for rendering 15 mm thick on brick masonry/concrete surface etc in cement mortar (1:4) surface finished even & smooth without using extra cement complete all as specified and directed. | 150 | Sqm | 100 | ₹15,000 |
| 10 | M&L for rendering 15 mm thick cement plastering on fair face of brick masonry /concrete surface etc in cement mortar (1:6) surface finished even & smooth without using extra cement complete all as specified and directed. | 80 | Sqm | 100 | ₹8,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
3385tenderdocuments.pdf
Tender Documents • 2.27 MB
BOQ_864554.xls
BOQ • 0.37 MB
dateamend3385.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .