Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance N 3 91 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹92.4 L (69.7%)Admitted-Finance B 1 E 27 MOHAN COOPERATIVE INDUSTRIAL ESTATE MATHURA ROAD NEW DELHI 110044 INDIA | SOUTH EAST | DELHI | 110044 | ₹2.2 Cr+₹92.4 L (69.7%) | L2 | Admitted-Finance |
| 3 | L3₹4.6 Cr+₹3.3 Cr (245.8%)Admitted-Finance F 33 3 OKHLA INDUSTRIAL AREA PHASE 2 DELHI 110020 | SOUTH | DELHI | 110020 | ₹4.6 Cr+₹3.3 Cr (245.8%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ARKITECHNO CONSULTANTS (INDIA) PVT. LTD. L1 | LEA Associates South Asia Pvt. Ltd. L2 | Almondz Global Infra Consultant Limited L3 |
|---|---|---|---|---|---|---|
| 1.00Remuneration for Local Staff (inclusive of per Diem allowance) | ||||||
| 2.00PROFESSIONAL Staff | ||||||
| 3.00 | Team Leader cum Senior Highway Engineer/Pavement Engineer | 6 | Man Months | 1,50,000 ₹9,00,000 Lowest | 1,50,000 ₹9,00,000 Lowest | 2,00,000 ₹12,00,000 |
| 4.00 | Senior Bridge Engineer/ Structural Engineer | 3 | Man Months | 1,20,000 ₹3,60,000 Lowest | 1,40,000 ₹4,20,000 | 1,20,000 ₹3,60,000 Lowest |
| 5.00 | Senior Geotechnical Engineer cum Tunnel Expert | 6 | Man Months | 1,40,000 ₹8,40,000 Lowest | 3,50,000 ₹21,00,000 | 1,80,000 ₹10,80,000 |
| 6.00 | Senior Geologist | 2 | Man Months | 1,40,000 ₹2,80,000 Lowest | 2,50,000 ₹5,00,000 | 1,40,000 ₹2,80,000 Lowest |
| 7.00 | Senior Survey Engineer | 4 | Man Months | 75,000 ₹3,00,000 Lowest | 1,50,000 ₹6,00,000 | 1,30,000 ₹5,20,000 |
| 8.00 | Traffic and Safety Expert | 2 | Man Months | 85,000 ₹1,70,000 Lowest | 1,50,000 ₹3,00,000 | 1,30,000 ₹2,60,000 |
| 9.00 | Environmental Specialist | 3 | Man Months | 75,000 ₹2,25,000 Lowest | 1,50,000 ₹4,50,000 | 1,20,000 ₹3,60,000 |
| 10.00 | Sr. Quantity Surveyor/Documentation Expert cum Material Engineer | 6 | Man Months | 85,000 ₹5,10,000 Lowest | 1,00,000 ₹6,00,000 | 1,20,000 ₹7,20,000 |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
22 Dec 2022, 3:00 pmClosed
Vivekanand Jaiswal
NHIDCL, HQ
Widening of existing c/way into 2-lane with PS config. and treatment of vulnerable sliding/sinking zones, Imp. of safety and sustainability by incorporating Bypass, Viaducts, Tunnels, etc along NH10 from Km52 (Rangpo) to Km80 (Ranipool) in Sikkim.
2022_NHIDC_720398_1
NHIDCL/Sikkim/DPR/ NH-10(Rangpo-Ranipool)/2022
Open Tender
Consultancy
Lump-sum
180 days
Sikkim
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
MD NHIDCL
₹2 L
NHIDCL HQ, New Delhi
7 Feb 2023
28 Oct 2022
23 Dec 2022
28 Oct 2022
22 Dec 2022
28 Oct 2022
2 Dec 2022
Amount
Remuneration for Local Staff (inclusive of per Diem allowance)
PROFESSIONAL Staff
Team Leader cum Senior Highway Engineer/Pavement Engineer
Senior Bridge Engineer/ Structural Engineer
Senior Geotechnical Engineer cum Tunnel Expert
Senior Geologist
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist
Sr. Quantity Surveyor/Documentation Expert cum Material Engineer
Land Acquistion cum Utility Expert
Sub-Professional Staff: (To be assessed by Consultant as per requirement of assignment out of which 3 nos. sub-professional having 3 years experience and 2 nos. sub-professional be a fresh graduate)
Bridge Engineer
Assistant Highway Cum Pavement Engineer
Assistant Material-cum-Geotechnical Engineer-Geologist
Survey Engineer
Assistant Quantity Surveyor/Documentation Expert
Support Staff (Fixed Rates)
Office Manager (1 No.)
Typist (1 No.)
Office Boy (1 No.)
Night Watchman (1 No.)
Transportation (Fixed Costs)
The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (3 Vehicle for 6 months each)
Duty Travel to Site (Fixed Costs)
All Trips
Office Rent (Fixed Costs)
The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services.
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication
Office Furniture and Equipment (Fixed costs)
Office Furniture and Equipment
Reports and Document (Fixed costs)
Monthly Report (03 sets)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)
LA & Clearances II Report
Survey and Investigation
A. Topographical Survey (Fixed Rate)
Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.
B. Investigation (Fixed cost)
All investigations/surveys including Road and Bridge Inventory, FWD Test and Pavement Evaluation, Roughness Survey, Axle Load Survey, Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies, Land Acquisition Studies, any other investigation surveys etc.
Net Work Survey and GPR
Net work Survey of the existing Highways as a repository for civil work as per directions from Authority.
GPR Survey for detection of under ground utilities
Sub-soil Investigation & Other Works
Sub-Soil Investigation
a) Boring in all type of soils (other than hard rock)
b) Boring in hard rock
Cost of supply and fixing Boundary Pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval.
Land Acquisition Team including support staff and logistics/transportation
A. Land acquisition Team including support staff
Ex-Land Revenue Inspector/Officer or equivalent
Ex-Kanoongo/ Girdawar or equivalent
Ex-Patwari or equivalent
Typist
B. Logistics for Land acquisition Team
Computer including necessary peripherals (02 nos for 04 months each)
Printers (02 nos for 04 months each)
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km (01 no)
LEA Associates South Asia Pvt. Ltd.
Almondz Global Infra Consultant Limited
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .