Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC KERALA KL | ₹8.5 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SHANAVAS P K L1 |
|---|---|---|---|---|
| 1.00Thode side Protection | ||||
| 1.00 | OD234928/2025-2026:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges: Dry rubble masonry. | 48.78 | cum | 900.96 ₹43,945.22 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 135.35 | cum | 236.63 ₹32,027.87 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 81.12 | cum | 330.41 ₹26,802.86 |
| 1.00 | OD234929/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 153.56 | cum | 3,668.07 ₹5.6 L |
| 1.00 | OD234930/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with departmental rubble including packing to compactness to lines and levels and labour charges etc. complete as per direction of Departmental officers at site | 29.27 | cum | 1,576 ₹46,123.22 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 58.8 | sqm | 700.72 ₹41,202.34 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 11.07 | cum | 8,483.41 ₹93,953.77 |
Tender Value
₹8.5 L
EMD Value
₹21,183
Closing Date
20 Jan 2026, 5:00 pmClosed
ASST.EXECUTIVE ENGINEER
LID and EW Division Kozhikkode
Thodu side kettu
2025_LSGD_815259_2
TA/LSGD/KKD/194/2025-26
Open Tender
Civil Works - Others
180 days
Thamarassery
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,870
Yes
₹21,183
Yes
7 Apr 2026
13 Jan 2026
22 Jan 2026
13 Jan 2026
20 Jan 2026
13 Jan 2026
Thode side Protection
OD234928/2025-2026:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges: Dry rubble masonry.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD234929/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD234930/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with departmental rubble including packing to compactness to lines and levels and labour charges etc. complete as per direction of Departmental officers at site
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
SBD.pdf
Tender Documents • 1.68 MB
BOQ_1388360.xls
BOQ • 0.23 MB
newtenderconditions.pdf
Additional Documents • 0.30 MB
Download all tender documents and submit your bid