Loading…
Loading…
Tender Value
₹81.9 L
EMD Value
₹1.6 L
Closing Date
12 Jun 2026, 3:00 pm6d left
CHIEF ENGINEER
NAGAR NIGAM BAREILLY
Construction work of rcc drain and bricks drain from nasheman colony to akash ganga colony and nisha enclave in ward 17.
2026_DOLBU_1156448_1
73/CE/CD/NNB/26-27 (2 To 6) Sr No 4 Tender List 6 Date-01.06.2026
Open Tender
Civil Works
180 days
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹9,676
Bareillye-tender.com
₹1.6 L
4 Jun 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete or brick or granolithic floors.including base concrete and stacking of dismantlled materials as directed by E/I.within a distance of 60.00M.(S.I.No.697) | 3.75 | CUM | 70 | ₹262.5 | BI01010001010000000000000515BI0100001115 |
| 2 | Dismantling of old damage brick work and stone work i/c stacking of dismantlled materials as directed by E/I.within a distance of 60.00M. (S.I.No.692) | 0.73 | CUM | 610 | ₹445.3 | BI01010001010000000000000515BI0100001116 |
| 3 | Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches. excluding royalty.( S.I. No.251) | 937.5 | CUM | 225 | ₹2,10,937.5 | BI01010001010000000000000515BI0100001117 |
| 4 | Excavation in foundation in ordinary Soil (Loam, Clay or sand) including, lift upto 1.50 M and lead Upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30.0m from the foundation trencches. excluding royalty.( S.I. No.251) | 348.2 | CUM | 195 | ₹67,899 | BI01010001010000000000000515BI0100001117 |
| 5 | Cartage of Surplus malwa upto 5km. | 1,091.24 | CUM | 183.5 | ₹2,00,242.54 | BI01010001010000000000000515BI0100001123 |
| 6 | Providing and laying cement concrete in 1:4:8 (1 cement : 4 C sand : 8 stone ballast 40 mm gauge) and curing complete, including cost of form work in foundation and floors-completion of the work as per direction of E/ I. | 86.25 | CUM | 6,980 | ₹6,02,025 | BI01010001010000000000000515BI0100001118 |
| 7 | R.C.C. work with cement,approved coarse sand and 4cm gauge stone ballast in proportions of 1:2:4 in raft and foundation excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.G G.I wire and including necessary centring and shuttering etc.and also including supply of all materials labour ,tools & plants etc required for proper completion of work. Binding wire cost being included in the item,(S.I.No.287) | 131.25 | CUM | 7,915 | ₹10,38,843.75 | BI01010001010000000000000515BI0100001119 |
| 8 | R.C.C. work with cement,approved coarse sand and 4cm gauge stone ballast in proportions of 1:1.5:3 in wall and coloumn excluding supply of reinforcement and its bending but including its fixing & binding the same with 24 B.W.G G.I wire and including necessary centring and shuttering etc.and also including supply of all materials labour ,tools & plants etc required for proper completion of work. Binding wire cost being included in the item,(S.I.No.289) | 202.5 | CUM | 8,700 | ₹17,61,750 | BI01010001010000000000000515BI0100001120 |
| 9 | RCC 1:2:4 with cement c'sand stone grit of 20 mm gauge in slab of culvert excluding supply of reinforcement with its bending but including its binding & fixing with supply of all meterial labour T&P etc. required for proper completion of the work. SI No. 284 | 21 | CUM | 8,260 | ₹1,73,460 | BI01010001010000000000000515BI0100001121 |
| 10 | Mild steel or Iron for plain work such as reinforced concrete brought to proper shape as necessary including its bending with supply of steel with overlaps & wastage also required for proper completion of the work as per E/I SI No. 504 | 417.72 | QTL | 8,870 | ₹37,05,176.4 | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 28.30 MB
BOQ_2166885.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid