Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹12.2 L+₹1.4 L (12.5%)Rejected-AOC | L2 | Rejected-AOC Not lowest | |
| 3 | L3₹12.3 L+₹1.4 L (12.6%)Rejected-AOC | L3 | Rejected-AOC Not lowest | |
| 4 | L4₹15.1 L+₹4.2 L (38.4%)Rejected-AOC | L4 | Rejected-AOC Not lowest |
Tender Value
₹15.5 L
EMD Value
₹31,000
Closing Date
5 Sept 2020, 9:00 amClosed
GE UTILITY SECUNDERABAD
GE UTILITY , MUDFORT, SECUNDERABAD-500003
CONSULTANCY SERVICES FOR CONSTRUCTION OF STP OF CAPACITY APPX 3.8 MLD AT AOC SECUNDERABAD
2020_MES_367522_1
GE(U)/SEC/TOKEN/33 OF 2020-21
Open Tender
Consultancy Services
Item Rate
60 days
SECUNDERABAD
AS per NIT
6 documents required · 6 mandatory
₹500
GE UTILITY SECUNDERABAD
₹31,000
Yes
17 Sept 2020
8 Aug 2020
7 Sept 2020
8 Aug 2020
5 Sept 2020
24 Aug 2020
Amount
Topographical Surveys of area including survey of existing sewage system for preparation and supply of L Section, Contour map (0.5 m intreval) in relation to design of Central sewage scheme for designated area of Secunderabad. Survey shall also include verification and establishment of Invert level at Branch trunk and main sewers and man holes at an intreval of 30 metres for the area as per drawings. During survey, all buildings of surveying area to be superimposed on the drawings along with its building number. The details of the buildings pocket wise along with its size, building no. and type (Office/OTM/Md Accn/SM Barracks, etc) to be provided in a seperate sheet
Boring 150 mm dia through all kinds of soil upto a depth of 10 mtrs for bldgs below ground level or upto SPT strength value>50, collecting samples and conducting necessary field tests as per the following parameters:- (a)Depth of bore holes may be taken minimum 10 mtrs or 'N' value reaches 50, which ever is earlier (b) SPT values at every 0.75 m intervals and change of strata. (c)Grain size distribution and analysis. (d) Soil characteristics. (e) Value of Cohesion and angle of internal friction. (f) Recommended SBC at different depths of foundation i.e. at 1500 mm, 2000 mm, 2500 mm. (g) SBC and its calculation based on 'N' value sheet strength and settlement criteria should be worked out for following size of footing 1.5x1.5, 1.5x2.5, 2x2.5& 2x3 m. (h) Depth of water table (maximum and minimum). (j) Depth of expansive soil and its properties, if any. (k) Recommendation for type of foundation. (l) Recommendation as regards possibility of liquification of soil in case of standard or partially saturated or uncompacted sandy soil. (m) Recommedation for filling under floors and filling under protection including plinth protection. (n) Chemical analysis of soil. (o) Details of soil profile. (p) Any other recommendations. (q) Charges for Mobilisation of equipment & shifting of Rigs from one bore hole location to another bore hole location.
S K CONSULTANCY & LABORATORY
SMIT CONSULTING ENGINEERS
S.M. Consultants
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .