| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.5 Laccepted-aoc | ₹6.5 L | accepted-aoc |
Tender Value
₹6.3 L
EMD Value
₹6,264
Closing Date
6 Apr 2026, 1:30 pmClosed
TENALI MUNICIPALITY
Tenali
Laying of cc approaches & Construction of culvert at opp. Siva Shilpasala, outside of Busstand in 37th ward of Tenali Municipality under 15th FC 2024-25 Untied grant (1st Instalment) 2ND CALL
918857
23/2025-26/15th FC Grant
OPEN - NCB
Civil Works
GUNTUR
7 documents required · 5 mandatory · 2 optional
₹222
₹6,264
21 Apr 2026
30 Mar 2026
30 Mar 2026
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH. Cement concrete Air compressor 210/250 cfm with 2 leads of pneumatic breaker
Earthwork in excavation for roads as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH etc.,complete as Directed by the Departmental Authroties.
Sand Filling of foundation trenches as per drawing and technical specification in Clause 305.3.9 MORD & 304 MORTH
Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture including cost and conveyance of all materials, labour charges, machine mixing charges, curing charges etc., complete as per S.S.
Providing Cemenet Concrete for plain/reinforced concrete (M15) using 20 mm size Graded hard stone aggregate , mechanically mixed, placed in position and compacted by vibration including curing etc., complete as per drawings and technical specifications and as Directed by the Departmental Authroties. for Drain Bed
Providing Cemenet Concrete for plain/reinforced concrete (M15) using 20 mm size Graded hard stone aggregate , mechanically mixed, placed in position and compacted by vibration including curing etc., complete as per drawings and technical specifications and as Directed by the Departmental Authroties For Drain Walls
VRCC M-30 Design mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for Retaining Wall.
Vibrated cement concrete M 30 grade design mix using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, ting, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification and as directed by the Engineer-in-Charge for C.C Pavement.
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work as per SS and as Directed by the Departmental Authroties.( APSS No.126)
Carting away the surplus excavated earth from the work site with a lead of 2.00 Km beyond initial lead including loading, unloading and conveyance but exclding stacking charges etc., complete.
Bailing out water from the trenches with oil engine driven pump sets, including hire charges, fuel charges and wages for Driver and Helper upto 5HP capacity pumps - 1 HP/Hr.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
10.NIT, Schedule Part - 2.xls
TENDER_DOCUMENT • 0.05 MB
10.Tender-Doc_-_Corrected.doc
TENDER_DOCUMENT • 0.30 MB
New Microsoft Excel Worksheet (2).xlsx
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .