Loading…
Loading…
Tender Value
₹3.6 L
EMD Value
₹3,592
Closing Date
15 Jun 2026, 5:00 pm
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
Construction of three seated Public Toilet inside BRI CLUB ground Ward No. 05 of Birmitrapur Municipality.
2026_ORULB_130676_11
EO/BRMP/02/2026-27
Open Tender
Civil Works - Others
90 days
BIRMITRAPUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹3,592
Yes
4 Jun 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
15 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with initial lead and lift including rough dressing and leveling the bed and depositing the soil away as directed by E.I.C . | 21.93 | cum | 282.88 | ₹6,203.56 |
| 2 | Sand filling with filling sand inside F and P including watering and ramming, cost of material, labour, conveyance all taxes T and P etc. complete. | 3.34 | cum | 738.69 | ₹2,467.22 |
| 3 | Metal concrete (1 :4 : 8) using 40mm size CBG metal with all cost of material, labour, conveyance, royalty, taxes T and P etc. complete. | 2.63 | cum | 5,822.49 | ₹15,313.15 |
| 4 | Fly ash brick work with cm(1:6) in F & P with all costof material, labour charges, conveyance all taxes curing & all T & P etc complete. | 10.45 | cum | 5,582.36 | ₹58,335.66 |
| 5 | Fly ash brick work with cm(1:6) in super structure with all costof material, labour charges, conveyance all taxes curing & all T & P etc complete. | 4.99 | cum | 5,615.36 | ₹28,020.65 |
| 6 | R.C.C. M20 grade concrete using 20mm & down grade CBG Chips with all cost of material,labour, royalty, Taxes all T and P etc. complete including centering and shuttering etc. complete. | 3.03 | cum | 6,189.75 | ₹18,754.94 |
| 7 | Labour for M.S reinforcement for cutting, bending, binding, tying the grills and placing in position etc. including cost of binding wire 18 to 20 guage and cost of steel. | 2.73 | Qntl | 8,597.28 | ₹23,470.57 |
| 8 | Rigid smooth centering shuttering for R.C.C.work including all cost etc complete
i.Plinth Bend | 2.42 | sqm | 249.82 | ₹604.56 |
| 9 | ii.WB | 3.02 | sqm | 1,219.7 | ₹3,683.49 |
| 10 | iii.Slab | 20.48 | sqm | 769.19 | ₹15,753.01 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_594241.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid